NBS Source
I'm a manufacturer

"tanking guniting grouts"

1,201 results found

Sort by:

Showing 1-36 of 95

Sponsored
Hempel makes the grade with refinery crude storage tank lining

Hempel makes the grade with refinery crude storage tank lining

Hempel A/S

A major United States oil refinery has chosen Hempel’s Hempaline solvent free epoxy lining as an interior tank lining for a 200 foot / 61 metre tank diameter sour cured oil storage tank.Hempaline epoxies are 100% solid materials that can often be applied in a single coat and have rapid curing properties. This saves our customers time and money in application costs and completion times. Faster project completion allows them to return a unit to service quickly producing revenue.Hempaline epoxy was chosen for this application because of its ability to resist acid conditions of the tank’s cargo, high sulphur crude oil. Hempaline will provide long lasting protection to the tank, minimising future maintenance and repainting costs.Our Hempaline Defend 630 is a fast cure, highly chemical-resistant internal coating designed specifically for severe service environments, such as those found in the oil and gas industry.
Sponsored
College Avenue Contact Tank - South East Water

College Avenue Contact Tank - South East Water

SMR PROJECTS LIMITED

This South East Water contact tank has a constant output of 18.1 million litres per day, it contains water which is treated with Sodium Tripolyphosphate and sodium hypochlorite before entering the distribution network. The structure is of a ‘certain’ age and has a number of active leaks that have progressively worsened over time. As the tank is in constant use, it cannot be taken off-line and so a solution was required which could be undertaken against heavy flow of water with the tank still in use. 
Sponsored
Advanced oil tank corrosion protection for a major US oil company

Advanced oil tank corrosion protection for a major US oil company

Hempel A/S

A major US oil company was experiencing corrosion in its sour crude oil tanks. Chemicals and water in the oil were creating severe pitting and corrosion issues at the bottom of the storage tanks. They contacted Hempel looking for a long-term protective lining solution.A poor lining system can result in substantial losses. Tanks and vessels left out of service for repair, cost owners valuable time and lost revenues. Hempaline vinyl esters have been designed to resist against acids, caustics, strong solvents, oil and water, protecting assets and maintain the purity of the content of the tank.To combat corrosion in the customer’s sour crude oil tanks we recommended our Hempaline Defend 500 vinyl ester mat reinforced to line the tank bottom and also the bottom 4 feet of the wall surfaces.The high-performance scheme was applied following grit blasting and consisted of a single coat of Hempaline Prepare 120 primer. A first coat of Hempaline Defend 500 was then applied and whilst wet, a 450 gm/m2 (1.5 oz/ft2) chopped strand mat was incorporated into the coating. Following a light sanding to remove any upstanding fibres, a second coat of chemically resistant Hempaline Defend 500 was applied.
Sponsored
EFFLUENT TANK HELPS HOSPITAL MEET STANDARDS

EFFLUENT TANK HELPS HOSPITAL MEET STANDARDS

Naylor Concrete Products Ltd

A Sealwall Tank manufactured by Whites Concrete has become part of Rampton Hospital’s new Energy Centre in Nottinghamshire, which is operated and maintained under a Carbon Energy Fund framework contract. Part of the new Energy Centre that provides heating, hot water and electricity to the Nottinghamshire Healthcare NHS Trust Hospital, Whites Concrete’s pre-cast concrete Sealwall Tank is a component of Rampton’s new effluent treatment plant—now a modern, automated system that meets both current environmental standards and future expansion of the site.
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
SOLUTIONS | Sammy Ofer Stadium Haifa, Israel

SOLUTIONS | Sammy Ofer Stadium Haifa, Israel

Five Star Products

PROJECT CONTRACTOR: Electra-B.S.T Registered Partnership/HAGIVAY.H. LTD PROJECT MANAGER: Electra-B.S.T: Silvivan ChachmoPROJECT ENGINEER: Electra-B.S. T: Offer Luzon / HAGIVA Y.H.: Priel LewMARKET/ENVIRONMENT: InfrastructureSUBSTRATE: Steel/ConcretePRODUCTS USED: Five Star® Fluid Grout 100 and Five Star® GroutPROJECT SIZE: Five Star Fluid Grout 100: 30,000 Kg / Five Star® Grout: 55,000 KgTHE CHALLENGETo construct an environmentally friendly, covered, 30,000-seat stadium in Israel's largest city of Haifa for the convenience of spectators, players, and judges. As such, two of the country's predominant construction entities were selected. A partnership was formed between Electra BST Registered Partnership and constructor Yossi Shiran, the largest engineering company in Israel, to complete this 80-million-dollar stadium over the course of five years.THE SOLUTIONFive Star® Fluid Grout 100 and Five Star Grout enabled contractors to create a unique stadium that is both meticulous and intentional in catering to the convenience of its visitors and players. Five Star's industry-leading cement-based, non-metallic, non-shrink Fluid Grout 100 and Five Star Grout were integral to the stadium's construction.
Sponsored
King's Cross Railway Station - London

King's Cross Railway Station - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall.
Sponsored
Hempaline Defend makes the grade at Shell storage depot in The Netherlands

Hempaline Defend makes the grade at Shell storage depot in The Netherlands

Hempel A/S

Shell Nederland operates a large fuel storage depot in Arnhem distributing fuel to gas stations throughout The Netherlands. With a number of storage tanks on site, regular maintenance to protect against corrosion is essential. In this instance, they required an internal lining for their Tank 214.Poor linings can result in substantial losses due to asset downtime as tanks and vessels are left out of action as a result of corrosion. It was essential that the tank was protected with a coating that would perform exceptionally with extremely corrosive contents, whilst maximising the assets lifetime and minimising downtime.Originally the project was set to be completed with another lining, but ultimately it was Hempaline Defend 630 Cure 72 Epoxy that was used.
Sponsored
St Pancras Station Restoration

St Pancras Station Restoration

Tarmac

St Pancras StationProject briefLimelite Heritage Mortars and Grouts to help restore St Pancras station buildings to their Victorian splendour.The ProjectMortars and Grouts from Tarmac Building Products, the leading manufacturer of blended cementitious products in the UK, have been extensively used in the historic conservation of St Pancras station.The major redevelopment of St Pancras includes the enlargement and refurbishment of the ticket hall, restoration of St Pancras Chambers as well as new passages to the existing Tube ticket Hall and Channel Tunnel Rail Link. PAYE Stonework and Restoration, a leading conservation specialist turned to Pozament for its expertise in pre-blended products formulated specifically for historic conservation work.A hydraulic lime-based combination of materials that offers sympathetic controlled strength was blended by the team to meet the specific requirements of PAYE Stonework and Restoration.Help from Tarmac Building Products – Limelite Heritage Mortars & GroutsAround eight tonnes of lime based, cement-free materials including Heritage Mortar 4 and Heritage Grout 7 were supplied to point the brickwork joints of passages to the existing tube ticket hall and Channel Tunnel Rail Link and to repair sofits in the Grade I listed St Pancras Chambers.Problems facedSt. Pancras Station is a Grade I listed building, meaning it is a building of exceptional interest and is one of the best Victorian buildings in central London. It has been voted one of London’s favourite landmarks and so great care had to be taken with the restoration work.OutcomesThe extensive redevelopment of St Pancras and Kings Cross Underground was completed by the end of 2007.  QuotesGary Hodges, project manager, PAYE Stonework and Restoration said, the range of pre-blended heritage grouts and mortars were ideal for this restoration project. Heritage Mortar 4 was highly suitable for the St Pancras Chambers repairs, reaching maximum strength within 7 days rather than the usual 90 days for other materials.Stuart Allerton, Quality & Technical Services Manager, Tarmac Building Products said, The Limelite Heritage range has specifically been designed to be sympathetic with historic buildings and caters for a number of applications. Our re-pointing mortars and free-flowing grouts are manufactured at our Swadlincote facility in Derbyshire to order, typically within five working days.·      Location: London·      Product: Limelite Heritage Mortars and Grouts·      Timescale: Completed in 2007
Sponsored
St Paul's Cathedral Restoration

St Paul's Cathedral Restoration

Tarmac

Project brief:A monumental restoration project for the iconic St Paul’s Cathedral spanning 15 years and costing £40 million. It was the first comprehensive restoration project that the Cathedral has gone through and this extensive cleaning, repair and renovation programme was one of the largest of its kind ever in the UK.The Project:It doesn’t get much more high profile than this when it comes to historic building restoration. As part of the London skyline for over 300 years, the requirement was for materials that perfectly balanced the strength and performance to do the job with the delicate nature of working with such a fragile and weathered structure. The sheer scale of the project also dictated the need for an extremely consistent product.Help from Tarmac Building Products – St. Pauls Grout Mix:Pozament, from Tarmac Building Products Ltd, boasts the heritage range of Limelite Grouts and Mortars specifically designed for such tasks. Yet in a project of such epic proportions and with the stakes so high our technicians instead produced an all new low strength blend of PFA, lime and special additives, that was capable of penetrating the fine voids and fissures in the Cathedral’s structure, whilst remaining sympathetic to the existing materials.The new grout, now named St. Paul’s Grout Mix, is easily mixed and in addition can be placed using gravity feed techniques, which are often used to ensure low pressures that are needed to avoid damage to delicate structures, such as in the case of St. Paul’s Cathedral.St. Paul’s Grout was designed to achieve a low strength of approximately 2.0 N/mm2 at 28 days, which was sufficient to strengthen and fill voids in the heartening of the masonry walls at St. Pauls Cathedral. The mix also contains a special plasticiser/wetting aid, so that when used at a water solids ratio of 0.4, a very fluid mix capable of penetrating fine voids and fissures is produced.Outcomes:The St. Paul’s Restoration project was finally finished in June 2011. To this day Tarmac continue to produce the St. Paul’s Grout when required and since then, it has been used successfully on many similar restoration projects including York City Wall, Winchester Cathedral and other English Heritage projects.
Sponsored
MediaCityUK, Manchester

MediaCityUK, Manchester

Instarmac Group plc

Ultrascapes’s Pro-bed HS, Pro-Prime and Flowpoint have been performing to the highest standard at Manchester’s £650 million development, MediaCityUK. Landscape paving contractor, English Landscapes, specified Ultrascape products for 40,000m² of paving at the high profile development. Over 2000 tonnes of Pro-Bed HS bedding mortar was supplied in bulk silos which provided a perfect base for the stone to be laid on. Pro-Prime slurry primer and the innovative Ultrascape Flowpoint flowable rapid setting grout were also used throughout the development. Flowpoint enables large areas to be grouted with this pourable material.
Sponsored
General Binding Rules 2020

General Binding Rules 2020

Marsh Industries Ltd

2020 General Binding RulesFor decades, millions of septic tanks have been installed throughout the UK in rural and urban areas. Septic tanks are known to be ineffective at processing sewage to modern environmental standards, causing long-term damage to the country’s natural water infrastructure and wildlife.It was therefore inevitable that new rules and a code of conduct would be introduced to prevent the effects of wastewater pollution once and for all; The Environmental Permitting (England and Wales) (Amendment) (England) Regulations 2014 came into force on 1 January 2015 creating the General Binding Rules (GBRs) for septic tanks or small sewage treatment plants for domestic use. These rules are designed to reduce the level of pollution from sewage in the nation’s watercourses.The rules state that any existing septic tank discharging to surface water, ie, to a water ditch, stream or river, etc, must have been upgraded or replaced with a new package sewage treatment plant by 1st January 2020.  Failure to comply can incur significant fines from the Environment agency and delays in selling impacted properties.OptionsCurrent methods of discharging wastewater from septic tanksPrevious to the General Binding Rules, wastewater from septic tanks was typically discharged in the following two ways:Drainage fieldWastewater is released through a network of pipes in surrounding sub-soils, providing an additional form of treatment for the waste from the septic tank. This helps to ensure that the wastewater being dispersed does not cause pollution.Septic tanks discharging into a drainage field are not affected by the 2020 septic tank regulations.Directly to surface waterWastewater flows through a pipe directly into a stream, river or lake. Binding rules state that direct discharge from a septic tank into a watercourse is not permitted.So, what are your options?1. Connect to the main sewerThis may not be possible in remote locations, although pump chambers can be used to direct wastewater to the mains sewer.2. Install a drainage field(Designed in accordance with BS6297)This allows the septic tank to discharge wastewater into the ground instead of surface water. In many cases, the installation of a drainage field is not possible due to site constraints such as space and/or the soil not having sufficient drainage potential (ie, rock, clay, high water table).3. Install a Uni:Gem septic conversion unitA Marsh Uni:Gem can be installed and connected to a pre-existing septic tank. This treats the wastewater to a sufficient quality allowing it to be discharged to surface water. See below for further detail.4. Upgrade your septic tank to a Marsh sewage treatment plantThis eliminates the need for a drainage field and ensures that the wastewater is fully treated before being discharged. Options include the Ensign, Ensign Shallow and Ultra Poylok L.Uni:Gem★Marsh Industries, the leading UK manufacturer of package sewage treatment plants, produces over 3000 units per year. However the company’s range of Uni:Gem★ septic conversion units is the only product available on the market which can treat wastewater from an existing septic tank without the need for a complete replacement product or drainage field upgrade.To comply with the GBRs and current EN standards, the entire Uni:Gem range was redeveloped from the ground up and tested, not only to meet, but to exceed UK and International standards. The Uni:Gem★ was born – creating an ‘industry first’ 2020 compliant septic conversion unit with outstanding processing performance.The Uni:Gem★ range was tested in accordance with BSEN12566-3/A1:2009 and EN12566-6 standards at the PIA GmbH test facility in Aachen, Germany, over the course of 38 weeks with a daily loading of:Flow: 900 litres/day BOD: 360g NH4: 48gTesting occurred between November 2018 and August 2019 to ensure all seasons were covered whilst minimum/maximum temperatures were tested to assure Ammonia and BOD process reduction for the UK climate. Holiday periods were also simulated during the test procedure. Final test results yielded an output of 12.5:16:4mg/ltr (BOD:Suspended solids:Ammonia) that is well within national discharge consent requirements.The Uni:Gem★ is an extremely cost effective solution for converting any polluting septic tank into a fully compliant sewage treatment plant ensuring homeowners, estate managers, water companies/amenities have an effective way to keep the environment clean whilst providing a quick and efficient installation process.
Sponsored
Improving water water in Manchester

Improving water water in Manchester

Marshalls Civils & Drainage

The modernisation programme of the multimillion pound project involves significant remediation of previously abandoned land, followed by construction of six circular primary settlement tanks (PST) and a large activated sludge plant (ASP) with 10 circular final settlement tanks (FST). This work will lead to significant environmental benefits for the site, improving the outflow, and subsequently the quality, of water entering the Manchester Ship Canal.
Sponsored
Lidl Doncaster | Lidl Tiling | Sopro RS 648 Vibration Slurry | compact-vibration floor tiling | Core PIC Ltd

Lidl Doncaster | Lidl Tiling | Sopro RS 648 Vibration Slurry | compact-vibration floor tiling | Core PIC Ltd

SMET Building Products Ltd

Sopro RS 648 Vibration Slurry was selected for the LIDL method of tiling which consists of compact-vibration floor tile fixing, in the new LIDL store in Bently, Doncaster. Smet Supported Partner, Core PIC Ltd, selected the superior quality German-made, RS 648 Vibration Slurry for its flexibility as a bonding slurry in the installation of stone and ceramic tiles, making it ideal for using in vibrated floor systems (or indeed conventional methods). The tiling was carried on on behalf of main contractor PDR Construction.In preparing the floor to LIDL spec, the floor screed is placed and struck off to required levels and pre-compacted using a straight edge. The bonding layer, namely Sopro RS 648 vibration slurry, is applied to prepared and pre-compacted floor screed and ceramic tiles are immediately placed with tightly butted joints to LIDL spec.After installation of a vibratable area (10 – 20 m², depending on situation/ambient conditions and resultant setting behaviour of floor screed), a surface vibrator is passed over floor covering and tiles vibrated into the adhesive bed. When sufficiently set, hardened and bonded joints were grouted with Sopro FL 526 Flexible Tile grout.Sopro RS 648 Vibration Slurry is a one-component, fibre-reinforced, polymer-modified, trass-bearing, cementitious bonding and contact slurry. Applied as flexible bonding slurry for installation of stone and ceramic coverings using vibrated floor system or conventional methods. It’s ideal for slurry application technique. Sopro RS 648 is particularly suitable for laying tiles with low water absorption (fully vitrified stoneware). For laying large-format units (30 cm × 60 cm) using vibrated floor system. It can also be used as slurry-applied bonding layer on substrates and on bedding adhesive.Sopro FL 526 Flexible Tile Grout is a flexible, trass-bearing, cementitious tile grout, meeting CG2 WA requirements to DIN EN 13 888. Suitable for grouting ceramic, fully vitrified stoneware, natural and cast stone coverings and glass block assemblies. Rapid set for low-suction tiles, with specially tailored joint-filling properties and first-rate washability (removability). Particularly suitable for balconies, patios and in conjunction with floor heating systems (UFH).The product’s special properties and SMET’s superior technical backup, are key factors in choosing Sopro RS 648 Vibration Slurry and Sopro FL 526 Flexible Tile Grout. Smet Building Products Ltd is committed to delivering high-quality products to the construction of LIDL stores.For more info on our range of SMET Professional Tiling Products.PDR built the new LoF (Lidl of the future) store in Bentley Doncaster. The 23,000 sq/ft store with its striking design will help to increase Lidl’s market share and see their profits continue to rise in the UK. The Bentley store will be PDR’s 10th new build store for Lidl.Related DownloadsTDS Sopro RS 648 Vibration SlurryTDS Sopro FL 526 – Flexible Tile GroutSmet Professional Tiling Systems Brochure
Sponsored
St.David's Shopping Centre - Cardiff

St.David's Shopping Centre - Cardiff

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

8,000m2 of limestone tiling was fixed using ARDEX X 7001 W Tile Adhesive with Rapidry Formula  Technology. The luxury tiles were grouted in just two hours, providing the perfect finish to the £675m modernisation of the shopping centre.
Sponsored
King's Cross Railway Station

King's Cross Railway Station

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall. Taking advantage of ARDEX’s unique RAPIDRY FORMULA Technology, ARDEX A 35 Screed Cement was laid to 85mm and was ready for tiling in just 24 hours.
Sponsored
Milner Hall, Winchester

Milner Hall, Winchester

Tarmac

THE CHALLENGE Milner Hall, a former chapel in Winchester, is one of the oldest structures in the city and a building of great architectural and religious importance. Built by the Reverend John Milner in 1792, the hall is now used for community events and meetings. In addition to the significant heritage of Milner Hall, an X-ray of the western elevation found a number of voids in the foundation due to hundreds of years of water damage. What’s more, part of an inadequate retaining wall had collapsed onto the same elevation, with the potential to cause further damage if left untreated. When Tarmac’s Limelite team was approached regarding the Milner Hall project, they instantly recommended Tempo PCE who they’d successfully worked with a number of times. THE SOLUTION Tempo PCE commonly chooses Limelite 7 for its projects; a Tarmac grout with hydraulic lime content that’s specially designed for heritage buildings, especially ancient structures such as churches. This was the ideal product to suit the needs of Milner Hall where the grout would need to be injected at a low pressure from the outside, directly filling the internal voids. Tom Phillips, Director of Tempo PCE, said: “We regularly use Limelite products and Limelite 7 was ideal for the work required at Milner Hall. The technical support they offer is incredibly valuable, as well as their reach and industry-reputation. “We strive to only work with manufacturers who can offer value and work with us as partners to ensure the best possible product is provided for a strong finish. We certainly get that with Tarmac’s Limelite team.” Iain Spence, Technical Manager for Tarmac’s Limelite range, added: “Historic structures often present suppliers with a wide number of challenges when it comes to the specification of suitable materials, and their subsequent installation. “In the case of the work at Milner Hall, the requirement was for a fluid, low strength grout that would stabilise the void in the masonry of this Grade II listed building. The Limelite Heritage Grout system provided a breathable low-density solution for these works. “Given the often delicate nature of period and historical structural repair projects, working with dedicated and knowledgeable contractors is essential to achieving the correct end result. Tempo PCE completed the works at Milner Hall utilising their extensive application skills with the Limelite Grout, delivering a much-needed structural support to the building’s foundations which should add many more years to its operational life.” 
Sponsored
ABG blueroof - Green Extensive, Huddersfield University, UK

ABG blueroof - Green Extensive, Huddersfield University, UK

ABG

The design in this project was to have a Green Roof and warm roof system The aim was to place standard green roofs which retains water but allows most of the rainfall to run into buried SuDS tanks. Following consultation with ABG the design was changed to the ABG Blueroof system. The primary advantage of the system is that utilising the roof construction for water storage reduced the need for underground attenuation tanks. The simplicity of the design allowed for attenuation capacity and green roof installation at the same time saving the client time and money.
Sponsored
Greenham Dwelling Upgrade

Greenham Dwelling Upgrade

Kingspan Klargester

A residential dwelling with a failing septic tank located very far from the property, no longer fit for use required a new sewage treatment plant.
Sponsored
Madrid Airport

Madrid Airport

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Working on 100m2 per night, the entire floor of natural stone tiles had to be refurbished whilst the airport remained fully operational. The solution was a high strength ARDEX Ultra Rapid Drying Screed Cement in combination with ARDEX MICROTEC Natural Stone Adhesive, and Rapid Drying Tile Grout.
Sponsored
UltraTile works up an appetite at Slim Chickens

UltraTile works up an appetite at Slim Chickens

Instarmac Group plc

SGB Contractors have used UltraTile adhesives and grouts to install 250sqm of tiles at Slim Chickens’ brand new restaurant.BackgroundThe much-loved fast-casual food chain, Slim Chickens, have opened their latest restaurant at Bristol Cribbs Causeway shopping centre – the heart of Bristol shopping.The ChallengeTime was of the essence for SGB Contractors, who had just two weeks to install 250sqm of tiles at Slim Chickens’ brand new restaurant. It was imperative that the materials used adhered to the strict restaurant branding to be in keeping with the iconic interior design that Slim Chickens customers love.The SolutionUltraTile has a long and successful history of providing trusted and proven tile adhesives and grouts to the hospitality sector. For this exciting location, SGB Contractors used ProFlex SP and ProSS Flex adhesives and ProGrout Flexible grout to install and joint the chosen tiles.ProFlex SP rapid set flexible tile adhesive is classified as S1 in accordance with EN 12004 and boasts a high level of deformation for greater tolerance to movement. The S1 properties of ProFlex SP makes it the perfect choice for timber floors, swimming pools and underfloor heating systems.Specially formulated with enhanced adhesion and flexibility, ProSS Flex is a polymer modified adhesive suitable for use with most common substrates and tiles.Completing the project, SGB Contractors used ProGrout Flexible in Charcoal to grout the tiles. Designed for areas where movement or vibration is likely. ProGrout Flexible is suitable for joint widths up to 20mm and is washed down easily with minimal effort.Available in 12 beautiful tones, ProGrout Flexible is mould resistant, boasts a 30-60 minute pot life and will hard set in just 12 hours. What’s more, ProGrout Flexible has been developed using ColourShield Technology – a process which involves the addition of a specialist additive for lasting colour protection.ResultsThanks to the expertise of SGB Contractors and the reliability and durability of UltraTile materials, this project completed on time and the residents of Bristol are now able to enjoy their chicken wings in a beautifully decorated restaurant.
Sponsored
ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG blueroof - Green Biodiverse, Moreland Primary School, Islington, UK

ABG

Moreland Primary School is a purpose built school, nursery and Children's Centre requiring a multipurpose usable outdoor space. Due to lack of space, the ground attenuation tanks planned would reduce site storage and limit access to other trades, therefore delaying the project, The challenge was to develop a storage/discharge system which wouldn't impact the project and be sensitive to the local biodiversity action plan. ABG designed a versatile Blue Roof System removing the need for attenuation tanks and allowing the roof finishes required. ABG bio-diverse roof system helped maximise the BREEAM credits laid out in the action plan
Sponsored
McCullagh’s Classic Service Station (Spar) - Design Tile

McCullagh’s Classic Service Station (Spar) - Design Tile

R-Tek Manufacturing Ltd

Award winning McCullagh’s Classic Service Station (Spar) chose Design Tile, Shaletone on Dark Grey grout for their recent refurbishment.After the refurbishment McCullagh’s Classic Service Station went on to win three prestigious business awards – ‘NI Retailer of the Year’; ‘Food to Go of the Year’ and UK ‘Forecourt Retailer of the Year’.
Sponsored
JACKOBOARD® Promotes Cost & Time Saving Benefits of Waterproof XPS Construction Board

JACKOBOARD® Promotes Cost & Time Saving Benefits of Waterproof XPS Construction Board

BEWI UK (JACKOBOARD®)

JACKOBOARD® by BEWI offers many benefits for installers of wetrooms and bathrooms. JACKOBOARD® is a waterproof, weight-loading and thermally insulating construction board for use in all types of tiling jobs.Critically, because it is manufactured from 100% waterproof XPS, there is no need to tank wetrooms constructed using JACKOBOARD®, either with a waterproof membrane or a paint-on solution. This saves the installer both time and money, since a separate tanking system is not required and only the joints where the boards meet need to be taped.The NHBC Standard states that “backing surfaces may require protection from a suitable tanking system”.“This guidance is completely correct,” says Martin Harragan from JACKON by BEWI, “but it should not be interpreted to mean that if you are using an XPS backerboard, such as JACKOBOARD®, you have to tank the entire substrate of your wetroom. The closed structure of an XPS board means that it is totally impossible for water to pass through it, in the way that it would through a fibre cement board for instance.”JACKOBOARD® is keen to communicate this message to the many different trades who get involved in the installation of wetroom systems, from the shower tray upwards. Although there are wetroom specialists, this job is often down to plumbers, M&E contractors, tilers, dryliners and flooring contractors. So, as wetrooms continue to increase in popularity, there are different trades who need to be aware of the benefits of XPS backerboards.While offering the benefits of XPS, JACKOBOARD® can also offer a price advantage in the marketplace, due to the fact that the company manufactures its own foam, giving it complete control over cost, product quality and sustainability of manufacturing processes. These factors have enabled JACKOBOARD® to become the UK market leader in XPS construction boards.
Sponsored
Freemasons Hall Renovation

Freemasons Hall Renovation

Mapei (UK) Ltd

Mapei adhesive and grout products have been specified for the installation of a stone pattern in the reception and washroom areas in a refurbishment to the Freemasons’ Hall, London. The Hall first opened in 1933 as a memorial to the 3,255 Freemasons who died during active service in the First World War, and has been used for events, the meeting place for the Grand Lodge, and annual meetings of the home counties since.
Sponsored
Lympstone Manor

Lympstone Manor

Schlüter-Systems Ltd

In looking for a full tanking solution for the ensuite bathrooms of renowned chef Michael Caines’ dream project, stone specialists Devon Stone elected to use various forms of the multi-functional tile backerboard Schlüter®-KERDI-BOARD.
Sponsored
UltraScape flowpoint used at beautiful and historic Citadelle of Namur

UltraScape flowpoint used at beautiful and historic Citadelle of Namur

Instarmac Group plc

BackgroundLocated on a hill overlooking the union of the Sambre and Meuse rivers, the Citadelle of Namur has witnessed ‘millions of years of geological history and two thousand years of human history’.In 2021, cable cars were added to the extensive list of attractions at the Citadelle, giving visitors beautiful panoramic views of Namur.The ChallengeThe Citadelle is an extremely popular tourist attraction and therefore an extensive downtime was not possible. To coincide with their exciting new addition, paving was installed at the entrance to the cable cars and surrounding the exhibition centre. It was critical that the paving was installed with durable materials that would withstand heavy foot traffic, and would also provide a stunning finish suitable for the historic environment.The SolutionWith over 25 years’ experience providing the world with BS 7533 compliant paving installation materials, UltraScape was an obvious choice to use at this exciting location.Supplied by Instarmac International’s Belgian partner, Nijst Natuursteen, UltraScape flowpoint rapid set flowable grout was used to joint 800sqm of paving at the Citadelle.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain – even in the hottest and coldest of temperatures.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsThe work was completed in 2021 and visitors to the stunning and historic Citadelle are now enjoying a beautifully paved area whilst in line for the cable cars.
Sponsored
UltraScape paves the 'Greenest City' in Europe

UltraScape paves the 'Greenest City' in Europe

Instarmac Group plc

Instarmac International’s Swedish partner, Pekuma, have supplied world renowned UltraScape flowpoint to joint 300sqm of paving at Växjö’s newly refurbished bus station and city hall.BackgroundIn the station area, along Norra Järnvägsgatan, is Växjö’s brand new station and municipal building. The old town hall now boasts a better working environment for its 600 employees and a 1,850sqm station which includes waiting area, shops and restaurants.Växjö’s beautiful new town hall has been designed to the highest environmental standards and is fondly known as the ‘greenest city in Europe’.The ChallengeAs part of this exciting project, 300sqm of cobblestones and concrete slabs were installed directly outside the entrance to City Hall to create walkways for pedestrians and stop/start sections for buses.It was imperative that the jointing material used to grout the 100 x 100mm cobblestones and 210 x 210mm concrete slabs would not only fit in with the aesthetic of the newly refurbished building, but would also provide a durable finish that could withstand the constant trafficking from pedestrians and vehicles.The SolutionInstarmac International’s Swedish partner Pekuma, supplied UltraScape flowpoint to Skanska, the contractors working on this project.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsThe project was completed on time with residents, visitors and employees of City Hall now enjoying the beautiful new station and town hall.
Sponsored
London Aquatic Centre - Olympic Pool

London Aquatic Centre - Olympic Pool

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

866,000 tiles were fixed in the London Aquatics Centre, which formed the gateway to the Olympic Park. Products used: ARDEX WPC Waterproof Protection System, ARDEX S 7 Flexible Waterproof Coating for Floors and Walls, ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar, ARDEX X 77 MICROTEC Flexible Wall & Floor Tile Adhesive, ARDEX-FLEX FL Rapid Setting Flexible Tile Grout for Wide Joints.
Sponsored
Small WC wetroom with wedi Top

Small WC wetroom with wedi Top

Wedi Systems (UK) Ltd

The client here had a small space that they wanted to use to create a wetroom, wedi liaised directly with the designer and tiler to assist with the products used in the final installation. This includes a wedi "Slim Kit" and wedi "Top" material on the floor as the finished surface. wedi Top was utilised to keep the whole build-up as slim as possible as it offers anti-slip and mould resistance in a mere 6mm thickness without the need for grout lines and cleaning that you would have with a traditional tile.
Sponsored
UltraScape is a hard act to follow at iconic Australian theatre

UltraScape is a hard act to follow at iconic Australian theatre

Instarmac Group plc

In May 2018, Australia’s visionary theatre, La Mama, was destroyed by fire. Thanks to the generosity and hard work of The La Mama Community, this iconic theatre has now reopened to the public and UltraScape are delighted to have played a part in its restoration.BackgroundLocated in Victoria, Australia, La Mama Theatre is home to responsive, inclusive and diverse independent theatre making. With a reputation steeped in visionary arts, La Mama Theatre is the number one destination for audiences to discover the next generation of theatre artists.The ChallengeA fire devastatingly destroyed this much-loved theatre in May 2018. The damage was so extensive, La Mama theatre needed to be completely rebuilt. Part of the restoration included an additional structure to the front of the theatre and new paved area.The SolutionThe incredible La Mama community raised over $3,400,000 to help restore the theatre back to its former glory. To grout the Recycled Brick Paving at the theatre, Instarmac International’s Australian partners, and specialist paving distributors, Prolific Stone International, supplied UltraScape flowpoint smooth.Greysea Group, the contractors completing the paving installation, have been using flowpoint since it was first introduced into Australia in 2020.UltraScape flowpoint smooth is a flowable grout which allows for large areas of paving to be grouted quickly. Suitable for joints from 3mm to 50mm and as deep as 200mm, flowpoint smooth has been developed over a number of years to provide a durable finish which will not crack or stain – even in the hot Australian temperatures.With an initial set after just 15 minutes, and a walk on time of one hour, it is unsurprising that flowpoint smooth has become synonymous with fast application, cost-effective and robust jointing.UltraScape flowpoint is available in four varieties – original, eco, smooth and fine – and two colours – Natural Grey and Charcoal. UltraScape have jointing solutions for all designs and tastes.ResultsLa Mama Theatre opened to the public in December 2021 with great applause. The newly refurbished theatre is fully accessible, has a dedicated rehearsal space, new bar, green room and mezzanine floor for their next generation of theatre artists to perform on.
Sponsored
Gowriehill reservoir

Gowriehill reservoir

Fosroc International Limited

Gowriehill Distribution Service Reservoir is located in Dundee City and managed by Scottish Water. In late 2021, part of the reservoir tank construction was discovered to have a brittle asphalt waterproofing layer over the top of a beam and block roof. Fosroc proposed a solution that was easy to apply and provided a robust watertight finish and a 20 year warranty.
Sponsored
Bradford City Park

Bradford City Park

Instarmac Group plc

UltraScape Pro-Bed HS, Pro-Prime and Flowpoint ECO are being used to help make Bradford’s City Park a world class public park. Bradford Council, in conjunction with landscape architect Gillespies and consulting engineer Arup, have specified UltraScape’s Pro-Bed HS Bedding Mortar, Pro-Prime Slurry Primer, EP-R9 Epoxy Bedding Mortar and Flowpoint ECO flowable grout – in Natural and Charcoal – for use by the main contractor Birse Civils, to lay the setts, porphyry and sandstone in and around the Mirror Pool.
Sponsored
University of Winchester

University of Winchester

Be-Plas Hygienic Walls & Ceilings Ltd

The University of Winchester programmed the upgrade of 63 student en-suite showers and toilet facilities for their halls of residence through the 2014 summer vacation period over an eight-week program. The walls were covered with tiling. The grout was difficult to clean and the tiles were showing signs of age which required regular repair. It was decided to renew areas with materials that would give long life, reduce maintenance costs and above all make it much easier for the cleaning teams to accomplish their tasks quickly and effectively.
Sponsored
HUGO BOSS, BICESTER VILLAGE

HUGO BOSS, BICESTER VILLAGE

Dural (UK) Ltd

Bicester Village is a designer outlet centre situated on the outskirts of Bicester, a town in Oxfordshire. It opened in 1995 and has become hugely popular. Hugo Boss, the luxury fashion brand, selling clothing, accessories and footwear needed advice for their textured tiled floor in their new store opening at the designer outlet. The beautiful high texture tiled floor was calculated to be approximately 300m2. When considering such a large expanse of tile it is important to use movement joints. Hard flooring expands and contracts, a movement joint prevents the tiles and grout from cracking and deboning. 
Sponsored
Gardens Sorted

Gardens Sorted

Lindab Ltd

Eco conscious barn conversion Landscape Design company Gardens Sorted specialise in renovation and bespoke garden installations. This project is a former farmyard and threshing barn conversion, the brief was to follow sustainable principles, the artifacts used around the garden are largely reclaimed, reused or recycled agricultural items.The client gardens by organic principles therefore the need for non-PVC galvanised rainwater goods was paramount. Chris Bligh, designer and installer at Gardens Sorted describes the installation: ”The rainwater solution required the high roof gutters to be deep profile, maintenance free, non-blocking outlets, and a long elegant downpipe into the storn water drain accross the yard. The addition of a rainwater diverter at the lower section afforded connection to a pressure water hose under grounded to two bends emptying into a reclaimed galvanised water tank. The hose is always full of water to the height of the tank. The important value of this is that the client can then dunk a large watering can into the deep water at waist height.” Chris adds that Lindab’s Rainline products are very good and he was grateful for a high standard of customer service.

Showing 1-36 of 95

Feedback