You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
Overview
At Cleppa Park in Newport, Welsh Water undertook a 2,500m² roof refurbishment to address severe deterioration of the existing composite roof. Water ingress, coating delamination, and ageing rooflights posed ongoing risks to performance and durability. With live site operations to consider, Welsh Water needed a robust solution that could be delivered with minimal disruption.
The Challenge
The project demanded complex coordination, including safe removal and reinstatement of PV panels, redesign of rooflight structures, and phased works to keep the site operational. Delivering enhanced thermal efficiency and long-term weatherproofing under such constraints required a system proven for speed and resilience.
The Solution
Welsh Water selected Gemello® Revive, SIG Building Solutions’ prefabricated roof and wall over-clad system. Gemello® Revive’s over-clad design enabled a fast and reliable refurbishment with minimal interference on site. Panels were efficiently installed to provide a secure, thermally efficient envelope backed by a 25-year warranty, ensuring Welsh Water could continue operations with confidence.
Key Benefits
Results
The refurbishment has futureproofed the Welsh Water facility, delivering a durable, efficient, and modernised building envelope. With Gemello® Revive, the project was completed safely and effectively in a live environment, providing lasting value and operational continuity.
Gemello Revive R1-C - Over-Clad Roof System
Gemello Revive R3-F - Over-Clad Roof System
Gemello Revive R2-S - Over-Clad Roof System
Gemello Revive R6-C - Over-Clad Roof System
Gemello Revive R5-F - Over-Clad Roof System
Gemello Revive W2-T - Over-Clad Wall System
Gemello Revive R7-C - Over-Clad Roof System
Gemello Revive W7-T - Over-Clad Wall System
Transforming a Historic Hertfordshire Site with Gemello® Revive
How Kingsbarns Turned to Gemello® for a Fast, Durable Solution
St Nicholas Leisure Centre, Warwick – Gemello® Revive & Integrated Solar Installation
How Castle Stuart Golf Links Chose Gemello® for a Robust, Cost-Effective Building Envelope
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - BMW Swindon Press Shop
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow
APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant
APL Case Study - StrongBak™ - Derry Sports Complex
APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre
APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical