OVERVIEW
Lionweld Kennedy supplied and installed both open mesh flooring and GRP light out removeable handrails to 4 twin level access gantries at the 'Doncaster Carr IEP Depot' for Hitachi Rail Group.
We supplied and fixed demarcation fencing with integral gates to form the stores area within the facility.
Also, we supplied and fixed internal depot protection to fork lift routes, including column protection, bollards and spring steel barrier systems.
Using both steel open mesh flooring and GRP handrails was a great cost solution for the client, as we were able to utalise our products to create a safe working environment which is fully compliant with British and European standards.
Safegrid Forge Welded Steel Grating - 20mm Ball Proof - Steel Grating and Open Mesh Flooring
Chirag Oil Field
GDF Suez Cygnus Bravo
Shah Deniz
Solan Topside
Stauning Whisky’s distillery - gratings
New Air BP Jet Fuel Station - plank gratings
HMS Victory - plank gratings
Platforms and stairs for grandstand systems - plank gratings