NBS Source

"handrail"

248 results found

Sort by:

Showing 1-36 of 103

Exmouth Beach Stainless Steel Handrailing

Exmouth Beach Stainless Steel Handrailing

Architectural Street Furnishings part of WB White Foundry

ASF used the Exmouth Stainless Steel Post and Rail system to manufacture bespoke handrailing for the new handrail installations at Exmouth Beach. Manufactured in marine grade 316 stainless steel and finished bright polished to avoid discoloration, each of the 12 stepped areas required individually measuring and bespoke rails manufatured to suit.
ASF 5006 Handrailing at Bradford Library Steps

ASF 5006 Handrailing at Bradford Library Steps

Architectural Street Furnishings part of WB White Foundry

ASF were approached to replace some tired yet serviceable handrailing at the old Bradford Library in a change of use project. ASF used the popular 5006 posts with mitred tops and supplied a large central double handrail alongside a single handrail for a walled section. There was also a small section of single handrail supplied for a small side entry to the area. Pleasingly, ASF mitred the top of the bollard to match the angle of descent of the steps rather than just do them at the usual 45 degrees.ASF combined this with glass balustrade for the elevated walkway on the building concourse, which can be seen on some of the images.
White City, London. Illuminated handrailing

White City, London. Illuminated handrailing

Architectural Street Furnishings part of WB White Foundry

ASF supplied a combination of linear and spot light handrailing to the White City regeneration project for step units, ramps and general walkways. The lighting was decorative in the main with some areas requiring task lighting where there was a need to supplement the overhead lighting
Fishguard Primary School - Balustrade and Handrails

Fishguard Primary School - Balustrade and Handrails

HEWI (UK) Ltd

At Fishguard Primary School HEWI provided a safe environment for the children whilst blending aesthetically with the theme of the building. Coloured polyamide was chosen for the main staircase with clear safety glass infll, soft touch door handles where used throughout. Externally, Circum satin finish grade 316 stainless steel was chosen for all areas, including access ramps and steps from the car park, with post mounted handrails and perforated stainless steel infll. Safety glass panels, in clear and 5 differing colours was used on a balcony. Matching perforated stainless steel infll panels were incorporated on stairs.
ASF 128 Bollard  / Step Unit Handrail

ASF 128 Bollard / Step Unit Handrail

Architectural Street Furnishings part of WB White Foundry

ASF's 128 pattern cast iron bollard was used in this project as the post for a bespoke step unit. One side of the steps was fixed to a set of railings (also by ASF) by a core fixing directly to the bollard upright. The handrails themselves were bespoke manufactured mild steel, galvanised rails, with steel side mounting brackets made to mechanically fix into the ASF 128 Bollards.
Neaco handrails and balustrade featured at award-winning scheme

Neaco handrails and balustrade featured at award-winning scheme

NEACO Ltd

Neaco’s contemporary handrails and balustrade have contributed to an award-winning development at the new Barker’s Furniture Store in Northallerton. Designed by SP&Architects and constructed by Wharton Construction Ltd, the store’s mixture of new build and refurbishment won Best commercial building/scheme in the North & East Yorkshire region at Local Authority Building Control (LABC) Building Excellence Awards 2016. Neaco’s Quad stanchion was specified with tubular toprails and toughened glass infills to provide a contemporary solution on an internal stairway and mezzanine floor.
ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

ASF 5006 post and rail, post and panel and step handrailing, Sale Town Hall

Architectural Street Furnishings part of WB White Foundry

ASF produced the full gamut of variants for this project, all using the ASF 5006 mitred top post system to give continuity. 114mm diameter post uprights were used to offer a substantial framework for these barrier and handrail systems. Some areas needed only handrail so a single sided underslung system was provided, with wrap around end profiles offering a pleasing end point to individual sections.On the post and panel sections a 48mm diameter top rail was used in conjunction with stainless steel perforated panels. These meshed perfectly into the step units that swapped seamlessly from post mounted to wall mounted handrail.Curves, corners and steps were included on this project
Handrail system : Ascent Hatch Guardrail

Handrail system : Ascent Hatch Guardrail

Safety Fabrications Limited

The Ascent Roof Hatch Guardrail was developed to meet the need to protect workers as they Ascend / Descend through an open roof access hatch.. The Ascent Roof Hatch Guardrail is designed as an integral part of the roof hatch and its structure. This ensures that roof integrity is maintained – limiting potential future maintenance issues.The guardrail protects worker from a fall through the open roof hatch. The Ascent Hatch Guardrail was specified on this project by AOV Systems Ltd as part of their Safe Access strategy. Manufactured following 1090 factory production control procedures allowing CE/UKCA marking as required with all Safety critical components as per the Construction Product regulations 2022
Square Line 60x30 stainless steel balustrade + handrail lighting for London pontoon

Square Line 60x30 stainless steel balustrade + handrail lighting for London pontoon

Q-railing

The sides of the pontoon, bridge and ramp at Battersea’s river boat service required ultra safe balustrades. These had to be a natural fit to the industrial environment. The Square Line 60x30 stainless steel balustrade perfectly suited the job. Its stainless steel posts were welded to the pier for extra robustness, and toughened glass infills of 10 mm thick were added. The Q-lights Spotlight LED system was invisibly embedded in the handrails for extra safety at night. The industrial looking stainless steel elements of the Square Line 60x30 system add to the appearance of the pier.
Easy Glass Max glass balustrade + Q-lights Linear Light LED for handrails- Leeds University

Easy Glass Max glass balustrade + Q-lights Linear Light LED for handrails- Leeds University

Q-railing

Modernising historic properties can bring major challenges. The architects at Fuse Studios gave careful consideration to this question as they prepared for a refurbishment of the Fine Arts building at Leeds University. Early on, the new access ramp at the front entrance was identified as an important visual centrepiece. The architects opted to use Q-railing products, including an LED-lit handrail, when creating an ultra-safe glass railing for the ramp. Q-railing recommended the Easy Glass Max system. It is highly robust, meeting all the relevant safety requirements with ease, and yet provides an uninterrupted glazed area.
HDI CIRCUM code compliant railing and handrail selected for Airbus production facility

HDI CIRCUM code compliant railing and handrail selected for Airbus production facility

HDI Railing Systems

‘Corporate Case Study - HDI’s Circum Round Post balustrade system ends Airbus search for a code compliant design.
Google corporate building featuring HDI Optik Shoe Balustrade and Railing System

Google corporate building featuring HDI Optik Shoe Balustrade and Railing System

HDI Railing Systems

Corporate Case Study HDI’s Optik Shoe system ends Google’s search for a floating glass design. Balustrade,Railing system ,stainless steel,powder coat,Shoe system,floating,structural,laminated,tempered,led,handrail,wood handrail,smoke baffle,glass,design’
Twitter Corporate Building Featuring Code Compliant HDI Optik Boss Balustrade and Railing System

Twitter Corporate Building Featuring Code Compliant HDI Optik Boss Balustrade and Railing System

HDI Railing Systems

‘Corporate Case Study - HDI’s Optik Boss balustrade system selected for Twitter HQ. Balustrade,Railing system ,stainless steel,powder coat,Shoe system,floating,structural,laminated,tempered,led,handrail,wood handrail,smoke baffle,glass,design,code compliant,performance criteria achieved.
ASF 5006 Stainless Steel Hand Railing, Bradford Library

ASF 5006 Stainless Steel Hand Railing, Bradford Library

Architectural Street Furnishings part of WB White Foundry

A hugely popular handrail design that ASF have supplied to projects in many locations. The full sized bollards that are used as post uprights give a sense of solidity and permanence, whilst the mitred top gives them just enough of a decorative nature to lift the product beyond a simple post and handrail job. In this project all welds and interfaces were polished back on site so the finished product becomes a complete unit with no visible fixings. With both double and single handrails over multiple flights and angles, this project shows how ASF can manage any project need.
Euston Station, London

Euston Station, London

Rapid Ramp Limited

REQUIREMENT: Whilst major works were being carried out, temporary wheelchair access to an alternative entrance was necessary.The systems had to overcome the concrete steps and fully comply with Part K and M of the Building Regulations.END RESULT:The fitters worked different shifts over three days and two nights to ensure the project was completed by the deadline.The platforms include a 1:15 gradient and fully comply with Documents M & K of the Building Regulations. A step system was also fitted for able-bodied access, and mid-handrail in yellow at 600mm high was installed on both sides of all the ramps and platforms. Once the rental period is complete, the systems will be dismantled and reused in other hire projects.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and steps and distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.EXTRA FEATURES INCLUDED:Yellow Mid-Handrail - a lower handrail system designed to be used by young children and wheelchair users. Yellow is one of the easiest colours to see because of its ability to reflect light.Fully Compliant Step Unit – complies with Document M and K of the Building Regulations.GRP - a slip-resistant and non-corrosive surface. The ideal option for areas with high footfall, such as schools and public application.
Weigh Cabin Platform & Steps, Birmingham

Weigh Cabin Platform & Steps, Birmingham

Rapid Ramp Limited

PROJECT BACKGROUND: The construction of weighbridges and a weigh cabin.The cabin will be elevated 1.5m above ground level on support columns.Lorries will drive up to the cabin for initial checks before the weighbridges are used to calculate the load by weighing the lorry when empty and when loaded.REQUIREMENT:A walkway around the cabin in a L shape with steps to allow the site operatives access. ADDITIONAL INFORMATION:2D and 3D CAD drawings were created by our designer in-house. These were given to the client with their quotation.END RESULT: A Rapid Ramp platform was raised around 1.5 metres high and included steps. The appropriate height was reached with adjustable telescopic legs. Plus, cross bracing was achieved using longer length tubes to ensure rigidity under all platform legs.The system was completed within a quick three-day turnaround time.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of a step or level change.Trombone Ends - these are added to the ends of a step unit to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour: Black - Black is the standard handrail colour. Handrails are powder-coated to create a durable finish that is tougher than conventional paint.
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were scheduled to be installed on the hospital car park.A ramp with a wide metal walkway was required to safely support the diverse range of hourly traffic accessing the cabins. Traffic would include patient-moving equipment, trollies, staff, and public footfall.A fully compliant ramp was designed and installed with an extra wide metal walkway. This product has a safe loading capacity of over one tonne!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Basingstoke Hospital, Basingstoke

Basingstoke Hospital, Basingstoke

Rapid Ramp Limited

PROJECT BACKGROUND: A mobile trailer was adapted into a Covid PCR Testing Laboratory.The staff test 6-7 thousand saliva pots every three weeks.REQUIREMENT: Temporary modular steps to replace the existing ones to the trailer. The current steps were too steep and narrow, with no handrails and platform.END RESULT: We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team. Removal is a service included in our rental package. The steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
HDI’s Kubit post balustrade system installed at Lee Health Facility

HDI’s Kubit post balustrade system installed at Lee Health Facility

HDI Railing Systems

‘Corporate Case Study - HDI’s Kubit post balustrade system selected for Lee Health search for a pre engineered design. Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
Education building featuring HDI Circum LED Code Compliant Balustrade and Railing System.’

Education building featuring HDI Circum LED Code Compliant Balustrade and Railing System.’

HDI Railing Systems

Education Case Study Maryland School for the Blind installs Circum LED to entrance area. Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, oak cladding,laminated glass,led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
Healthcare Building featuring HDI’s Kubit Railing and balustrade system with Oak Cladding

Healthcare Building featuring HDI’s Kubit Railing and balustrade system with Oak Cladding

HDI Railing Systems

‘Corporate Case Study - HDI’s Oak Clad Shoe system created for Healthcare Building. Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, oak cladding,laminated glass,led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
School selects Kubit railing and balustrade system for the main staircase

School selects Kubit railing and balustrade system for the main staircase

HDI Railing Systems

Corporate Case Study - HDI’s Kubit Stainless Steel Glass system a winner for busy school stairs. Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, oak cladding,laminated glass,led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
Education Science Facility selects Optik railing and balustrade system

Education Science Facility selects Optik railing and balustrade system

HDI Railing Systems

Education Science Case Study - HDI’s Optik Shoe system ends designers search for a floating glass code compliant design. Balustrade,Railing system ,stainless steel,powder coat,Shoe system,boss system,floating,structural,laminated,tempered,led,handrail,wood handrail,smoke baffle,glass,design,code compliant,performance criteria achieved.
Commerce Business Centre Select Optik Shoe selected for busy offices

Commerce Business Centre Select Optik Shoe selected for busy offices

HDI Railing Systems

Corporate Case Study - HDI’s Optik Shoe system ends architects search for a floating glass design in a busy commerce centre Balustrade,Railing system ,stainless steel,powder coat,Shoe system,floating,structural,laminated,tempered,led,handrail,wood handrail,smoke baffle,glass,design,code compliant,performance criteria achieved.Balconies, apartments, stairs
Mono Glass Balustrades for 'The Ark', St George's Primary School

Mono Glass Balustrades for 'The Ark', St George's Primary School

Delta Balustrades Ltd

Mono M310/M311 Glass InfillSt George’s junior school is an independent Roman Catholic school with a high standard of facilities. Construction of ‘The Ark’ provided a new early years teaching block, which includes modern classrooms, a dedicated IT suite, a new assembly room and outdoor learning areas. The two-storey building has a staircase at each end and Delta Balustrades’ Mono™ system was specified with powder-coated steel balusters and 11.5mm toughened and laminated glass infill panels. The Mono™ system handrails were provided in oak to offer a warmer finish in the primary school environment and each staircase features a dual handrail with one handrail mounted at a 600mm height for the children and the other in parallel at 900mm for the teachers. The Ark features an outdoor teaching area at first floor level with a balcony accessed from the internal classrooms. Once again, Delta Balustrades’ Mono™ system was specified with powder coated balusters to match the grey of the window casings. The 11.5mm toughened and laminated glass infill panels have no handrails but have been installed at a height of 1500mm to provide additional edge protection. A further small triangular balcony at the side of the building has been specified with the same system as the main first floor balcony. At ground level, the building features steps and ramps and a combination of Mono™ balusters and Orbis™ handrails with a Sigma stainless steel finish have been used to provide guarding, with 10mm toughened glass infill panels.Finally, the stone steps leading to the nursery classrooms were specified with an Orbis™ handrail.
Villa complex adds Ferric railings and balustrades to apartment balconies

Villa complex adds Ferric railings and balustrades to apartment balconies

HDI Railing Systems

Apartments Case Study. HDI’s Ferric Glass Balustrade and Railing system ends Google’s search for a code compliant pre engineered design. Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, oak cladding,laminated glass,led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
Wincanton Primary School, Wincanton

Wincanton Primary School, Wincanton

Rapid Ramp Limited

REQUIREMENT: Replacing a worn-out wooden ramp with a compliant Rapid Ramp System.The system had to be strong enough to withstand impact from electrically operated wheelchairs, support users in the case of a fall and have handrails that confirm with BS 6180: 2011. Our ramp achieves all these requirements.Plus, the steel components of the Rapid Ramp System are zinc coated, and hot dip galvanized in accordance with BS EN ISO 14713-2:2020.All ramp handrails and guardings are powder-coated to BS EN 12206-1:2004.END RESULT: Once the wooden ramp was dismantled, the Rapid Ramp system was fitted.The ramp was fully installed by the end of day one, and day two was spent evenly distributing the rubber crumb over the walkway surface.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.EXTRA FEATURES INCLUDED:Underside Mesh Hoarding - this mesh is designed to prevent children from gaining access to the underneath of the ramp.Safetread Rubber Surface - this is a soft, slip-resistant surface that reduces the impact of falls. The product is made from the same materials used in soft play areas and is ideal for nurseries, schools, and public facilities. Plus, it is available in a range of colours and will continue to perform in all weather conditions.
Amazon Logistics Warehouse, Mansfield

Amazon Logistics Warehouse, Mansfield

Brandsafe

Summit Park in Mansfield is the site of a major logistics warehouse development for Amazon. Brandsafe was tasked with making the 500,000+ sq. ft. development safe for its new owner. Outside the building, Brandsafe supplied and installed and array of Armco safety barriers, bollards, pedestrian handrail, speed bumps and wheel stops. To complete the package, further bollards were installed inside the building, along with lift door protection, guardrail and handrail routes for pedestrians and secure cages to protect crucial infrastructure and assets.
Yattendon C Of E Primary School, Yattendon

Yattendon C Of E Primary School, Yattendon

Rapid Ramp Limited

REQUIREMENT: Compliant ramped access to the recently built outdoor classroom. END RESULT:The ground in the front of the entrance is split between tarmac and a barked area. The tarmac is slightly higher and solid, whereas the barked area is a soft surface. Due to this, weed membrane was rolled over the barked area, and the ramp feet on that side were fixed to concrete slabs.All legs were adjusted accordingly to achieve a level walkway with a compliant gradient of 1:15.The ramp fully complies with Document K and M of the Building Regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard colour: Black - Ramps are powder coated black to create a durable finish that is tougher than conventional paint.
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Rapid Ramp Limited

PROJECT BACKGROUND: Patients, staff, and visitors for the Oxford Road site of Manchester Royal Infirmary use the linking Hathersage Road Car Park daily.REQUIREMENT:A compact internal ramp for the level 2 and level 7 entrances.END RESULT:Two small internal ramps with bespoke yellow handrails and a 1:15 gradient were installed within a few hours. Our ramps come in components that were small enough to be carried into the carpark lift and onto the levels.The ramp feet were bolted into the ground to keep the systems securely in place.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURE INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and level changes.
Waverley House, Soho

Waverley House, Soho

Rapid Ramp Limited

REQUIREMENT: A modular step unit and upper landing to the basement goods lift.The new system would replace the narrow concrete steps, which were concluded to be unsafe and didn’t have handrails to prevent falls.ADDITIONAL INFORMATION:A site survey was carried out, and an in-house 3D ramp design was drawn to suit the space.The drawing shows that the air conditioning unit above the step unit would need to be moved 200mm away. END RESULT: We installed a yellow modular system straight over the existing steps within a few hours.This approach prevented the concrete steps from being removed and saved the client the extra time and money involved in hiring another trade to complete the enabling works. A bespoke platform joins the upper landing, and the feet were fixed into the concrete floor to keep the system securely in place.FEATURES INCLUDED:Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Standard Colour: Yellow – one of the easiest colours to see because of its ability to reflect light. The handrails are powder coated to create a durable finish that is tougher than conventional paint.Standard Handrail - this handrail system ensures users always have support to hold onto.
High Peak

High Peak

Canal Architectural

Canal Architectural worked closely with James Darwent Architecture to design and manufacture a bespoke curved cantilevered staircase for a property in the Peak District The mild steel staircase structure incorporated 16 timber treads with 20mm spindles and handrail, incorporating an all wax finish. A handrail was added to the staircase in American White Oak as part of a safety and architectural feature. The result was a minimalist structure that blended perfectly with the contemporary and rustic elements of the property. The talented project team worked closely with NAW Reynolds Building Limited to install the staircase in line with current regulations.
Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Rapid Ramp Limited

REQUIREMENT: Permanent wheelchair access from the new classroom entrance to the playground. The ramp required to comply with both part M and K of the building regulations.END RESULT:The Rapid Ramp included a 1:15 gradient and fully complies with documents M & K of the building regulations.The installation was completed during the summer holidays, ready before the new school year. Plus, it only took a few hours to fit and could be used immediately after.Unlike our steel Rapid Ramp System, a concrete ramp is time-consuming to install due to the drying time required and cannot be fitted in bad weather conditions, e.g. snow or rain,FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.EXTRA FEATURE INCLUDED:Mid Rail - A lower handrail system designed to be used by young children and wheelchair users.Safetread Rubber Surface - this is a soft, slip-resistant surface that reduces the impact of falls. The product is made from the same materials used in soft play areas and is ideal for nurseries, schools, and public facilities. Plus, it is available in a range of colours and will continue to perform in all weather conditions.Fully Compliant Step Unit – complies with Document M and K of the building regulations.
Q-line stainless steel baluster railing adds to waterfront entertainment venue

Q-line stainless steel baluster railing adds to waterfront entertainment venue

Q-railing

Club Venu is a premier destination for dining, dancing, arts and culture. Set in a beautiful waterfront location, it’s undoubtedly one of the most stunning attractions in North Wales. The architectural plan included a roof terrace on the second floor, which incorporated a balustrade. In total, more than 40 metres of stainless steel Q-line balustrade with glass clamps, handrails and offset handrail brackets were mounted. Modern and minimal in appearance, this solution nevertheless offered considerable time and cost savings. The exterior balustrade delivered unbeatable safety without sacrificing transparency. The result is a stunning, uninterrupted view of the waterfront.
Amgen, Cambridge

Amgen, Cambridge

Rapid Ramp Limited

REQUIREMENT: The planned site improvements included relocating the loading bay and installing compliant access steps to the post room.ADDITIONAL INFORMATION: CAD and technical drawings were designed in-house and based on site measurements taken.END RESULT:We installed the modular access steps within a few hours. Once the installation was complete, the system was instantly usable. This allowed the post room to open within a quick turnaround time.The access steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Easy Glass Slim + Q-line: FIFA World Cup stadium Brazil

Easy Glass Slim + Q-line: FIFA World Cup stadium Brazil

Q-railing

Located in Manaus, the heart of the Brazilian rain forest, the Arena Amazônia stadium was a FIFA World Cup 2014 venue. It features Q-railing glass railings, posted balustrades and handrails. The handrails and railings run between stadium areas and are used in staircases and exits. Faced with stringent requirements, Q-railing’s record in other stadium projects spoke volumes. Nearly 8,000 metres of Q-railing products were installed, including Easy Glass Slim, Easy Glass 3kN glass balustrades and Q-line baluster railings. Q-railing products, with their clean, contemporary design, are a perfect match for its unique architecture.

Showing 1-36 of 103

Feedback