OVERVIEW
In cooperation with local partner L-Group, Lindner was responsible for the production and installation of the flooring systems: a total of almost 22,000 m² of the FLOOR and more® G30 and FLOOR and more® G40 hollow floor systems were installed.
Despite its low weight, the dry hollow floor impresses with excellent properties in terms of load-bearing capacity, acoustics, fire protection and sustainability.
For the server rooms of the administration building, particularly high demands were placed on the floor: Lindner NORTEC G38 ST and VENTEC S38 R38 raised floors were used here ‒ the extremely stable raised floor panels provide the necessary ventilation via the cavity.
Calcium sulphate raised access floor - NORTEC
Lindner Raised Floor Pedestals Type SWH120
Lindner Raised Floor Pedestals Type S
Lindner Hollow Floor Pedestal Type P
Lindner FLOOR and more® G 40 x L/D
Lindner Hollow Floor Pedestals Type L
NORTEC U 34 ST x H - Calcium Sulphate
Projektreport Allerhuset Denmark
Maxwell Centre, University of Cambridge
John Lewis Oxford Street
Wembley Stadium
Gresham Apartments, Raised Acoustic Floor - Nottingham UK
SubFloor Acoustic Raised Floor, Renovating 12 Apartments in Nottingham
Transforming a Listed Museum Near Liverpool into a modern Meeting Space using SubFloor
Transforming an Attic into an Energy-Efficient Storage Space in South Wales with SubFloor Raised Flooring
The Cube
Birmingham Library
The Shard
HAUSER CB - Metal Ceilings, LIGNA and NORTEC raised floors
Nova N2 Development - London - Modular Washrooms
MOL campus - Floor and more G40 and NORTEC
INTERNATIONAL RUGBY EXPERIENCE -> FLOOR and more®
Global Tower - Raised floor systems, Heated and chilled metal ceilings, Partitions