NBS Source
I'm a manufacturer
Lindner Group

Lindner Group

Building New Solutions

02082466333 Website

Sort by:

Showing 1-12 of 12

Sponsored
70 ST MARY AXE

70 ST MARY AXE

Lindner Group

60-70 St Mary Axe is an office building designed by London-based architectural firm Foggo Associates with retail space on the ground floor. It is located in thearchitecturally ultra-modern financial district of the City of London in close proximity to the iconic 30 St Mary Axe, also known as "The Gherkin," whose facade was realized byLindner. Also, the new building is nicknamed: "The Can of Ham" in its semi-elliptical shape reminiscent of the packaging of English canned ham. The 360° view through the vaulted, all-glass façade offers a great view of the city of London. The BREEAM Excellent building offers 28,000 m² of office space, spread over 21 floors and designedto meet a wide variety of needs.Lindner Interiors contributed to the construction with interior fit-out products. These include the suspended ceilings for the "A" category office rooms on the 3rd, 9th and 12th floors, and the luminous ceilings at the reception and in all elevator anterooms.The Lindner fire grid ceiling system LMD-B 100 with linear grid arrangement was installed on two floors, while on the third floor, light strip modules were chosen instead.These complete the appearance of the iconic building in an impressive way. If required, LMD-B 100 partitions can be attached to the Lindner ceiling system so that the office space can be individually divided. With its radiant fire grids and trapezoidal ceiling tiles, the system is perfect for the sweeping silhouette of the 60-70 St Mary Axe building.
Sponsored
Friedrichscarrée ( FCS ) - Stuttgart, Germany

Friedrichscarrée ( FCS ) - Stuttgart, Germany

Lindner Group

The Friedrichscarrée is a modern office and retail complex in the center of Stuttgart.Named after the former king of Württemberg, Friedrich I., it is characterised by its modern architecture and glass front. In addition to numerous companies, it now also hosts retail, catering businesses and event spaces. The good access to public transportation and the close proximity to restaurants and cultural institutions, make Friedrichscarrée an attractive location for businesses and visitors.As the general contractor for the expansion, Lindner carried out an extensive interior construction - ranging from drywall work to floor systems and wall cladding. In addition to high-quality floor coverings and also partly automated partition walls, the special construction of the hollow floor FLOOR and more® for the pedestal in the barista bar was a central element of the revitalisation. Lindner hallway ceilings LMD, heating and cooling ceilings and acoustic sails were also installed to optimise room acoustics.Furthermore, GiB mbH supported Lindner in upgrading the existing fire protection. The entire conversion was carried out during ongoing business, which required precisescheduling of noise-intensive work.
Sponsored
Global Tower

Global Tower

Lindner Group

The Global Tower in Frankfurt am Main is a revitalisation of the former Commerzbank tower built in 1972. In addition to high requirements for building conservation, particularly the preservation of the heritage-protected facade, the focus was primarily on implementing a modern, innovative office concept with state-of-the-art equipment. On 30 floors, the office tower offers numerous lounge and work areas with flexible design options thanks to modern wall installation system partition walls.During the core renovation of the Frankfurt office tower, the Lindner Group was entrusted with the complete basic fit-out and one of the tenant fit-outs. In addition tocarrying out various drywall works, high quality raised floors and energy-efficient heated and chilled ceilings were installed in combination with lighting systems fromLindner. High-quality wooden doors from Lindner’s own production, related joinery work, as well as flexible system glass partitions complete the construction package. Lindner also carried out plastering and painting work as well as tile, coating and flooring work, and additional installation services.Despite numerous challenges such as (heritage-protected) construction in existing buildings and the high logistical effort involved, the vision of a modern office tower wassuccessfully realized. Thanks to sustainable construction systems and building services combined with effective thermal insulation measures, the Global Tower is set tobe awarded with the DGNB Platinum certification.
Sponsored
HAUSER CB

HAUSER CB

Lindner Group

HAUSER is a traditional supplier of turnkey refrigeration systems, for example in the form of refrigerated shelves, counters and freezer cabinets. Besides its headquarters inLinz, Austria, the company also operates a plant in Budweis, Czech Republic. An office building was equipped with ceiling and floor systems from Lindner. In cooperation with the local partner Konstruktis Delta s. r. o., Lindner Plafotherm® DS 320 Type 1 metal ceilings with integrated heating and cooling functions were supplied. With regard to the floor systems, LIGNA and NORTEC raised floors were used.
Sponsored
INTERNATIONAL RUGBY EXPERIENCE

INTERNATIONAL RUGBY EXPERIENCE

Lindner Group

The International Rugby Experience in the Georgian Quarter in Limerick, which is in honour of the worldwide game of Rugby, combines culture with pleasure and is a real visitor experience. It was particularly important to the architects and builders that thebuilding fits perfectly into the traditional cityscape: To guarantee authenticity, historical town houses in the traditional Georgian style were studied in advance. The architectural style was implemented in detail, using brick and concrete elements in the interior and exterior of the building.Lindner Group won its first major hollow floor project in Ireland with the contract for this floor trade. In collaboration with the architects from Níall McLaughlin Architects and the Irish business partner Cableplan, Lindner supplied the FLOOR and more® G40hollow floor. The special feature is the clinker bricks, typical of the Georgian style, which were laid on the floor system using a special laying method. Lindner also implemented access hatches in the floor for quick access and easy maintenance. Upon the architect's request, these flooring had a Satin Brush Finishing.
Sponsored
John Lewis Oxford Street

John Lewis Oxford Street

Lindner Group

Oxford Street is known as London´s most popular shopping street and as one of the most important in Europe in regard of turnover. A fitting place for the flagship store of John Lewis, a major chain of high-end department stores operating throughout the United Kingdom. The John Lewis Oxford Street offers an excellent assortment of household products and clothing as well as several restaurants in a seven-storey building.Lindner Interiors Ltd. was contracted with the supply and installation of a custom hook-on ceiling for the exterior walkway around the shop. The high-gloss surface of type TOUCHdesign Lunar made of hammered stainless steel gives a three-dimensional character, creating a fragmented image of colours and shapes of the building and the passengers.
Sponsored
Maxwell Centre, University of Cambridge

Maxwell Centre, University of Cambridge

Lindner Group

The Maxwell Centre at the University of Cambridge is a centrepiece building created to pioneer revolutionary “blue skies” research and industrial partnership in the physical sciences. The building named after physicist James Clerk Maxwell will offer laboratory and meeting spaces for more than 230 people. Lindner installed a customised LMD-St expanded metal canopy ceiling with a bronze PPC finish.
Sponsored
MOL CAMPUS

MOL CAMPUS

Lindner Group

The Lindner Group took on a key role in the construction of the MOL Campus. Around 33,000 m² of the FLOOR and more® G40 hollow floor was installed in the high-rise building. The entire system complies with the REI 60 fire protection requirements andcan therefore withstand a potential fire for a full 60 minutes, which makes a huge difference in an emergency. In addition, Lindner installed around 1,200 m² of NORTEC control room systems for the server rooms. The implementation of the project requiredextremely precise coordination on site, especially in close cooperation with electricians and other trades. In addition, there was a particularly tight schedule: At times, up to 2,500 m² of floor were delivered per week. However, with excellent teamwork, these challenges were quickly overcome and the project was completedwithin a very short time.
Sponsored
OFFICE BUILDING YAASA

OFFICE BUILDING YAASA

Lindner Group

Yaasa Ltd. has established itself as a leading force in the online sale of ergonomically adjustable office furniture. With the expansion of its headquarters in Lannach, the company is creating not only space for innovation and product development but also new, accessible workplaces for up to 50 employees. The building, which was constructed in a strict economical manner, meets the European targets for a “Nearly Zero Emission Building". Thus, Yaasa demonstrates its commitment to sustainability and, with its own showroom, offers customers the opportunity to experience products firsthand. Lindner played a key role in the sustainable interior fit-out of the new company building: By using raised floors made from recycled wood panels, Lindner demonstrates how resource conservation and sustainability in the construction industry can also be put into practice. The wooden floors have the same physical and technical properties as a new flooring system – without compromising the special quality of the working environment. The texture of the wooden floor contributes to a pleasant atmosphere and completes the overall result of homely workspaces.
Sponsored
Pole d'Echange Serra

Pole d'Echange Serra

Lindner Group

The Pôle d`Échange Serra is located directly opposite the Luxexpo exhibition and congress centre in Kirchberg, Luxembourg. The area combines a new bus terminal regional buses and city buses, a Park & Ride car park with around 600 parking spaces and two office buildings with a total area of approx. 8,000 m². With the help of charging points for electric cars, a small kiosk and high security measures at the bus station, the project aims to make the switch from car to public transport more attractive. Lindner Group was involved in the development of the office space. The originalcontract covered the floor and partition trades, including the installation of the NORTEC raised floor with fitted carpet and the use of timber and glass partitions. These were complemented by matching door systems and wooden wall claddings. Due to thecustomer's high level of satisfaction with Lindner's services, the order was quickly extended during the interior fit-out work: As a result, Lindner realised impressive Ecophon acoustic baffles for the meeting rooms. In addition, mobile partition walls should now find their way into the 4th and 7th floors. The room height of over 5 m on the 7th floor made the installation challenging: However, thanks to the static design and subsequent execution of a steel construction clad with plaster, the connection of the 4m high partition wall could be carried out without any problems. Another highlight of the interior fit-out are the wall absorbers in the meeting rooms, which also serve as acoustic pictures. The perforated CPL panel was created in cooperation with Topakustik using a new production method. The perforation pattern corresponds to a Morse code, which stands for the Luxembourg national anthem.
Sponsored
Projektreport Allerhuset Denmark

Projektreport Allerhuset Denmark

Lindner Group

The new office building is groundbreaking in terms of its holistic approach in Denmark. Lindner provided a complete interior fit-out solution consisting of ceiling systems, floor systems and partition systems. Rounded off with balcony and partition cladding, Lindner created an ideal combination of design and function for the building´s interior.
Sponsored
Wembley Stadium

Wembley Stadium

Lindner Group

Wembley Stadium was built in 2007 in the spot of the legendary ‚early‘ Wembley Stadium. It is one of the largest arenas in Europe and surely one of the most scenic worldwide.Lindner was responsible for carrying out a comprehensive interior fit-out package (and some exterior works) worth approx. 21 million Euros.

Showing 1-12 of 12