Project Description


The capital of Austria, Vienna, is home to one of the country's most powerful structures: The parliament building from the 19th century comprises the seat of the two chambers of parliament, the National Council as well as the Federal Council of the Republic of Austria.


As part of the general renovation of the historic building complex on Vienna's Ringstrasse, Lindner GmbH was involved in the construction project with numerous products and services. In addition to the repair of 

damage to the building fabric, the main objective was the general  modernization of the property within the framework of the preservation of historical monuments. The combination of Lindner's modern hollow floor 

system FLOOR and more® and the historic overlay therefore met all the requirements. In order to continue to preserve the classic look of the wall and ceiling surfaces, the entire building services were installed in the access floor - completely in line with the maxim of sustainability.


Completed Works:


Floors:


  • Calcium sulphate panels                   9300 sqm

         - FLOOR and more® comfort         11000 sqm

         - FLOOR and more®


  • Cement fibre panels:                        410 sqm  

         - HYDRO comfort


Ceilings:

  • Heated and Chilled Plasterboard Ceilings

-Plafotherm® GK HEKDA®


Insulation Engineering

No featured products in this case study

Contact Lindner Group by clicking the button below to find out which products were used in this case study.

More case studies from Lindner Group

View all case studies (13)
Projektreport Allerhuset Denmark

Projektreport Allerhuset Denmark

Maxwell Centre, University of Cambridge

Maxwell Centre, University of Cambridge

John Lewis Oxford Street

John Lewis Oxford Street

MOL CAMPUS

MOL CAMPUS