NBS Source
I'm a manufacturer

Improving water water in Manchester

OVERVIEW

The modernisation programme of the multimillion pound project involves significant remediation of previously abandoned land, followed by construction of six circular primary settlement tanks (PST) and a large activated sludge plant (ASP) with 10 circular final settlement tanks (FST). This work will lead to significant environmental benefits for the site, improving the outflow, and subsequently the quality, of water entering the Manchester Ship Canal.

Products featured in this case study

View all products (42)
Box Culverts - Drainage Culvert

Box Culverts - Drainage Culvert

More inspiration from Marshalls Civils & Drainage

View inspiration
A259 Hastings

A259 Hastings

M1 Junctions 28 - 31

M1 Junctions 28 - 31

Hitachi Train Factory, County Durham

Hitachi Train Factory, County Durham

M1 Junction 28 - 31, Nottinghamshire

M1 Junction 28 - 31, Nottinghamshire

More inspiration from Concrete box culverts

View inspiration
Saltburn on Sea Attenuation

Saltburn on Sea Attenuation