NBS Source
I'm a manufacturer
Fixfast Ltd

Fixfast Ltd

Maximum Reliability, Minimum Fuss

+44 (0)1732 882387 Website

Sort by:

Showing 37-51 of 51

Sponsored
Royal Garden Hotel

Royal Garden Hotel

Fixfast Ltd

A complete package was supplied: not only the rainwater outlets and leafguards but all the fasteners required for fixing the roofing system too.For this project, Fixfast helped by providing the necessary rainwater calculations required for completion, ensuring the efficient and reliable drainage expected of the FarBo range once installed."Very friendly and helpful staff, good range of products and very good service overall"Stuart Marris - Contracts Manager at K&S Construction (Sussex) Ltd
Sponsored
Shepperton (Pinewood) Studios

Shepperton (Pinewood) Studios

Fixfast Ltd

Set to become the second biggest film studio in the world, the £121m expansion of the Pinewood Group's Shepperton Studios includes 31 purpose-built stages.With £500m of private investment into the former brownfield site, the development is expanding capacity and increasing space to keep Shepperton at the forefront of the British film & television industry.ChallengeAcoustics are paramount in creating an award-winning production. However, noises from outside the studio can creep unintentionally, leading to reverberation or interference from unwanted sounds, decreasing the film's overall quality. To control the sound within and without the studio, the Shepperton Studios have a unique 'building within a building' design: decreasing unwanted sounds to controllable levels for optimal recording purposes. SolutionFull envelope solution provider FK Group were awarded this project with a challenge to achieve the acoustic values required for prestigious project. Turning to Fixfast for a solution, the answer they provided was fast and simple to install, with maximum reliability on-site. The main composite panel was fixed back to the heavy gauge steel structure using our A4/316 grade stainless steel DF25-SSA4-HT-S19-6.3 x 225 fasteners. On top, a basic framing system was installed with IH-270 insulation hangers on top of the panel - holding a further 3 layers of insulation (approx. 200-250mm thick). Sandwiching this all together was a further 100mm thick composite panel on the outside wall.Acoustic values achieving, the new and expanded Shepperton Studios are set to stay at the top of the British film industry. "The focus for FK will always be to deliver buildings on time, on budget, of high quality, and to repeat this process. When required, Fixfast have always shown their expertise in the sector, and contributed significantly to FK's continued success."Alistair Bolton - Construction Procurement Director at FK Group
Sponsored
Sherborne Sports Centre, Sherborne School

Sherborne Sports Centre, Sherborne School

Fixfast Ltd

Sherborne School is an independent, HMC boarding and day school for young men aged 13-18. Steeped in history, the buildings date back to the 12th century, having educated many boys over the centuries. A £9m extension to the existing sports centre has doubled the size of the buildings, including new facilities such as:Squash courtsPerformance gym studiosFull length indoor cricket nets2nd large sports hallGolf simulator roomClimbing and bouldering wallsClassrooms and changing facilitiesThe state-of-the-art centre has transformed the sports training capabilities of the school and the students it develops, giving more opportunity for the boys to explore and train for different activities. ChallengeTAC Projects were appointed as the specialist cladding contractor for the exterior cladding on the new Sherborne School sports centre and Link Building - opting to use a timber cladding rainscreen system for a stunning natural wood effect. Composed of Siberian Larch Timber planks (sourced through Vincent Timber), and on top of a 120mm composite TATA Trisomet carrier panel; the timber is grade A and includes applied fire treatment to Euroclass B fire rating. Solution Fixing back the panel to the substructure was a job for Fixfast's MatchFast composite panel fixings - with moulded UV resistant colour heads, these fasteners are available for timber, light, or heavy steel - with washers for both roof and wall applications. Also used within the construction were Fixfast's DrillFast ultra heavy self-drillers for 25mm steel; DrillFast low profile fasteners lacquered to the specific colour required to blend in with the building, and accessories to suit - suit as silicone and strip sealants for sealing and weatherproofing joints. (image courtesy of TAC Projects)"TAC Projects pride themselves on being able to provide innovative solutions to almost any roofing and external façade project, and Sherborne School was no exception. Our client, Amiri Construction, were asked to endeavour to meet Sherborne School's budget constraints, which partly entailed a redesign of the external façade build-up, but still provide the original design intent. The complete façade construction was literally turned 90 degrees, so a completely new support and fixing system had to be designed. We were engaged early by Amiri to achieve this - which we succeeded in doing - but only with the help of our key supply chain, which included Fixfast. We have a fantastic working relationship with Fixfast going back a number of years, and they certainly didn't let us down on this occasion. They proved an integral part of the technical jigsaw that was required to reinvent the façade build-up from inner wall to outer timber rainscreen façade. Fixfast are always dependable, have a great range of products, and are always willing to come to the table to discuss and provide solutions where they are able. We would certainly recommend them to others."Paul Mann - Sales & Pre-Construction Manager at TAC Projects
Sponsored
Smyth Toys Dundalk

Smyth Toys Dundalk

Fixfast Ltd

One of the largest logistics units to have been built in Ireland within recent years, the Smyth Toys warehouse in Dundalk is a milestone in the company's story of growth and expansion. A family-run business started in County Mayo, Smyth Toys is a fast growing toy retailer with over 100 stores across the UK and Ireland.Situated within Dundalk Business Park, the site for the new warehouse was purchased for €8.9 million, and developed by TSL Projects, utilising multiple local contractors for the entire construction process.ChallengeWith 38,000m2 of roofing to clad, and 16,000m2 of cladding to install, Ireland's go-to roofing and cladding specialists Select Roofing were contracted to construct the building envelope on the mammoth warehouse.SolutionOpting to use Kingspan's KS1000RW composite panels for the roof, KS AWP panels for the walls, and DLTR rooflights; Select Roofing turned to Fixfast to use their MatchFast stainless steel A2/304 grade fasteners, moulded to the colours required to blend the fastener heads into the building, including fasteners for both light and heavy steel - where required across the various applications.Roofing and cladding completed within a speedy 11 week programme, Select Roofing achieved zero lost hours on-site, demonstrating their commitment to safety within the working environment.
Sponsored
SOYO Blocks B + C

SOYO Blocks B + C

Fixfast Ltd

At the heart of Leeds' cultural district lies the new SOYO development - a mixed-use area bringing social and modern living to the city. Alongside the city's creative quarter of the Leeds Playhouse, as well as the BBC Studios and the College of Music, the SOYO development has promised to 'establish one of the very best places to live, work, and visit in Leeds'.The blocks B + C development consists of 331 apartments, as part of a PRS (Private Rented Sector) scheme - including a variety of different apartments with options up to 3 bedrooms in size. Adjacent to the residential accommodation lies workspace for entrepreneurs and agile working - as well as facilities such as a gym, a bike store, and a basement car park for convenience.ChallengeSpecialist roofing and cladding sub-contractor Axis Envelope Solutions provided the external solution for the exterior cladding of the building. With the construction spanning across two buildings at 8 and 14 storeys high, fasteners were required to securely fix back Kingspan composite panels to a lightweight SFS (Steel Framing System), with an aluminium rainscreen exterior fixed directly back to the panel. SolutionFixfast supplied Axis with TIDR A4/316 stainless steel insulation anchors, as well as A4 grade stainless steel pop rivets, and Fixfast's DrillFast A4 stainless low profile fasteners with lacquered heads to blend in and match the specific panel colour on the building. DF25-SSA4 fasteners were utilised within the construction - self-drilling up to 25mm thick steel with ease, and saving time in pre-drilling for easier installation. (image courtesy of Axis Group)"Working with Fixfast has been nothing short of a breeze, they appear to have a fixing for every application, and technical backup to match. We will certainly be using Fixfast again in the future."Jamie Hartley - Senior Design Manager at Axis Envelope Solutions
Sponsored
St Luke's Cancer Care

St Luke's Cancer Care

Fixfast Ltd

St Luke's Cancer Centre is a clinic that sits as part of the Royal Surrey County Hospital in Guildford. Providing care for cancer patients across the county, this clinic has undergone work to extend and refurbish the space within the clinic: including the creation of nearly double the amount of existing clinical space, spacious entrances, and a whole range of additional clinical facilities. ChallengeSpecialist roofing company Salnor Roofing Services Ltd were contracted to secure the roof of the clinic, a flat roof with varying levels of tapered insulation - meaning added complexity to the project. SolutionSalnor Roofing turned to Fixfast to carry out both a windload calculation and tube/fastener selection for the tapered insulation scheme, which gave them a detailed breakdown of the fasteners and tube washers required to securely fix the roof. Fixfast supplied SF-T tube washers combined with SF-RS-5.8 fasteners, in different lengths to match the levels of insulation on the roof - for both the insulation and membrane fix. Fixfast SureFast fasteners and tube washers are suitable for a range of substrates including metal, timber, and concrete decks - they've been specifically designed to overcome the cold-bridging effect of mechanical fasteners. (image courtesy of Salnor Roofing Services Ltd)"Always a pleasure working with Fixfast. Prompt delivery from place of order and great communication."Steve Batten - Salnor Roofing Services Ltd
Sponsored
Tate Britain

Tate Britain

Fixfast Ltd

As part of the renovation of this famous old institution, the gutters needed protection from foot traffic. The old system was unsightly and had left rust stains throughout the extensive network of guttering.DukMat could be rolled into place and easily cut to fit the varying width and protrusions, saving time and minimising joins. The result is a clean, neat and hardwearing solution fit for this grand landmark building."It's a good product, easy to install...takes the incongruities out of the gutter"Heine Vasson - Project Manager at Richardson Roofing
Sponsored
The Flowerbowl

The Flowerbowl

Fixfast Ltd

The Flower Bowl Entertainment Centre was awarded the New Tourism Business prize at the Lancashire Tourism Awards - an award recognises The Flower Bowl as a high performing new business with a great understanding of the marketplace and further opportunities for development. The unusual living rooftop feature has been part of The Flower Bowl plan at the outset, with the ultimate goal to enable sheep to graze there. The roof had been designed with the sheep in mind, however, the logistics of making a roof ‘sheep-safe’ are extremely complex. The 4,200m2 specialist roof is one of a kind and was created with 700 tonnes of topsoil and grass, with all the perimeters all held back with the EdgeGuard living roof retaining system.
Sponsored
The Lanesborough Hotel - London

The Lanesborough Hotel - London

Fixfast Ltd

The Lanesborough 5-star hotel on Hyde Park Corner, Knightsbridge in central London; is operated by the Oetker Collection, and is reputedly the most expensive hotel in the city.All the rainwater outlets on the roof were in need of replacement, and Holborn Asphalt needed a simple, effective solution that would be compatible with the waterproofing membrane that they were installing.An extensive number of our FarBo rainwater outlets were selected for this project - these outlets are perfect for this type of work as they fit neatly into any existing drains and downpipes.
Sponsored
The Shard

The Shard

Fixfast Ltd

As Western Europe's tallest building, The Shard needs little introduction. Its silhouette and design make it immediately recognisable and a transformer of the London skyline. A vertical city is contained within its 310m height, including offices, world-renowned restaurants, high-class residential apartments, a 5-star hotel, and all-around views from London's highest viewing gallery.Fixfast fasteners were included in several contracts in this massive project, from the heart of the structure to the aesthetic details."Always friendly, helpful, and delivery is fast!" Kevin Harnett - Project Manager at Structural Metal Decks
Sponsored
Vestas Blades Research Facility

Vestas Blades Research Facility

Fixfast Ltd

DrillFast stainless composite panel fasteners are the ultimate in reliability, even in the exceptional length required for this project. Drilling heavy steel without fuss, supporting the outer skin impeccably, with the proven longevity of A2/304 stainless steel.The Fixfast maximum reliability, minimum fuss promise extended to more than just the project - the contractor on this project had the certainty that deliveries would be on-site when needed - every time."I always ask the buyers for your fixings - you just don't get any problems with them"Barry Coldren - Project Manager at Prater Ltd
Sponsored
Water Treatment Plant

Water Treatment Plant

Fixfast Ltd

This wastewater treatment plant is part of a large and vital infrastructure project across Ireland to stop the flow of raw sewage into the Irish sea.As well as the construction of the treatment plant on the coast of the Irish sea, the project includes two interceptor sewer pipelines and a marine sea outfall to safely discharge the treated water once processed at the plant.One of the biggest projects so far in the development, the €139m state-of-the-art project will provide wastewater treatment infrastructure for up to 36,000 people once complete.ChallengeLocated in a coastal setting, the fasteners and components used had to withstand the harsh and highly corrosive environment. Leading roofing, cladding & façade contractor Crown Roofing & Cladding were contracted to fasten the striking angled façade of the wastewater plant - turning to Fixfast to use their stainless steel façade support system and fasteners to securely fix the façade.The complexity of the façade meant that 4 different sizes of façade bracket were utilised within the construction - however, the Fixfast façade support system is versatile enough to be used in multiple configurations, with a range of different sizes of brackets.SolutionA4/316 stainless steel A4/316 SPIDI Max brackets were used in conjunction with MatchFast moulded head bi-hex fasteners, and DrillFast stainless steel low profile lacquered fasteners to match the colour of the façade.Using A4/316 stainless steel throughout the construction ensured that the fasteners and components would hold for the lifetime of the building - after all, fasteners aren't maintainable so must be suited for longevity and security.(image courtesy of Crown Roofing & Irish Water)"Fixfast is an invaluable supply chain partner to Crown Roofing & Cladding. Their collaborative approach enabled Fixfast to expand their product offering from supplying the fixings for the roof, to use working together to design and engineer the brackets and rails for the corners of the elevations. Their technical support was crucial in getting the necessary submittals approved. By consolidating our supply chain on the project, we've been able to minimise deliveries and keep costs to a minimum. We are now looking forward to implementing a similar bracket and rail solution for an upcoming project in Germany." Crown Roofing & Cladding
Sponsored
Wembley London Designer Outlet

Wembley London Designer Outlet

Fixfast Ltd

Main contractor John Sisk & Son Ltd looked to specialist roofing and cladding contractor Richardson Roofing Ltd to provide solutions for the various roofs, cladding and façades that make up the exterior of this visually stunning complex.Fixfast provided all the necessary components: including stainless self-drilling screws, lacquered stainless steel screws for the colourful façade areas. together with the many different sealants and accessories needed for such a wide variety of applications. "Gone are the days of waiting weeks for colour matched fixings to complement powder coated flashings and fascias. Fixfast are able to turn around lacquered fasteners within a week thanks to their in-house spraying production line"Andy Inman - Director at Richardson Roofing Ltd
Sponsored
Will Wyatt Court

Will Wyatt Court

Fixfast Ltd

Situated in the middle of the London Borough of Hackney, Will Wyatt Court is a 511-room residential building providing student accommodation.ChallengeRoofing & façade contractor Russell Roofing Ltd were contracted to carry out refurbishment works externally on the Will Wyatt Court building - recladding and subsequently transforming the building with BTS Façades and Fabrications' Vantage® IP Interlocking Plank rainscreen system in alternating metallic colours.SolutionThe rainscreen panel used has a secret fix fastening system, which means that the majority of the fasteners are hidden - but the remaining exposed fasteners have to colour match exactly the panel in order to blend in with the building.Using Fixfast DrillFast low profile lacquered fasteners, Fixfast were able to colour match the fastener heads so Russell Roofing could install the fasteners knowing they'd match perfectly with the external panels.Fast forward to 2023 and Russell Roofing were awarded 'best refurbishment project' in the 2023 UK Façade Awards for the Will Wyatt Court refurbishment and re-cladding of the building. "Working with Fixfast at Will Wyatt Court was a great experience all round. Their unwavering commitment to providing technical support, cost-effective solutions, and exceptional customer service has not only streamlined our processes but elevated the overall success of the project."Frazer Simpson - Director at Russell Roofing Ltd
Sponsored
Worthing Pools

Worthing Pools

Fixfast Ltd

The architects WilkinsonEyre were appointed to design this stunning swimming pool for the Worthing Borough Council following a RIBA competitor.Located adjacent to the existing Aquarena on the Worthing seafront, the Splashpoint Centre's design incorporates flexible space for all types of leisure activity.Main contractor Morgan Sindall looked to Kingsley Specialist Roofing for all the exterior cladding and roofing - with our versatile DuraMet hard metal system being used to clad this stunning landmark building. Challenges were met and solved with ease and the project completed to the full satisfaction of the client."We couldn't have been more pleased - all the deliveries were on time and the fasteners were great, excellent service!"Daniel Madell - Procurement Manager at Kingsley Specialist Roofing Ltd

Showing 37-51 of 51