Emshield DFR-2 has been used to successfully sealing & ensuring 2-Hour Fire Resistance, in the more than >100 mm Wide, High Movement, Structural Floor Joints in the Battersea Power Station Redevelopment

OVERVIEW

Client: Battersea Power Station Development Company Consultants: WilkinsonEyre Architects, Turner and Townsend, Buro Happold, Purcell

Main Contractor: Mace

Specialist Fire Contractor: Roseville Projects Ltd

Main Products Used: Emshield DFR2 for Floor Joints


Leading Architect Sir Giles Gilbert Scott, who was also responsible for Britain’s red telephone boxes, designed the iconic Battersea Power Station on the banks of the River Thames back in 1929 and elevated what was a functional building to an Art Deco masterpiece. For its new incarnation, the lead architects Wilkinson Eyre and their partners, approached the redevelopment with homage to its history, by retaining and enhancing its place in the London Skyline, and adding 21st-century sustainability and sensibility for its new functional life as a great place to live, work and play, in the heart of the city. The new building structures were designed with 20 to 50mm wide structural expansion joints between floor slabs to accommodate the high levels of thermal movement anticipated, as well as the vibrations from traffic and other loadings. This required the joints to allow +/- 10mm movement, effectively +/- 20 to 50%, meaning a total joint movement capability of 40 to 100%, plus the joints also had to prevent noise transmission and provide a minimum of 2-hours fire resistance. These stringent demands are why the consultants selected the Emshield DFR-2 System, as it could easily meet all these requirements. In fact Emshield DFR-2 can accommodate more than 100% joint movement capability and is now uniquely CE Marked to EN-1366-4, confirming fire resistance for up to 4 hours, the effective maximum test level.

Products featured in this case study

View all products (6)
Fire Resistant Floor & Wall Movement Joints - Emshield DFR / WFR CE

Fire Resistant Floor & Wall Movement Joints - Emshield DFR / WFR CE

More case studies from NCC – Emseal Movement Joints

View all case studies (18)
Emseal Colorseal seals joints between precast façade panels at the Broadway Redevelopment In London

Emseal Colorseal seals joints between precast façade panels at the Broadway Redevelopment In London

Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester

Emseal SJS System to Seal Ramp Joints at Trafford House Car Park, Old Trafford, Manchester

Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at
Staines in Middlesex

Emseal SJS System solves leaking deck expansion joint problems for the Elmsleigh Shopping Centre at Staines in Middlesex

Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester

Emseal SJS Selected for Wide Deck Joints at Manchester Airport T-2 Multi-Storey Car Park, Manchester

More case studies from Strip movement joints

View all case studies (4)
Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR-2 Seals Wide (100mm +), High Movement (+/- 50%), Fire Resistant (min 2hrs), Structural Deck & Floor Movement Joints at the Wood Wharf Development in London

Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide,  High Movement, Structural  Movement Joints

Emshield DFR/WFR - CE has been specified and successfully installed on the Castle View Development in Bristol - Successfully Sealing and providing increased Fire Resistance to the Wide, High Movement, Structural Movement Joints

Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory

Emseal Acoustic & Thermal Movement Joint Sealing for the New Aviva Studios, Manchester - The Factory