You are viewing content for United Kingdom.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

St Nicholas Leisure Centre, Warwick – Gemello® Revive & Integrated Solar Installation

OVERVIEW

Overview

Client: Stepnell Ltd & Warwick District Council

Installer: Stace Roofing Ltd

System: SIG Gemello Revive Roof with Solfit Integrated PV

Completion: September 2025

At St Nicholas Leisure Centre in Warwick, Stepnell and Warwick District Council required a fast-track roofing and solar refurbishment to meet strict grant funding deadlines. With only two weeks to complete the installation and energise the system, this project demanded seamless coordination and proven technical solutions.

Working in partnership with Stepnell, Solfit, and Stace Roofing, SIG Building Solutions designed and supplied the Gemello Revive Overclad System, providing technical expertise and product support to ensure a watertight, energy-efficient, and fully compliant outcome, completed ahead of schedule.

The result: a high-performance roof integrating 252 × 425W Solfit PV panels, delivering renewable energy and enhanced building performance well before the grant deadline.

The Challenge

The team faced multiple pressures:

  • A strict two-week delivery window tied to grant funding
  • Integration of solar technology within a new overclad roof system
  • Compliance with structural, safety, and DNO requirements
  • Seamless coordination across multiple specialist partners

The Solution

SIG Building Solutions designed and supplied the Gemello Revive Overclad System, a proven refurbishment solution that enhances the thermal, structural, and weathering performance of existing roofs while offering fast installation and minimal disruption to operations.

The Gemello Revive system provides a complete, fully tested build-up including a Vapour Control Layer (VCL), bar and bracket system, upgraded insulation layer, and profiled metal trapezoidal overlay. This creates a robust, watertight envelope with outstanding thermal efficiency and long-term durability.

Crucially, Gemello Revive comes with a 25-year system warranty, giving clients peace of mind in the performance and longevity of their investment. The system also offers compatibility with integrated solar technology, such as the

Solfit PV panels used on this project, making it an ideal choice for sustainable refurbishment and renewable energy integration.

This specification provided the ideal foundation for the Solfit integrated PV system, creating a fully weatherproof, energy-generating roof that meets modern performance standards.

Delivery and Performance

Start on Site: 15 September

System Live: 22 September (one week early)

Solar Panels Installed: 252 × 425W Solfit Integrated PV

Performance: Zero accidents, zero variations

Despite the tight timeframe and funding constraints, the installation was completed safely, on budget, and ahead of schedule. Stace Roofing overclad the two main roof slopes with the Gemello Revive system, achieving all performance and aesthetic goals while maintaining operational safety throughout.

Results

This project demonstrates how collaboration and technical expertise can deliver exceptional results under pressure.

  • Proven Gemello Revive performance for durability, energy efficiency, and ease of installation using a Trimform profile.
  • Completed safely, on budget, and ahead of schedule
  • Fully compliant with grant and DNO requirements
  • Seamless partnership between Stepnell, Solfit, Stace Roofing, and SIG Building Solutions
  • 25-year system warranty providing long-term reassurance

About SIG Building Solutions

SIG Building Solutions are specialists in the design and supply of high-performance roofing and cladding systems for industrial, commercial, and public sector projects. The Gemello Revive Overclad System combines long-term durability, improved thermal performance, and compatibility with integrated solar technology, helping clients meet sustainability and efficiency goals with confidence.

Products featured in this case study

View all products (67)
Gemello Revive R1-C   - Over-Clad Roof System

Gemello Revive R1-C - Over-Clad Roof System

Gemello Revive R3-F  - Over-Clad Roof System

Gemello Revive R3-F - Over-Clad Roof System

Gemello Revive R2-S   - Over-Clad Roof System

Gemello Revive R2-S - Over-Clad Roof System

Gemello Revive R6-C   - Over-Clad Roof System

Gemello Revive R6-C - Over-Clad Roof System

Gemello Revive R5-F    - Over-Clad Roof System

Gemello Revive R5-F - Over-Clad Roof System

Gemello Revive W2-T    - Over-Clad Wall System

Gemello Revive W2-T - Over-Clad Wall System

Gemello Revive R7-C    - Over-Clad Roof System

Gemello Revive R7-C - Over-Clad Roof System

Gemello Revive W7-T  - Over-Clad Wall System

Gemello Revive W7-T - Over-Clad Wall System

More inspiration from SIG Building Solutions

View inspiration
Transforming a Historic Hertfordshire Site with Gemello® Revive

Transforming a Historic Hertfordshire Site with Gemello® Revive

How Kingsbarns Turned to Gemello® for a Fast, Durable Solution

How Kingsbarns Turned to Gemello® for a Fast, Durable Solution

How Castle Stuart Golf Links Chose Gemello® for a Robust, Cost-Effective Building Envelope

How Castle Stuart Golf Links Chose Gemello® for a Robust, Cost-Effective Building Envelope

Roof Refurbishment for Welsh Water, Cleppa Park Delivered with Gemello® Revive

Roof Refurbishment for Welsh Water, Cleppa Park Delivered with Gemello® Revive

More inspiration from Metal profiled sheet self-supporting cladding systems

View inspiration
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study -  StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

APL Case Study - AP50HR Half-Round Cladding - Bidfoods, Glasgow

More inspiration from Metal profiled sheet self-supporting roof covering systems

View inspiration
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - StrongBak™ - Derry Sports Complex

APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre

APL Case Study - Aluminium Sinusoidal Roofing & Perforated Cladding - Birmingham Energy Innovation Centre

APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical

APL Case Study - AP65ZS Zipseam™ Roofing & Sinusoidal, Slimwall™ & Louvre Cladding - CMR Medical