OVERVIEW
PROJECT BACKGROUND: A mobile trailer was adapted into a Covid PCR Testing Laboratory.
The staff test 6-7 thousand saliva pots every three weeks.
REQUIREMENT: Temporary modular steps to replace the existing ones to the trailer.
The current steps were too steep and narrow, with no handrails and platform.
END RESULT: We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.
We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team. Removal is a service included in our rental package.
The steps are fully compliant with documents M & K of the building regulations.
FEATURES INCLUDED:
Fully Compliant Step System
Modular Walkway Platform
Hathersage Road Car Park, Manchester Royal Infirmary
Carlisle Park Pavilion Cafe, Morpeth
Holy Cross Preparatory School, Kingston upon Thames
Euston Station, London
IFA2 Converter Station - GRP Products
Noss-on-Dart Marina, UK
Kings Cross Station, London
Offshore Technician Training Facility, Grimsby
Palmarsh Primary School, Hythe
Lincoln Cathedral, Lincoln