NBS Source
I'm a manufacturer
Boyco (UK) Ltd

Boyco (UK) Ltd

FF&E Design, Manufacture, Supply & Install | Tried & Trusted for Over 60 Years | Built To Last

+44 (0)161 428 7077 Website

Sort by:

Showing 1-14 of 14

Sponsored
Avanti Brook Primary School, Bishop’s Stortford

Avanti Brook Primary School, Bishop’s Stortford

Boyco (UK) Ltd

Through a collaborative effort with Ashe Construction, Team BOYCO successfully undertook the transformation of classroom areas.Project ScopeNestled in the heart of Bishop’s Stortford, Avanti Brook Primary School is dedicated to providing students with a holistic and challenging learning experience. Recognised for its commitment to educational excellence, the school endeavors to cultivate a nurturing learning environment. In pursuit of this commitment, Avanti Brook sought to enhance its classrooms.Through a collaborative effort with Ashe Construction, Team BOYCO successfully undertook the transformation of a classroom area, crafting a space that seamlessly blends comfort with functionality for the benefit of students. The BOYCO WayBackgroundThe furniture was crafted to cater to 30 students, featuring a lower split-level sink for accessibility. Storeroom shelving was also installed, increasing classroom storage space and provide teaching staff with the space to create an organised and efficient learning environment. This has allowed for quick access to learning materials, and teaching essentials that need to be kept close to hand.Our dedicated in-house design and project management teams collaborated closely with architects to grasp the specifics of the client's requirements, ensuring the final product seamlessly complemented the school's overall aesthetic.The selection of our bespoke Peg Rails, Benching, and Sink Areas were chosen due to the Primary Schools requirement for a practical, everyday solution. The ranges selected also provide comfort and functionality for pupils, making them perfect for the classroom environment.Following a joint approach between BOYCO's project management team and Ashe Construction, along with our competitive pricing, the project was successfully fitted and completed within a 2-week timeframe.Quality Bespoke ProductsThe spaces that house the Split Height sink area and Cloakroom Benches were anticipated to be frequently used by students, so it was important for us to place a high emphasis on both durability and hygiene.As per the BOYCO standard, our timber is twice coated with our anti-microbial lacquer designed to prevent the spread of 99% of known bacteria, contributing towards a clean and safe learning environment.Additionally, all our metal work is coated in our 'Hot Dip’ Nylon, offering an unparalleled abrasion resistance that surpasses powder-coated paint alternatives by 500X. This robust solution ensures a long-lasting and aesthetically pleasing product, contributing to the overall visuals of Avanti Brook Primary School. Project SuccessThis project with Ashe Construction resulted in the client expressing full satisfaction with the product, followed by positive feedback.Team BOYCO are proud to have contributed to the delivery of this excellent project and are thrilled to have transformed learning spaces for pupils at Avanti Brook.
Sponsored
Barrow Hall Primary School

Barrow Hall Primary School

Boyco (UK) Ltd

Boyco worked with Ellis Williams Architects in Warrington to design the ultimate coat & bag storage solution for Barrow Hall Primary School, ensuring maximum storage for each pupil. The contract was awarded to Robertson Construction, and Boyco worked with Robertson's to supply & install the equipment smoothly within the given timescales, to ensure a seamless delivery of the project.
Sponsored
Bridglea Pupil Referral Unit

Bridglea Pupil Referral Unit

Boyco (UK) Ltd

"Boyco did an exceptional job of meeting our unique requirements on this project, and it didn’t stop at the initial installation! Boyco’s installers were regularly on hand to find innovative solutions to unexpected problems arising in the challenging environment – in particular children trying to climb on top of the Teaching Walls. I am very impressed with Boyco’s products and service and would recommend them to anybody looking for a bespoke solution for challenging environments." - Diane Hallworth, Bridglea PRUCHALLENGES & SOLUTIONSOn arrival for the installation, Boyco installers found that steel dado trunking had been installed along the Classroom walls, and the electric sockets were mislocated which caused them to clash with the electric source needed for the Teaching Walls. Our installers carried out all necessary remedial work to align the Teaching wall electrical access points to the wrongly positioned sockets on the dado trunking.After successful installation of the Teaching Walls, we were informed by Bridglea PRU that children had been climbing up the side of the Teaching Walls by suspending themselves between the Teaching Wall and the classroom wall–in an attempt to get on top of the Teaching Walls and climb inside the cabinets. Boyco supplied & installed bespoke infill boxes to the corner of the necessary Teaching Walls, to prevent pupils being able to gain any access to the roof of the Teaching Walls.
Sponsored
Broadheath Primary School

Broadheath Primary School

Boyco (UK) Ltd

Boyco with Amey Consulting to design bespoke Classroom storage solutions for Broadheath Primary School. Boyco worked with Amey Consulting (in partnership with Trafford Council) to design bespoke Classroom storage solutions for Broadheath Primary School. Boyco took pleasure in collaborating with Amey on project designs and solutions for the project. The project was later awarded to Conlon Construction, and Boyco worked with Conlon to provide a quality turnkey installation. All those involved in the project were highly satisfied with the end result, and Boyco received extremely positive feedback.
Sponsored
Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Boyco (UK) Ltd

Boyco worked with Pozzoni Architecture to design a Heavy Duty benching solution, to stand up to the tough demands of the Cheadle Hulme school sports pavilion. Solid Grade laminate bench slats and peg rails were specified to offer maximum durability and weathering ability against the rough and tumble of constant use. Boyco is able to offer bespoke solutions on any project to match exact requirements. This contract was later awarded to HH Smith & Sons, and Boyco worked with HH Smith to smoothly meet the timescales and ensure a well-timed delivery on the project.
Sponsored
Hillside School

Hillside School

Boyco (UK) Ltd

We were commissioned to supply and install cloakroom fittings and a bespoke ‘classpack’ package for a four-classroom extension at Hillside School in the north-east of Scotland... all to seriously tight deadlines.Portlethen is one of Aberdeen’s fastest-growing commuter towns and, within two years of completion, the local primary school needed space for more pupils... quickly. What’s more, the four-classroom extension had to be completed while the existing school and nursery operated as normal.Boyco were approached to simply provide fixed furniture and equipment but, instead, proposed a fully managed, supply and installation service that would ease the pressure on main contractor Bancon Construction. Our end-to-end package included the design, manufacture and installation of a bespoke system of cloakroom fittings, teacher walls, kitchen units and height-adjustable worktops.Challenging lead times were made more difficult by the coronavirus pandemic and new construction site rules. However, we put together a plan of works for accelerated manufacture and installed the systems in just two weeks at the end of 2020. The extension was handed over to the client in January 2021.“It was satisfying that even in the midst of a global pandemic, the Council and its partners could work together to ensure the completion of the project,” said Cllr Gillian Owen, chair of Aberdeenshire Council’s Education and Children’s Services Committee.Throughout, we liaised directly with the architect and the end client, combining our skills and experience to provide a fully-managed service designed to take the pressure off the main contractor. “Hassle-free” was how they described it. The project contributed to a portfolio of successful supply-and-fit projects in Scotland. “I will be recommending that Bancon Construction use Boyco on future projects,” said site manager Colin Smith.The service from Boyco couldn’t be faulted - from the drawings and delivery schedule to the quality of fittings, and an installation team who worked diligently without fuss to get the work completed on time.Colin Smith, Site Manager, Bancon Construction
Sponsored
Investment bank project, Lockers

Investment bank project, Lockers

Boyco (UK) Ltd

Flagship project to supply and fit  ‘one-of-a-kind’ changing-room lockers for City headquarters as global bank invests in staff wellbeing.Boyco’s attention to detail, from design to installation, is delivering outstanding projects  for local clients... and prestigious brands. We enhanced our reputation for product quality, function and efficient installation on a flagship project to supply and fit bespoke changing-room lockers for a global bank HQ in central London.“We were very impressed with the  Boyco team. They kept to their  schedule and their site operatives  were able to overcome any issues,  and get the job done efficiently  and safely. Highly recommended.” Philip Kyriacou, Senior Project Manager, BW: Workplace Experts.Boyco were commissioned to supply and ft a bespoke locker system for the ‘wet and dry’ changing rooms – but not before going through a detailed process to understand the needs of the client and their employees.The solution was based around our two-compartment ‘Z’ locker system – an ingenious design that separates wet/dry or clean/dirty clothes, but provides long hanging space for both. Boyco’s renowned attention to detail covered everything from the locking mechanism to the hinges and foor plinths. But for this project, style was as important as function – and we liaised with the client and aluminium sheet suppliers to ensure a range of vibrant colours to create a welcoming environment for staff. Timescales were just as tight as the access for the central London location – but we delivered on time, in full.“At Boyco, it’s all about relationships and reputation, and we’re extremely proud to have been involved in this stunning project for such a prestigious client,” said Boyco managing director Damien Boyt.
Sponsored
Kendal College, Cumbria

Kendal College, Cumbria

Boyco (UK) Ltd

Collaborating with John Turner Construction, Team BOYCO was approached to transform Kendal College’s newly built T-Level Construction Block with our fixed furniture solutions, with the customer requesting Worktops, Cupboards, and Shelving.Project ScopeLocated on the outskirts of the Lake District, Kendal College focuses on its ethos of 'Creating Bright Futures'. Offering a variety of courses, from A-Level to Degree, to a range of ages they sought to enhance their classroom space and create a practical yet comfortable learning environment. The BOYCO Way BackgroundA requirement from the client was for the product to be manufactured and installed as whole package something which BOYCO, with our own British Factory and expert installation team, was readily available to provide.Due to tools being frequently used as part of the learning experience and construction curriculum; it was important for the worktops in the T-Level block to be robust and able to withstand repeat impact.Due to this, our in-house team of designers opted to use Econo-Top worktops. Suitable for workstations, the material boasts optimal scratch and wear resistance; perfect for the construction-focused classroom, and therefore a great choice for the customer.Merinolam FR+ Laminate Sheet, in the style of ‘Castle Concrete’, was used on the exterior of the worktop after our sales team provided samples of different options to the contractor, to support with final design decisions. Not only did this add to the durability due to its phenolic resin coating which creates flame retardant properties, but it was cost-effective and provided a clean aesthetic finish to the classroom worktops. Quality Bespoke Products5 Tier adjustable shelving was installed within the Construction Block Storerooms. As per the BOYCO standard, all our metal work has been processed with our ‘Hot Dip’ Nylon coating. 500x abrasion-resistant than the next powdered coating alternative, it is easily able to withstand daily usage by the students for many years to come. This is particularly vital in a construction learning environment, where heavy and sharp tools are frequently used, therefore reflecting BOYCO’s ‘Built to Last’ exceptional quality.Our ‘Hot Dip’ Nylon also contains Anti-Microbial properties. Formulated to stop bacteria from surviving on its surface, it prevents the spread of 99% of all known bacteria. Beneficial to Kendal College, it contributes to the health and well-being of all in the classroom and complies with school safety standards.In addition to the adjustable shelving, fixed Wall Cupboards were installed in the Workshops. This storage solution ensures that students have easy access to the materials and items that they need to keep close to hand whilst working on the worktops below. The multiple storage areas help to keep the Workshop environments tidy due to equipment being organised behind the cupboard doors.Whilst completing the works on site at the College, we were notified that underfloor heating was present in the areas that BOYCO were due to fit out. We were quick to work closely with John Turner Construction to provide a solution to ensure that this wouldn’t impact the design and install. This was not a problem for us, as with over 60 years of heritage in the manufacturing business, we overcame this obstacle by utilising suitable shallow screws and fixings to avoid puncturing the structure underneath. Project SuccessThroughout the project, from design to install, Team BOYCO visited the site to ensure exceptional standards were delivered at each and every project touchpoint.Joining forces with John Turner Construction, we worked meticulously to ensure Kendal College’s requests were met. This resulted in the construction block being finished to an impeccable standard.Creating a fantastic end result, BOYCO is super proud to have worked on this project and to have positively contributed to the learning environment of future construction industry workers.
Sponsored
North Chadderton High School, Oldham

North Chadderton High School, Oldham

Boyco (UK) Ltd

Working with Kier Construction, BOYCO successfully transformed this secondary school's changing room spaces.Project ScopeNorth Chadderton School in Oldham, is renowned for providing a supportive, and creative learning environment. The school was challenged with needing to create additional space for students, sparking a new construction project.Team BOYCO proudly worked with Kier Construction, to help transform the newly developed learning spaces at the secondary school. Part of the Oak Trust, BOYCO supported the school’s expansion project with the design, manufacture and install of a range of changing and cloakroom furniture.The BOYCO WayBespoke DesignTeam BOYCO’s in-house design and project management teams worked closely with the Architects drawings, designers at Kier Construction, to gain a comprehensive understanding of the task at hand. We collaborated closely to create designs that showcased a range of BOYCO’s market-leading changing and cloakroom furniture that seamlessly integrated with the school's aesthetic.Our Peg Rails, Island Bench Units, and Wall Fixed Bench units were carefully chosen to maximise space, whilst meeting the practical needs of both students and staff.Quality ManufacturingFrom our factory in Greater Manchester, we ensured that every piece of furniture was crafted with precision using high-quality materials. The durability of the furniture was a key consideration to withstand the daily demands of a bustling school environment.A bespoke requirement from North Chadderton, was that Oak timber was used. This was a symbolic request from the Secondary School, as they wanted showcase being part of the Oak Trust.BOYCO also acknowledged that the cloakroom furniture would be a frequently used, with placement in a high touch point communal area.Therefore, as per all BOYCO timber, the Oak is coated with anti-microbial lacquer which is formulated to stop bacteria from surviving on the surface – preventing the spread of 99% of known bacteria. This is a suitable fit as it supports a clean and safe learning environment.All metalwork to the Benches, Units, and Peg Rails are coated with our unique ‘Hot Dip’ nylon. This also provides anti-microbial protection and is 500x more abrasion resistant than the next powder coating, a great match for the school’s changing room.Expert FittingBOYCO provided a full fit out service to complete this project. Our expert team of fitters worked to exceed expectations and meet tight timescales, completing the full fit out of all spaces during the schools Christmas Holidays. This ensured that the new learning spaces were ready for when students returned in the New Year.Project Success99% satisfaction score from Chris Gregory, Project Manager at Kier Construction.
Sponsored
Olga Primary School

Olga Primary School

Boyco (UK) Ltd

"The quality of the teaching walls is excellent, they are very robust. The teachers are really impressed with the functionality, the storage and what they can do with the teaching walls and overall it’s thumbs ups. The reaction of the teachers and pupils was one of ‘it’s really well designed, the colour scheme is really good, it matches the room, the storage is much more that you would think against just one wall of the classroom. We definitely want to use the Boyco range again." - Hasib Hikmat, Business Manager, Olga Primary School
Sponsored
Royal Oldham Hospital

Royal Oldham Hospital

Boyco (UK) Ltd

BOYCO recently undertook works at Royal Oldham hospital to support F Parkinson with a range of works, including the transformation of hospital storage areas. We provided a range of fixed furniture solutions to enhance this healthcare space.Project ScopePart of our own home turf in Greater Manchester, the Royal Oldham Hospital, Oldham undertook a renovation and build project. As part of this, there arose a requirement for storage suitable for medical equipment and daily use in the major trauma unit. The BOYCO WayBackgroundWR5 racking with a 16mm SGL base was selected following drawings issued against the architects’ designs and in correspondence with F Parkinson. It was vital to Royal Oldham Hospital that the surface were wear and tear resistant and would withstand impact, whilst being easy to clean to ensure high standard hospital hygiene requirements could be met.Adhering to the premium standard of all BOYCO metal work, the steel frame for the shelves underwent our ‘Hot Dip’ Nylon coating process. This offers unrivalled abrasion resistance, 500x more than the next leading powder coating, ensuring that the racking was durable, able to withstand daily use in the busy hospital environment, and "Built to Last" in line with BOYCO values.BOYCO’s unique “Hot Dip Nylon”, was a perfect match for Royal Oldham, due to its ability to stop bacteria surviving on its surface, therefore preventing the spread of 99% of all known bacteria.Crafted to endure challenging environments, our racks also incorporate an easy-lift solution for efficient cleaning practices and a 'sealed system’, meticulously designed without holes or slots to uphold the highest standards of medical hygiene.Providing Excellent ServiceMade to the clients’ bespoke order, our committed in-house design and project management team opted for SGL due to the products composition of both the superiority of our Hot Dip Nylon coating and easy to clean surfaces.The products swift installation adaptability was also a crucial consideration during this project, given the time constraints within the hospital environment and working around a live site. Team BOYCO worked closely with F Parkinson to ensure minimal disruption.To further support F Parkinson and the projects lead times, BOYCO stored the product off-site, and communicated closely to ensure that delivery was arranged to cater to the needs of time constraints.Precautions were in place to ensure that BOYCO’s installers adhered to health and safety requirements. Being mindful of COVID, all installers and site visitors wore PPE in line with hospital guidance to protect patients, hospital staff, site staff, and members of the public. Project SuccessThis project with F Parkinson led to the client expressing satisfaction and providing excellent feedback regarding the end result.As part of the Greater Manchester community, Team BOYCO are pleased to have supplied this fantastic project and provided storage solution for Medical Professionals at Royal Oldham Hospital.
Sponsored
Verulam School

Verulam School

Boyco (UK) Ltd

When a major blaze swept through the sports pavilion at Verulam School in St. Albans, only one thing was left standing in the changing rooms - the Boyco fittings. Even after the roof had fallen in and flames had gutted the changing block, the Boyco benches and peg rails were still firmly in place. The suspected arson attack at the Sandy Pit Lane site caused extensive damage and the entire pavilion needed rebuilding. As a fire fighter at the scene explained "The pavilion was made of wood and concrete with a tar and bitumen roof so it was pretty flammable".Rebuilding the pavilion had to begin straight away to restore full sports facilities to the school. Boyco was asked to join architects Mouchel on the team tasked with building and fitting out new changing rooms – nine years after they designed and supplied the original fittings. Boyco and Mouchel already had a proven partnership having worked together on numerous projects in the past. The timescale was tight. The Boyco team had just a month to present full proposals and design and manufacture the fittings. The team’s made-to-measure design – a replication of the original one - incorporated benches with integral peg rails and shoe trays. The steel fittings were coated in-house at the Boyco factory using the company’s renowned ‘Hot-dip’ nylon technique, exclusive in this sector to Boyco. The coating, derived from 100% renewable castor oil, is four times thicker than other powder coatings and gives fittings superior durability and performance. ‘Hot-dip’ coated fittings offer astonishing resistance to damage, abrasion and, as Verulam School proved, fire. The surface is also exceptionally hygienic with anti-microbial power that reduces bacteria by 99.99%. For added visual impact, ‘Hot-dip’ designs come in wide range of colours. Timber parts of the fittings also bring together superb performance with impressive environmental credentials. Water-borne timber lacquers provide a high quality finish on our standard American White Ash which are non-toxic, anti-microbial and non-flammable. All timbers are sourced from sustainable, fully approved forests. 
Sponsored
Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

Boyco (UK) Ltd

Boyco were commissioned to supply and install cloakroom fittings and Waterfall® anti-drip worktops for a two-classroom extension at Bro Alun primary school in North Wales. The results are impressive.“The architect had never used us before, but was keen to specify our products, which was very pleasing,” said Boyco Regional Manager Kevin Bond, explaining the background to our project to supply and fit coat hooks and bag trays, and anti-drip worktops for a two-classroom extension at Ysgol Bro Alun in Gwersyllt.The made-to-measure cloakroom fittings were fully assembled when delivered, meaning less time spent on site for installation. They were available in the school’s colours and came with a lifetime guarantee, as well as having an anti-microbial finish.The project took just four months from initial enquiry to handover. As well as the architect’s own research, our early collaboration with stakeholders (including the school headmaster) to discuss the project and review samples helped avoid potential issues.The initial site survey also identified opportunities for Boyco to add value, based on our considerable experience and deep understanding of the education sector. Initially tasked with supplying our Waterfall® laminate worktops, which have a ‘bull-nosed’ edge to prevent spills and drips, we proposed incorporating a handwash basin into the scope of works to avoid potentially expensive design changes and/or retrofittingSince the successful completion of the project, Boyco have been added to Read Construction’s approved supplier list.I was really impressed with the scheme and the furniture installed. Read Construction also said how positive it was working with Boyco.Lawray Architects
Sponsored
Ysgol Uwchradd Aberteifi, Cardigan

Ysgol Uwchradd Aberteifi, Cardigan

Boyco (UK) Ltd

In collaboration with Wynne Construction, BOYCO assisted in renewing Ysgol Uwchradd Aberteifi’s facilities including their classrooms, drama studio, IT suites, and science labs. We provided several bespoke fittings, tailored to fulfil the needs of this Secondary school community.Project ScopeSituated near Afon Teifi, Ysgol Uwchradd Aberteifi, (Cardigan School), fosters the motto of ‘every pupil will succeed’. Affirming this statement, the school worked closely with local authorities to initiate the refurbishment of current facilities, and a new build part of the school. The BOYCO Way BackgroundThe goal of the project was to increase the capacity of the school, due to it catering for pupils from Secondary to Sixth Form level. The newly developed learning environments were designed with enough space for staff to teach and support the development of pupils.We worked closely with both our supply chain partners, and Wynne Construction to ensure the running of the project went as smoothly as possible.To support overall sustainability and social value efforts, and to align with our values, we sourced fitters as well as materials local to the project site. This ensured a streamlined installation process for our customer and showcased our commitment to supporting local businesses and the communities that surround our project sites.Fitting to the school’s aesthetic, our in-house designers, in collaboration with architects, worked meticulously to craft products that looked visually appealing and balanced comfort with functionality, adapting to different subject needs and classroom environments.This ranged from the Drama Studio requiring a Teacher Wall to provide an interactive focal point for classroom activities, to Science Lab Worktops robust enough to withstand daily usage by students. Quality Bespoke ProductsIT SuiteCatering for over 650 students, Ysgol Uwchradd Aberteifi requested that we placed a high emphasis on space saving, and making classroom space usable to the full extent.For the IT Suites, we implemented 'Sawtooth Benching’. This layout angles towards the front of the classroom, providing an ergonomic and optimal view for students, reducing strain. This creates a more comfortable environment for students working on screens.Incorporating this forward slant allows students to effortlessly turn to each other, creating a collaborative environment that positively enriches their learning experience.Considering practicality in daily school life, the benching was designed to facilitate cable management, with dividers positioned in the middle of the table to keep the workspaces tidy and organised. This adds safety for those that use the IT Suites. Science LabWhen designing the Science Laboratories, special considerations were made regarding the worktop surfaces. Due to potential exposure to various chemicals, liquids, and heat, the material needed to be suitable for heavy-duty use and therefore a long-lasting solution was selected. Solid Grade Laminate (SGL) worktops were utilised due to their heavy-duty scratch and wear resistance, impact resistance, and ease of cleaning.A solid material with smooth machinability, it has hydrophobic properties preventing dampness, something traditional tabletops cannot provide. Perfect for bespoke fittings, it was tailored to the specific needs of the customer, whilst also providing an optimal surface finish. For Ysgol Uwchradd Aberteifi, this created an aesthetically pleasing environment whilst positively contributing to student safety.Following the theme of utilising space, the depths of the worktops were adjusted by BOYCO to align with side walls enabling greater aisle space between the Lab Benching. Enhancing manoeuvrability within the Lab reduces the risk of accidental collisions or spills, and facilitates ease of equipment sharing, contributing to a cooperative learning space. Staff RoomIn conjunction with ensuring an amazing space for students, this project also placed staff spaces at the forefront of works. The staff break out room was renovated to emulate a relaxing, resting space. As per the School's requirement to utilise all space, our in-house designers crafted a Tea Point fixture for Teachers and Visitors to access refreshments.An Econotop Worktop was favoured with its laminate coating, achieving an easy clean surface perfect for food and drink preparation. Customisable by colour, Oak Laminate doors were added alongside the worktop, enhancing the finished structure, and fitting with Ysgol Uwchradd Aberteifi’s bespoke requests. Project SuccessTeam BOYCO successfully completed a full design, manufacture, supply and install service for this project. Our teams visited the site often throughout the project, ensuring that each element of the works exceeded expectations of all those involved and aligned with our ‘Built to Last’ ethos.We are proud to have worked with Wynne Construction on this refurbishment. We look forward to continuing our ongoing relationship and can’t wait to get started on our next project.

Showing 1-14 of 14