NBS Source
I'm a manufacturer

North Chadderton High School, Oldham

OVERVIEW

Working with Kier Construction, BOYCO successfully transformed this secondary school's changing room spaces.


Project Scope


North Chadderton School in Oldham, is renowned for providing a supportive, and creative learning environment. The school was challenged with needing to create additional space for students, sparking a new construction project.


Team BOYCO proudly worked with Kier Construction, to help transform the newly developed learning spaces at the secondary school. Part of the Oak Trust, BOYCO supported the school’s expansion project with the design, manufacture and install of a range of changing and cloakroom furniture.


The BOYCO Way


Bespoke Design


Team BOYCO’s in-house design and project management teams worked closely with the Architects drawings, designers at Kier Construction, to gain a comprehensive understanding of the task at hand. We collaborated closely to create designs that showcased a range of BOYCO’s market-leading changing and cloakroom furniture that seamlessly integrated with the school's aesthetic.


Our Peg Rails, Island Bench Units, and Wall Fixed Bench units were carefully chosen to maximise space, whilst meeting the practical needs of both students and staff.

Quality Manufacturing


From our factory in Greater Manchester, we ensured that every piece of furniture was crafted with precision using high-quality materials. The durability of the furniture was a key consideration to withstand the daily demands of a bustling school environment.


A bespoke requirement from North Chadderton, was that Oak timber was used. This was a symbolic request from the Secondary School, as they wanted showcase being part of the Oak Trust.


BOYCO also acknowledged that the cloakroom furniture would be a frequently used, with placement in a high touch point communal area.


Therefore, as per all BOYCO timber, the Oak is coated with anti-microbial lacquer which is formulated to stop bacteria from surviving on the surface – preventing the spread of 99% of known bacteria. This is a suitable fit as it supports a clean and safe learning environment.


All metalwork to the Benches, Units, and Peg Rails are coated with our unique ‘Hot Dip’ nylon. This also provides anti-microbial protection and is 500x more abrasion resistant than the next powder coating, a great match for the school’s changing room.


Expert Fitting


BOYCO provided a full fit out service to complete this project. Our expert team of fitters worked to exceed expectations and meet tight timescales, completing the full fit out of all spaces during the schools Christmas Holidays. This ensured that the new learning spaces were ready for when students returned in the New Year.


Project Success


99% satisfaction score from Chris Gregory, Project Manager at Kier Construction.

Products featured in this case study

View all products (44)
WB Peg Rail - Coat clothes hook rail/ peg rail.

WB Peg Rail - Coat clothes hook rail/ peg rail.

More case studies from Boyco (UK) Ltd

View all case studies (14)
Investment bank project, Lockers

Investment bank project, Lockers

Hillside School

Hillside School

Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

More case studies from Clothes rails

View all case studies (7)
Cheadle Hulme Sports Pavilion

Cheadle Hulme Sports Pavilion

Ysgol Bro Alun, Gwersyllt

Ysgol Bro Alun, Gwersyllt

Barrow Hall Primary School

Barrow Hall Primary School

Verulam School

Verulam School