OVERVIEW
Portsmouth is home to the Land Rover Ben Ainslie Racing America’s Cup sailing team. TAC Projects were employed by the main contractor - Allied Developments - to provide the roofing and cladding works.
TAC Projects have a long-standing trading relationship with Fixfast, and looked to them to provide fastening systems which would satisfy all the needs and requirements for such a project.
Fixfast provided all the fasteners needed for securing the external building envelope on this iconic and prestigious project - including Fixfast's DrillFast A4 stainless steel fastener range was the solution to fixing in a challenging environment - securing the external building envelope on this iconic and prestigious project.
"TAC required a reliable supplier of high-quality stainless steel fasteners for this fast track project and chose Fixfast for their comprehensive range, good quality and technical backup"
Tom Colbourne - Managing Director at T A Colbourne Projects Ltd
DrillFast® Stainless A4 DF12-SSA4-HT Composite Panel Fasteners
DrillFast® Stainless Steel DF12-SSA4-P(L)-HT Composite Panel Fasteners
DrillFast® Stainless Steel DF12-SSA4 Drilling Fasteners
DrillFast® A4/316 Stainless Steel DF3-SSA4 Drilling Fasteners
DrillFast® A4/316 DF2-SSA4-LS Stitching Fasteners
DrillFast® Stainless Steel DF3-SSA4-P(L)-HT Low Profile Composite Panel Fasteners
Ocado Distribution Centre
Morrisons - Sheppey
Exeter College Cohen Quad
Curious Brewery
Ocado Distribution Centre
Morrisons - Sheppey
Curious Brewery
Wembley London Designer Outlet