NBS Source
List your products

flooring

6,245 results found

Sort by:

Showing 1-36 of 1205

Access Flooring for Cheltenham Offices

Bathgate Flooring Ltd

Access flooring once again was selected for this major £12 million building in Cheltenham. Bathgate Flooring manufactured and installed over 5600m2 of Panels to ensure that this Grade A office space offered the maximum flexibility. Products Used BGM 600 Steel Encapsulated Panels Constructing this Office Development is well recorded with a time lapse video of the entire project available through the Gloucestershire Live news story. Access Flooring is used in buildings like this to ensure that there is easy access to the services if needed. Simply lift up the floor panels and all the cabling is visible beneath.

How NOT to fit a Wood Floor

The Solid Wood Flooring Company

The crown line for the Herringbone E931 has been set out very well, however the floor has not been protected and the equipment has been left on the new floor.The actual floor will easily get damaged and the client will probably end up with a damaged floor and probably expensive repairs because of the lack of care.What should happen is that the floor should be covered at all times, and the site kept clean, with adhesive and other equipment kept off the new floor, that has been fitted

Bespoke designer flooring for a rustic vibe

BIM Flooring (UK)

Featuring one of our designer series products, this bespoke finished European oak flooring defines the character of the house and its tenants. With a bit of a rustic vibe and its grey tone, it matches perfectly with the decoration and furniture.

The Gherkin, Restaurant Floor 39

Ryebrook Resins Flooring Ltd

Following Ryebrook Resins’s successful installation at the London St Pancras Grand Champagne Bar, Searcys who operate on the top 3 floors of The Gherkin building contacted us once more to install our Ryeflor RT liquid polyurethane based floor finish to their 140m2, 39th floor restaurant kitchen in a dark grey colour. This rapid curing environmentally friendly finish is ideal for operational kitchens where down time is at a premium.

Harmony of gold detailing and walnut flooring

BIM Flooring (UK)

Following the trend of pairing walnut flooring with light-coloured furniture and fixings, we wanted to showcase this product in the master bedroom. The gold detail around the light trough adds a sense of luxury to the room, and its yellow tone is reflected in the wood colour which introduces cohesiveness into the design.

Burn the Floor Performances

Harlequin Floors (British Harlequin plc)

“Over the last 10 years, our relationship with Harlequin has modernised our approach to Ballroom and Latin dancing; smoothly transitioning our company to a Harlequin Reversible touring surface, which provides our dancers with the perfection and confidence they need to deliver their performances.” Peta Roby Executive Producer Burn The Floor

Imaginative Wood Floor Installations

The Solid Wood Flooring Company

Supplying and installing a floor in the Jorvik Viking Museum in the centre of York. The board installed was our E157 select grade 260mm wide engineered unfinished Oak. Being unfinished it and high quality it allowed for the river to be created using a router and stainless steel insert and different coloured oils. The museum opens in the spring of 2017 so please visit and see for yourself. If you have any innovative design projects in any location, please contact us directly on 01666 504015

Installing Wood Flooring in a Hallway

The Solid Wood Flooring Company

Supplying and installing a floor in the Jorvik Viking Museum in the centre of York. The board installed was our E157 select grade 260mm wide engineered unfinished Oak. Being unfinished it and high quality it allowed for the river to be created using a router and stainless steel insert and different coloured oils. The museum opens in the spring of 2017 so please visit and see for yourself. If you have any innovative design projects in any location, please contact us directly on 01666 504015

Stair Cladding with Wood Flooring

The Solid Wood Flooring Company

We are able to manufacture engineered wood stair units to match our flooring with the same colour and finish.The stair units include the tread and riser and can be made to exact sizes if we have detailed drawings. This means installation costs will be less. These stair cladding units can be fully bonded to old stairs, concrete stairs or Steel stair structures.The cost of these stair units are considerably more than our standard stair nosings and a deposit will be required before production because they will be to your specification. Lead times are around 12 weeks.

Junckers Regal Sports Floor

New Era Floor Systems Ltd

Nike has transformed The Regal basketball court at the Black Prince Community Hub in South London, using Junckers Beech SylvaSport floor pre-finished with black oil over a New Era fully sprung sub-floor system.

Bright spacious terraced apartment with 1 strip multiply flooring

BIM Flooring (UK)

This spacious apartment located in the heart of London features our 1 strip multiply flooring and with natural wood colour variation the flooring happens to reflect the bricked houses around the property, tying the modern apartment to its surroundings. The warm colour of the wood also creates a sense of coziness in the open plan apartment.

American walnut flooring in Canary Wharf Developments

The Solid Wood Flooring Company

Marketing Rooms and Apartments for the Wood Wharf Development in Canary Wharf. However they wanted a more select floor which we were able to do by supplying 20% to 25% more than required to create a stunning near virtual Prime Black American Walnut floor at a fraction of the cost.A lot of other trades were also completing work at the site including the fit out of show apartments for the Wood Wharf Development. This meant that the floor had to be covered to protect the surface.The product was our E515 which is a 15mm thick oiled walnut.

Kingspan Flooring For New Civic Offices In Rochdale

Kingspan Access Floors Ltd

Nearly 13,000m2 of Kingspan access flooring is being installed in new civic offices for Rochdale Metropolitan Borough Council being built by Sir Robert McAlpine. The Kingspan RMG steel encapsulated flooring has a finished floor height of up to 400mm to contain a range of M&E services, including a sealed air plenum system to provide air conditioning, pipework from a biomass boiler to generate sustainable heat, and further pipework carrying rainwater collected from the roof and recycled for toilet flushing. Kingspan began the installation towards the end of March and it is due to be completed in 20 weeks.

American walnut flooring in Canary Wharf Developments

The Solid Wood Flooring Company

Summer 2019 saw The Solid Wood Flooring Company work with Base Interior and other key suppliers to complete a refurbishment inspired by Scandi design in the affluent district of Kensington, London. Fitzhardinge House offers a crisp, clean and modern aesthetic, achieved by using our Light Brushed Fumed Raw Timber UV Cured Finish Flooring Suitable for underfloor heating, this 15mm thick flooring opened up the space to create a spacious area that would stand the test of time. This project demonstrated what can be achieved when trades and suppliers combine, creating a space that looks as impressive as it functions.

Simple striking corridor with natural facade and flooring

BIM Flooring (UK)

A welcoming corridor with seamless and subtle storage space hidden by a wall facade that matches the Chevron, while the circular mirror and lighting cuts through the straight lines. The use of grey-tones with natural materials allows them to shine and create the simple and striking space you see here.

Cladding Stairs in Engineered Herringbone Parquet Flooring

The Solid Wood Flooring Company

Few people realise that it is possible to clad old stairs with our engineered herringbone parquet floors. It is a specialist skill and you should only employ trusted professionals who have the specialist equipment. The parquet blocks used here are unfinished so that you get perfect square edges. They are then oiled after all other works are completed so that you get your perfect floor. There is no separate stair nose piece as the top layer of solid Oak is a good 4mm thick and this allows the fitters to create an accurate mitre join.

Kingspan Access Flooring Supplied For New Headquarters For York Council

Kingspan Access Floors Ltd

Over 12,500m2 of Kingspan access flooring is being installed in new civic headquarters and customer service centre for York Council on the site of a grade 2 listed former railway station within the historic city walls. Northern Access Floors Director Steve Robson said: “The flooring in the redeveloped area is installed over listed floorboards, so a low cost, fit-for-purpose flooring system was required, Kingspan’s particleboard panels met those needs perfectly. The new build element of the project will have much more usage and the panels will be installed on concrete, so steel-encapsulated panels were specified.”

Decorative and seamless flooring supplied for atrium area to Radclyffe School

Sherwin-Williams High Performance Flooring

A new flooring finish was required for the atrium in the Radclyffe School in Oldham, Greater Manchester. Because the atrium floods this area of the school with so much light through a Perspex roof, it meant that whatever was chosen had to be UV stable, hard wearing and safe. The system also had to be economic, hard-wearing, easily cleaned, have low odour during application and chemical resistance, slip resistance and non-dusting. Sherwin-Williams’ technical flooring experts looked at their diverse range of Resuflake options for this specific application covering 800 sq metres.

Using Specialist Wood Finishing Products to create a Unique Wood Floor

The Solid Wood Flooring Company

This case study shows the different affects you can get by using professional timber treatments. Our experts can help you choose your perfect bespoke finish and colour to match your interior décor. This is a specialist area and only professional fitters with finishing experience on site should be used. Some of the treatments require pre-treatment to change the tannins in the wood which will require buffing with a white pad before applying a top coat. Others are the latest lacquers that can be easily applied on site.

Morrisons hot cross bun bakery gets long lasting flooring solution

Sherwin-Williams High Performance Flooring

Sherwin-Williams polyurethane floor screed FasTop TG69 provided the answer for the Morrisons bakery in Yorkshire. This large facility with a variety of activities required a long term flooring solution for a hygienic finish to withstand the daily cleaning process used in this type of food factory environment. FasTop TG69 is certified with low slip potential in wet conditions and provides an impervious finish which can with stand steam cleaning and has excellent chemical resistance. The system is HACCP certified as Food Safe and Campden BRI approved as low odour and non-taint. The perfect food factory solution.

Sherwin-Williams Resuthane TG69 supplied to Billingsgate Market for long term hygienic flooring solution

Sherwin-Williams High Performance Flooring

A rapid solution was required for Billingsgate Market - the UK's largest inland fish market - that was fit for purpose, exceptionally durable and would not disrupt daily operations. The project involved supplying Sherwin-Williams Resuthane TG69 flooring to the 13 acre ground floor of the self-contained market complex, which comprises of 98 stands and 30 shops. The solution had to be food-safe with outstanding wearing properties. A decade after it was installed , the flooring has stood the test of time and is a testament to why Resuthane is widely used in the food and drinks sector.

FasTop RS69 provides the toughest flooring solution for one of Moscows busiest rail maintenance depots

Sherwin-Williams High Performance Flooring

Sherwin-Williams FasTop polyurethane floor screed range is used mainly in the food industry but because its so tough as a long term solution it used throughout industry where heavy duty use demands the most durable flooring solution.Not only do floors in rail maintenance areas and train stations need to withstand heavy footfall traffic, they also need to be non-slip in all weathers, and conform to strict fire regulation and legislation. Our anti-slip, seamless systems are chemical and impact resistant, as well as being cleanable. For this large area in Moscow FasTop TG69 met all the requirements.

Resuflor and Resupen WB provide smooth dark floor finish for the Richard III Exhibition in Leicester

Sherwin-Williams High Performance Flooring

The flooring requirement at this museum in Leicester stipulated a safe and cleanable seamless finish to exhibit the discovery of Richard III's remains and the story behind the Battle of Bosworth. A simple black finish was specified in keeping with the design of this facility. The exhibition takes visitors through the history of the Wars of The Roses and then fast forwards 500 years to a Leicester car park where a discovery was made. Resuflor self smoother was installed at 3mm thickness across the floors and this was sealed Resupen WB Satin Black to give the desired sheen finish.

London Drinks Manufacturer has FasTop RS69 as heavy duty flooring solution

Sherwin-Williams High Performance Flooring

Sherwn-Williams demonstrated what technical assistance can be provided on projects before any quotations or specifications are organised. A low viscosity primer Resutop Binder was recommended as a penetrating primer to case harden and consolidate the screed. Epoxy screed repairs were installed where required to make good any damaged areas. Once a sound substrate was established Resuprime MVT moisture tolerant primer was installed incorporating a fabric mesh over all joints and pitted areas to reduce any potential cracking of this substrate, followed by 9mm thick FasTop RS69 polyurtehane screed.

Sherwin-Williams non-slip flooring solution provides a premier solution for Manchester City Football Club's Etihad Stadium

Sherwin-Williams High Performance Flooring

Resucoat HB the high-build epoxy resin manufactured by Sherwin-Williams is over around 12000 square metres of concourse floor area. For this project with heavy and intense footfall it was essential to have a hard wearing coating with a degree of texture for non-slip performance which also would be cleanable to provide a great looking floor for this high profile facility. A special very hard aggregate is incorporated into the coating which is the same product used for non-slip texture on areas such as the decks of United States aircraft carriers.

IPL Food Unit finds FasTop floor screeding systems are perfect solution as a long term working surface with HACCP standards

Sherwin-Williams High Performance Flooring

FasTop resin flooring was chosen as it provided long term flooring solutions which would be seamless and have the hygienic standards required for this industry and the colours required could be provided . The flooring products supplied by Sherwin-Williams had the necessary fast cure performance with the alternative textures to provide a variety of finishes from smooth easy clean surfaces to heavy duty more textured areas where more non-slip texture was required which would be resilient to aggressive cleaning processes. ART and Sherwin-Williams were able to provie self-smoothing smooth finishes and trowel applied textured finishes.

Mezzanine Floor

Knauf AMF Ceilings Ltd

Access Self Storage was one of the first companies to recognise the benefits of AMF ceiling tiles. Knauf AMF’s Thermatex range of high density mineral wool ceiling tiles provide in excess of 60 minutes fire protection to mezzanine floors, timber joists and steel beams in accordance with BS476: Parts 20 to 23. Warrington Fire Research Centre carried out specific tests on AMF ceiling tiles installed in a AMF Ventatec exposed grid system under a mezzanine floor found that they gave 90 minutes of load-bearing capacity, 89 minutes of integrity and 89 minutes of insulation

Bright UV stable floor coating installed at Duxford Air Museum to show off aviation exhibits at their very best

Sherwin-Williams High Performance Flooring

Sherwin-Williams polyurethane floor coating Resutile provided a bright solution for this large museum area full of famous aircraft which have been part of aviation history. Lots of natural light came into this area so any coating chosen had to be UV stable to avoid discolouration over time which would spoil the aesthetic appearance. Resutile has great chemical reistance and is fully light resistant. The product has been used in Aircraft hangars around the world for twenty five years to create and enhance bright modern environments.

The Copperworks in Leeds required a floor refurbishment over some 30000 square metres - Sherwin-Williams Resucoat HB product provided the solution.

Sherwin-Williams High Performance Flooring

This foundry was previously known as the Leeds Copperworks and has played host to industrial breakthroughs, royal visits, and was the workplace of a 5,000 strong workforce before it closed in 1980. Preparation included diamond grinding and shotblasting. Solution Resuprime OT oil-tolerant primer was applied to prevent delamination. This was finished with two coats of Resucoat HB, a high-build, low odour, epoxy resin industrial floor coating for high impact and wear resistance. Outcome The site has been refurbished with buildings re-roofed and re-clad and a modern warehousing and distribution facility created.

Renovation - Glasscrete Floor

GEOCELL Foam Glass

At Speedwell Mill the existing damp concrete floor was dug up and excavated ready to install the breathable LABC registered Glasscrete (Limecrete) floor system. This was to prevent the old concrete floor from driving ground moisture to the perimeter walls causing damp issues.

4D Contract Flooring

Heckmondwike FB

Project was part of an office refurbishment, with the carpet installed throughout the general office space, breakout and meeting areas. Plank carpet tiles replicate the size and shape of contemporary planked flooring. Selected Array in Black and Broadrib in Graphite to complement 4D Contract Flooring’s corporate colours.

Renovation - Glasscrete Floor

GEOCELL Foam Glass

Grade 1 Listed stables in Ely built 13th C, remodelled 16th C with Victorian alterations. Stables unused for about 40 years with many props inserted after internal load bearing structures removed in error. Agreement with Conservation Officer and Historic England to retain the brick floor for posterity without any damage using new posts with spreader plates. With floor levels differing approx 100mm side to side, the GEOCELL foam glass gravel insulation layer made levelling & installation easy.

Headlam Flooring, Motherwell

HD Sharman Ltd.

The only BBA accredited commercial gutter lining product available in the UK. Specialist roofing company APS Safety Systems chose Sharman's Plygene Gutterline system as the permanent solution for the complex gutter lining work at Headlam Flooring’s offices in Scotland.

Showing 1-36 of 1205

Feedback