NBS Source
I'm a manufacturer

St.David's Shopping Centre - Cardiff

OVERVIEW

8,000m2 of limestone tiling was fixed using ARDEX X 7001 W 

Tile Adhesive with Rapidry Formula  Technology. The luxury tiles were grouted in just two hours, providing the perfect 

finish to the £675m modernisation of the shopping centre.

Products featured in this case study

View all products (92)
ARDEX X 7001 Rapid Drying Floor Tile Adhesive

ARDEX X 7001 Rapid Drying Floor Tile Adhesive

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

Victoria and Albert Museum - London

Victoria and Albert Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai

More case studies from Tile adhesives

View all case studies (11)
UltraTile works up an appetite at Slim Chickens

UltraTile works up an appetite at Slim Chickens

Houses of Parliament - London

Houses of Parliament - London

Sydney Opera House - Australia

Sydney Opera House - Australia

McDonald's Tiling Refit for UK Restaurants

McDonald's Tiling Refit for UK Restaurants