NBS Source
I'm a manufacturer

Robust Expansion Joint Cover Helps Transform Refurbished Shopping Centre

OVERVIEW

Popular shopping centre The Mall Maidstone recently underwent a £6 million refurbishment that was completed in 5 months and took place mostly during the night. Some of the work carried out included smarter strip lighting which changes according to the weather, white porcelain flooring, and enlarged shop fronts. CS provided them with GTP-300 HD expansion joint covers. This is a strong, recess mounted, and flush floor cover that is perfect for this type of application with persistent traffic over the joint. This durable joint cover will allow traffic in the shopping centre to move safely for years to come.

Products featured in this case study

View all products (140)
CS Allway® DGTP-HD and GTP-HD Series Heavy Duty Floor Joint Covers - Dual Gasket - Heavy-duty Recess-mounted Floor Covers

CS Allway® DGTP-HD and GTP-HD Series Heavy Duty Floor Joint Covers - Dual Gasket - Heavy-duty Recess-mounted Floor Covers

More inspiration from Construction Specialties (UK) Ltd

View inspiration
Bespoke wall protection at the Royal Bournemouth Hospital

Bespoke wall protection at the Royal Bournemouth Hospital

Elegant Entrance Matting at Glasgow’s The Garment Factory

Elegant Entrance Matting at Glasgow’s The Garment Factory

Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

High-Quality Entrance Matting Featured at New London Apartment Building

High-Quality Entrance Matting Featured at New London Apartment Building

More inspiration from Strip movement joints

View inspiration
Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment

Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide,  High Movement, Structural  Movement Joints

Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide, High Movement, Structural Movement Joints

Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory

Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory