OVERVIEW
Bradfield College, located in the heart of Berkshire, is a school for 13-18 year olds, providing an 'education for life'.
Set up in 1892, the school has its own church as part of the grounds, which has remained closed for a number of years.
However, work has been completed recently to connect the church to the school, and convert it into a learning hub for academic purposes - providing students with the space to work individually or collectively to further their learning, preparing them for life in the 21st century.
Challenge
Nationwide metal & single ply roofing contractors Salmon Solutions provided the solution when it came to the cladding - using elZinc® standing seam cladding in Rainbow Gold to elevate the cladding, giving a sophisticated modern feel to the metal and glass exterior.
Solution
To get a secure fix, Salmon Solutions turned to use Fixfast SPIDI® Max brackets and rails as part of the vertical cladding solution. SPIDI Max brackets are versatile to be used in a wide range of applications, as well as being suitable for horizontal or vertical applications - one bracket for both fixed and sliding points, and available in 3 material grades: aluminium, A2/304 stainless steel, or A4/316 stainless steel.
"We have a great working relationship with Fixfast and use their products on the majority of our projects. Fixfast - as always - were reliable and efficient with both service and the technical info, which allowed us to incorporate not just their fixings but the SPIDI helping hand system into this project."
Charlie Whitman - Salmon Solutions Ltd
Stainless Steel Facade Rainscreen Insulation Anchors
Spidi Max rainscreen cladding subframe system - Facade support helping hand brackets
Ocado Distribution Centre
Morrisons - Sheppey
Exeter College Cohen Quad
Curious Brewery
Mock Veterinary Practice, University of Nottingham
Holland Park, Glasgow
Halcyon Way School, Oldham
Water Treatment Plant
SOYO Blocks B + C