OVERVIEW
The new store was built as a main contractor’s design and build shell construction, with a traditional Morrison fit out, and involved working with two design teams simultaneously.
The store was one of the first new stores to incorporate Morrison’s new “hybrid heat reclaim system”, and also incorporated a series of photovoltaic panels and wind turbines on roof areas to contribute to the renewable energy targets required by the local Planning Authority for this new development.
DrillFast low profile A4/316 stainless steel fasteners were utilised as part of the design, with lacquered heads blending in with the panel for a barely noticeable finish.
"Thank you all at Fixfast - you make my job easier"
Paul Guyton - Senior Designer
Contact Fixfast Ltd by clicking the button below to find out which products were used in this case study.