How Castle Stuart Golf Links Chose Gemello® for a Robust, Cost-Effective Building Envelope

How Castle Stuart Golf Links Chose Gemello® for a Robust, Cost-Effective Building Envelope

SIG Building Solutions

Overview:As part of the development supporting the new 18-hole course at Castle Stuart Golf Links, just east of Inverness, three new buildings were constructed to support the expanded facilities. One of the key structures was designed to provide storage for golf caddies and maintenance equipment, alongside office accommodation and staff welfare facilities.Given the exposed location and demanding performance requirements, the building envelope needed to deliver excellent thermal performance, durability and long-term reliability.The Challenge:The original design specification required a building envelope capable of meeting strict U-value and fire performance requirements, while remaining commercially viable and straightforward to install on site.In addition to performance, the project team needed confidence in lead times, system compatibility and installation efficiency, ensuring the programme could be maintained without unnecessary risk or delay.The Solution:After discussions with Steadmans and SIG Building Solutions, a Gemello® warrantied twin skin system was proposed as a fully compliant alternative specification.Gemello® met all required thermal and fire performance criteria, while also offering a more economical solution and the reassurance of a well-supported, proven system. The specification provided confidence in delivery times and allowed the contractor to work with a system they had previous experience installing.The solution was quickly agreed by the client, enabling orders to be placed and works to commence without delay.The Result:Thanks to the short lead time and familiarity with the Gemello® warrantied system, works progressed efficiently. A total of 1,900m² of roof liner skin was completed just in time for Christmas, allowing the main contractor to use the building for much-needed storage during the winter period.The remainder of the project followed a similarly smooth trajectory and was completed well within programme. Despite the challenging flatland location-where buildings are exposed to high winds and heavy rainfall-the completed envelope has performed exceptionally well.The project was delivered with no snagging issues, highlighting the robustness and reliability of the Gemello® warrantied system in demanding conditions.Conclusion:The Gemello® warrantied twin skin system provided a robust, efficient and cost-effective building envelope, fully aligned with the performance and programme requirements of the Castle Stuart Golf Links development.Its proven durability, ease of installation and dependable performance make Gemello® a highly recommended solution for projects requiring a reliable and complete building envelope.
Sponsored
How Kingsbarns Turned to Gemello® for a Fast, Durable Solution

How Kingsbarns Turned to Gemello® for a Fast, Durable Solution

SIG Building Solutions

Overview:Nestled just a few miles from the historic town of St Andrews, Kingsbarns Golf Links stands as a crown jewel of Scottish golf. Renowned worldwide for its stunning sea views and championship layout, Kingsbarns attracts golf enthusiasts from every corner of the globe. Behind the scenes, the team faced a pressing challenge: delivering a reliable, weather-tight storage facility for their groundskeeping equipment and fast.The Challenge:With the new season’s opening date rapidly approaching, time was tight. Kingsbarns needed a dedicated building to protect vital machinery and tools from the harsh coastal elements. The project demanded speed, durability, and minimal on-site disruption to avoid interfering with ongoing estate operations. Traditional building methods risked delays and complications.The Solution:Kingsbarns chose Gemello®, SIG Building Solutions’ innovative roof and wall panel system, for its fast installation and long-lasting reliability. The panelised design allowed for a swift build, with fewer trades required and simpler site coordination. Panels were quickly fixed in place, creating a secure, weather-tight environment in just weeks, well ahead of the season start.Benefits:Rapid Installation: The straightforward system minimized on-site work and disruption, crucial for a live golf estate.Durability: A 25-year warranty on the coating and full system assured resilience against the coastal climate’s wear and tear.Thermal Efficiency: Strong insulation kept the storage space stable year-round, protecting expensive equipment from moisture and temperature swings.Operational Efficiency: The finished facility enabled Kingsbarns to smoothly store and maintain their machinery, ensuring seamless groundskeeping throughout the season.Results:The Kingsbarns team successfully delivered a modern, efficient storage solution that matched the high standards of their world-class golf course. Gemello®’s combination of speed, strength, and thermal performance provided ongoing value, safeguarding vital equipment and supporting the estate’s operations without compromise.About Gemello®:Gemello® is a prefabricated roofing and wall panel system engineered by SIG Building Solutions for speed, simplicity, and durability. With a 25-year warranty and excellent thermal performance, it is trusted across industrial, agricultural, and leisure sectors for projects demanding minimal disruption and long-term peace of mind.
Sponsored
Roof Refurbishment for Welsh Water, Cleppa Park Delivered with Gemello® Revive

Roof Refurbishment for Welsh Water, Cleppa Park Delivered with Gemello® Revive

SIG Building Solutions

OverviewAt Cleppa Park in Newport, Welsh Water undertook a 2,500m² roof refurbishment to address severe deterioration of the existing composite roof. Water ingress, coating delamination, and ageing rooflights posed ongoing risks to performance and durability. With live site operations to consider, Welsh Water needed a robust solution that could be delivered with minimal disruption.The ChallengeThe project demanded complex coordination, including safe removal and reinstatement of PV panels, redesign of rooflight structures, and phased works to keep the site operational. Delivering enhanced thermal efficiency and long-term weatherproofing under such constraints required a system proven for speed and resilience.The SolutionWelsh Water selected Gemello® Revive, SIG Building Solutions’ prefabricated roof and wall over-clad system. Gemello® Revive’s over-clad design enabled a fast and reliable refurbishment with minimal interference on site. Panels were efficiently installed to provide a secure, thermally efficient envelope backed by a 25-year warranty, ensuring Welsh Water could continue operations with confidence.Key BenefitsRapid Installation: The prefabricated system reduced on-site time and simplified coordination.Weatherproofing: Gemello® delivered a watertight solution capable of withstanding challenging conditions.Thermal Efficiency: Improved insulation stabilised internal conditions and cut energy losses.Peace of Mind: The 25-year warranty assures long-term performance and resilience.ResultsThe refurbishment has futureproofed the Welsh Water facility, delivering a durable, efficient, and modernised building envelope. With Gemello® Revive, the project was completed safely and effectively in a live environment, providing lasting value and operational continuity.
Sponsored
St Nicholas Leisure Centre, Warwick – Gemello® Revive & Integrated Solar Installation

St Nicholas Leisure Centre, Warwick – Gemello® Revive & Integrated Solar Installation

SIG Building Solutions

OverviewClient: Stepnell Ltd & Warwick District CouncilInstaller: Stace Roofing LtdSystem: SIG Gemello Revive Roof with Solfit Integrated PVCompletion: September 2025At St Nicholas Leisure Centre in Warwick, Stepnell and Warwick District Council required a fast-track roofing and solar refurbishment to meet strict grant funding deadlines. With only two weeks to complete the installation and energise the system, this project demanded seamless coordination and proven technical solutions.Working in partnership with Stepnell, Solfit, and Stace Roofing, SIG Building Solutions designed and supplied the Gemello Revive Overclad System, providing technical expertise and product support to ensure a watertight, energy-efficient, and fully compliant outcome, completed ahead of schedule.The result: a high-performance roof integrating 252 × 425W Solfit PV panels, delivering renewable energy and enhanced building performance well before the grant deadline.The ChallengeThe team faced multiple pressures:A strict two-week delivery window tied to grant fundingIntegration of solar technology within a new overclad roof systemCompliance with structural, safety, and DNO requirementsSeamless coordination across multiple specialist partnersThe SolutionSIG Building Solutions designed and supplied the Gemello Revive Overclad System, a proven refurbishment solution that enhances the thermal, structural, and weathering performance of existing roofs while offering fast installation and minimal disruption to operations.The Gemello Revive system provides a complete, fully tested build-up including a Vapour Control Layer (VCL), bar and bracket system, upgraded insulation layer, and profiled metal trapezoidal overlay. This creates a robust, watertight envelope with outstanding thermal efficiency and long-term durability.Crucially, Gemello Revive comes with a 25-year system warranty, giving clients peace of mind in the performance and longevity of their investment. The system also offers compatibility with integrated solar technology, such as the Solfit PV panels used on this project, making it an ideal choice for sustainable refurbishment and renewable energy integration.This specification provided the ideal foundation for the Solfit integrated PV system, creating a fully weatherproof, energy-generating roof that meets modern performance standards.Delivery and PerformanceStart on Site: 15 SeptemberSystem Live: 22 September (one week early)Solar Panels Installed: 252 × 425W Solfit Integrated PVPerformance: Zero accidents, zero variationsDespite the tight timeframe and funding constraints, the installation was completed safely, on budget, and ahead of schedule. Stace Roofing overclad the two main roof slopes with the Gemello Revive system, achieving all performance and aesthetic goals while maintaining operational safety throughout.ResultsThis project demonstrates how collaboration and technical expertise can deliver exceptional results under pressure.Proven Gemello Revive performance for durability, energy efficiency, and ease of installation using a Trimform profile.Completed safely, on budget, and ahead of scheduleFully compliant with grant and DNO requirementsSeamless partnership between Stepnell, Solfit, Stace Roofing, and SIG Building Solutions25-year system warranty providing long-term reassuranceAbout SIG Building SolutionsSIG Building Solutions are specialists in the design and supply of high-performance roofing and cladding systems for industrial, commercial, and public sector projects. The Gemello Revive Overclad System combines long-term durability, improved thermal performance, and compatibility with integrated solar technology, helping clients meet sustainability and efficiency goals with confidence.
Sponsored
Transforming a Historic Hertfordshire Site with Gemello® Revive

Transforming a Historic Hertfordshire Site with Gemello® Revive

SIG Building Solutions

OverviewA former Fluorocarbon site in Caxton Hill, Hertfordshire, has undergone a striking transformation. What once stood as an aging industrial structure is now a revitalised, energy-efficient space comprising modern offices and a warehouse, thanks to the innovative Gemello® Revive over-cladding system from SIG Building Solutions.Installed by Roof-Link Industrial and Commercial and managed by Vista Contracts South East Ltd, this project showcases the power of sustainable refurbishment, strategic collaboration, and high-performance British-made building products.The ChallengeThe project team was tasked with modernising the former Fluorocarbon site without demolishing the existing structure, a move aimed at reducing environmental impact, preserving architectural heritage, and controlling project costs.The Solution: The Gemello® Revive Over-Clad SystemTo meet these objectives, the team specified the Gemello® Revive system, a warrantied over-cladding solution that dramatically improves thermal performance and visual appeal without the need for demolition.“Gemello® Revive’s competitive pricing and immediate availability were key factors in our selection, it allowed us to keep the project on schedule and within budget.” – Martin Lloyd, Director at Roof-Link Industrial and Commercial.Key Benefits of Gemello® ReviveComprehensive Warranties for long-term peace of mindEnhanced thermal efficiency with U-values as low as 0.14W/m²KDesign flexibility with multiple external profiles and finishesNon-fragility (Class B) with a projected 25-year lifespanSuitable for multiple sectors: industrial, retail, office, education, health, and leisureProject Highlights100 linear meters of Filon GRP rooflights supplied by Filon Products, matched to the new over-roof profile.Insulation by Superglass®, improving thermal performance using non-combustible glass fibre in a bespoke cavity system.Engineered bar and bracket spacer system, designed for structural integrity and energy efficiency.Collaboration & Local SourcingThis project exemplifies the power of partnership. SIG Building Solutions, along with supply partners Filon Products and Superglass®, ensured technical support, product quality, and reliable phased deliveries, all manufactured in the UK.“Design collaboration is key to meeting project goals, our UK manufacturing ensures consistent delivery and product support throughout.” – Phil Tye, National Sales Manager for Gemello®.ResultsRefurbished look with a clean, modern façadeSignificant energy savings through thermal upgradesReduced embodied carbon, avoiding demolition wasteEfficient installation process, praised by on-site teams“The site now has a fresh look and far better thermal performance, installation was smooth, and the results are outstanding.” – Martin Lloyd.ConclusionThe transformation of the Caxton Hill site is a benchmark for sustainable refurbishment. By using Gemello® Revive, the project preserved historical value, improved energy efficiency, and delivered a striking new exterior, all while supporting British manufacturing.As the construction industry continues to prioritise sustainability, projects like this illustrate how existing buildings can be reinvented through innovation, collaboration, and smart material choices.