America's Test Cup Building

Portsmouth is home to the Land Rover Ben Ainslie Racing America’s Cup sailing team. TAC Projects were employed by the main contractor - Allied Developments - to provide the roofing and cladding works. TAC Projects have a long standing trading relationship with Fixfast, and looked to them to provide fastening systems which would satisfy all the needs and requirements for such a project. Fixfast provided all the fasteners needed for securing the external building envelope on this iconic and prestigious project.

Bermondsey Square Hotel

The area of Bermondsey Spa in South London was a vast development project in 2017 and 2018, the Bermondsey Square Hotel being a focal point of the area. As well as assisting with various applications for the projects, Fixfast helped with site visits and rainwater calculations to ascertain the needed level of roof drainage. Having swiftly answered these requirements, Fixfast then supplied many of the well proven FarBo roof outlets together with leaf guards to ensure the longevity of the roof areas.

Buckland Hospital

The Buckland Hospital, Dover is a community hospital that provides a range of local services. Main contractor Interserve PLC enlisted Industrial Construction (Sussex) Ltd to install the roofing and cladding package. Fixfast products were the first choice for ICS and the Facade Support range was an obvious need for this type of contract; coupled with the DrillFast® Stainless and Lacquered products, the external roofing and cladding is installed in the finest possible manner.

Building 270

Fixfast’s complete engineered rainscreen support system has been used to securely fix the decorative rainscreen façade for the new WorldPay offices.

Butlins Wave Hotel

Following the success of the Shoreline and Ocean hotels at Butlins’ Bognor Regis Resorts, the Butlins Wave Hotel is the newest addition, with the widest range of accommodation options. All three have been waterproofed by the Roofline Group. Cefil single-ply roofing membrane covers tapered insulation, with Fixfast tube washers and fasteners holding it all in place against the prevailing sea winds.

Colbourne Place

Fixfast tailored its complete engineered rainscreen support system for this prestigious apartment block in Woking. Supplying the bars and brackets for the facade substructure as well as the fasteners.

Curious Brewery

The overall aesthetics of this new brewery in Ashford were incredibly important to the overall design process with no detail left unchecked including the style of the fastener heads used to fix the impressive jet black cladding panels.

Exeter College Cohen Quad

The Rimex tiling in the checker-board pattern really highlights the stunning dormer windows and the beautiful curve of the tiles from the roof-line wrap around the roof and down the walls creating a seamless cloak around the building. 17,000 iridescent stainless steel shingles adorn this roof and the tiles are of a wonderful muted bronze and champagne colour with an unusual texture, catching, but not reflecting, the sunlight.

Fontwell Racecourse

This visually stunning building, constructed for Northern Racing Ltd, provides twelve corporate hospitality boxes, hospitality lounges and a glass-fronted restaurant which provides an exceptional view of the track. The DrillFast Lacquered fasteners fit perfectly into this luxury environment, being colour matched precisely to the scheme and with a neat low profile finish. The use of genuine A2 stainless steel also makes this construction a real investment for the future of the racecourse and facilities.

Friars Walk Shopping Centre

Specialist roofing and cladding contractor Metclad Ltd were employed by main contractor Bowmer & Kirkland to provide the roofing and cladding works. Fixfast helped to ensure the best fastener systems were used for the correct applications. For the flat roofing, efficient thermally broken systems were used in order to met all the regulatory standards. In terms of facade work, Fixfast supplied fastener systems designed to be aesthetically pleasing. Our DrillFast Lacquered range was used for all coloured facades where fasteners were visible. Where there was a need to invisibly fix panels, Fixfast supplied the specialist Sika Tack adhesive system.

Horton Halls

Originally specified as a rivet fixing, the decision was made to change this to a powder coated self-drilling fastener, as this would eliminate the inherent problem of damage often caused by riveters denting or scratching the panels. This was particularly important on this contract as the panels are all face fixed, and therefore on constant display. Fixfast were also able to match to the special NCS colour, adding this to the already vast array of colours available.

Leeds Arena

The striking new first direct arena boasts a unique 'honeycombed' external facade that has been based on a mathematical diagram to create a pattern of varying cellular shapes, which are further complemented by glazed panels and the use of coloured lights.

Minsthorpe Leisure Centre

Fixfast provided high corrosion resistant (HCR) fasteners to ensure the roofing and cladding around the swimming pool remained in place despite the high chlorine corrosion risk.

Morrisons - Sheppey

Fixfast supplied the fastening package - with the store’s close proximity to the sea, high quality stainless steel fasteners were supplied to ensure the building’s longevity.

Morrisons, Sittingbourne, Kent

The new store was built as a main contractor’s design and build shell construction, with a traditional Morrison fit out, and involved working with two design teams simultaneously. The store was one of the first new stores to incorporate Morrison’s new “hybrid heat reclaim system”, and also incorporated a series of photovoltaic panels and wind turbines on roof areas to contribute to the renewable energy targets required by the local Planning Authority for this new development.

Ocado Distribution Centre

The lowprofile fastener and super-?at washer combination allow one-step installation with no need to seal over each fixing to waterproof it, in this case saving onethird of the predicted project time.

Ocean Terminal

The Ocean Cruise terminal has been completed to marine standards, and helps to meet the need of Southampton’s cruise business which has seen unprecedented growth in recent years. The new terminal is capable of accommodating the largest cruise vessels afloat.

Olympic Handball Arena

Buckingham Group enlisted IRC Carocelle to carry out the roof works and IRC Carocelle turned to Fixfast to supply a complete fixing package for this - Fixfast’s tube washer and fastener combinations enabled the use of panels which achieved the specified insulation levels. Fixfast also had the solution for the external facade - thousands of ‘shingle cleats’ were used to hang the 3000 sq m of specially manufactured copper panels.

Pondwick's Close, St Albans

The Fixfast living roof retention system has been used as part of a stunning Sky Garden green roof installation in Hertfordshire, which recently featured on Grand Designs. 175m of 100mm EdgeGuard aluminium retention angles surround the perimeter of the living roof, preserving its unique appearance, and maintaining the integrity of the gravel fire breaks.

Queen Elizabeth Hospital

Specialist contractor Mid Kent Roofing were approached by Vinci Facilities to provide a walkway solution for the roof of the Queen Elizabeth Hospital in Woolwich, London. Fixfast worked closely with Mid Kent Roofing to provide the solution: Fixfast's easy-to-install DukMat system is second to none.

Riverside Resource Recovery Facility

The new Riverside Resource Recovery Facility is the largest project of its kind in the UK. The building’s design is a departure from the bleak industrial structures of the past towards buildings that complement the local environment. Fixfast helped with the creation of the distinctive “swoosh” by providing unique powder-coated rivets to fix the curved and coloured panels to the face of the composite skin.

Royal Garden Hotel

Fixfast supplied a complete package here, not on the drains and guards but all the fasteners required for fixing the roofing system. For this project, Fixfast also helped by providing the necessary rainwater calculations required to complete the project, ensuring the efficient and reliable drainage expected of the FarBo range once installed

Tate Britain

As part of the renovation of this famous old institution, the gutters needed protection from foot traffic. Fixfast’s DukMat was used to create a clean, neat and hardwearing solution fit for this grand landmark building.

The Flowerbowl

The Flower Bowl Entertainment Centre was recently awarded the New Tourism Business prize at the Lancashire Tourism Awards. This award recognises The Flower Bowl as a high performing new business with a great understanding of the marketplace and further opportunities for development. The unusual living rooftop feature has been part of The Flower Bowl plan at the outset, with the ultimate goal to enable sheep to graze there! The roof had been designed with the sheep in mind, however, the logistics of making a roof ‘sheep-safe’ are extremely complex.

The Lanesborough Hotel - London

All the rainwater outlets on the roof were in need of replacement, and Holborn Asphalt needed a simple, effective solution that would be compatible with the waterproofing membrane that they were installing.

The Shard

As Western Europe's tallest building, The Shard needs little introduction. Fixfast helped several contracts in this massive projects, for the heart of the structure to the aesthetic details.

Vestas Blades Research Facility

The DrillFast Stainless composite panel fasteners are the ultimate in reliability, even in the exceptional length required for this project. In this situation the contractor required matching reliability from the delivery schedule, and Fixfast stepped up to the mark, making sure the product was always there when needed.

Wembley London Designer Outlet

Fixfast provided all that was needed including stainless steel self drilling screws, lacquered stainless steel screws for the colourful facade areas together with the many different sealants and accessories needed for such a wide variety of roofing, cladding and facade applications.

Worthing Pools

The architects Wilkinson Eyre were appointed to design this stunning new swimming pool for the Worthing Borough Council following a RIBA competition. The Splashpoint Centre’s design incorporates flexible space for all types of leisure activity. Main contractor Morgan Sindall looked to Kingsley Specialist Roofing for all the exterior cladding and roofing - many thousands of fasteners from Fixfast were used to clad this stunning landmark building. Thanks to the excellence of the service from Fixfast, and the versatility and effectiveness of the fasteners provided, challenges were met and solved with ease and the project completed to full satisfaction of the client.