REQUIREMENT: Permanent wheelchair access from the new classroom entrance to the playground. The ramp required to comply with both part M and K of the building regulations.
END RESULT:
The Rapid Ramp included a 1:15 gradient and fully complies with documents M & K of the building regulations.
The installation was completed during the summer holidays, ready before the new school year. Plus, it only took a few hours to fit and could be used immediately after.
Unlike our steel Rapid Ramp System, a concrete ramp is time-consuming to install due to the drying time required and cannot be fitted in bad weather conditions, e.g. snow or rain,