866,000 tiles were fixed in the London Aquatics Centre, which formed the gateway to the Olympic Park. Products used: ARDEX WPC Waterproof Protection System, ARDEX S 7 Flexible Waterproof Coating for Floors and Walls, ARDEX S 21 Rapid Hardening Floor Tile Bedding Mortar, ARDEX X 77 MICROTEC Flexible Wall & Floor Tile Adhesive, ARDEX-FLEX FL Rapid Setting Flexible Tile Grout for Wide Joints.
Contact Ardex Ltd – Flooring, Tiling & Screeding products by clicking the button below to find out which products were used in this case study.
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks
ARDEX Completes Another ‘Historic’ Project
DAVID LLOYD LEISURE CLUB
St George's Chapel - Westminster Cathedral London