OVERVIEW
This South East Water contact tank has a constant output of 18.1 million litres per day, it contains water which is treated with Sodium Tripolyphosphate and sodium hypochlorite before entering the distribution network. The structure is of a ‘certain’ age and has a number of active leaks that have progressively worsened over time. As the tank is in constant use, it cannot be taken off-line and so a solution was required which could be undertaken against heavy flow of water with the tank still in use.
Contact SMR PROJECTS LIMITED by clicking the button below to find out which products were used in this case study.
The Sill, Landscape Discovery Centre
Splashpoint - Worthing
South East Water Reservoir - Kent
Royal Liverpool Hospital