NBS Source
I'm a manufacturer

Victoria and Albert Museum - London

OVERVIEW

Thousands of original English Heritage wooden blocks had to be removed, resurfaced and re-laid using a complete system of ARDEX Fast Track products under the strictest guidelines.

Products featured in this case study

View all products (92)
ARDEX A 38 Ultra Rapid Drying Screed Cement

ARDEX A 38 Ultra Rapid Drying Screed Cement

ARDITEX NA Ultra Rapid Levelling Compound

ARDITEX NA Ultra Rapid Levelling Compound

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai

Royal Bank of Scotland

Royal Bank of Scotland

More case studies from Smoothing and levelling underlay compounds

View all case studies (30)
UltraFloor makes homeowners dream come true

UltraFloor makes homeowners dream come true

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor gets an 'A' for effort at Derbyshire School

UltraFloor set up home at prestigious housing development

UltraFloor set up home at prestigious housing development

Houses of Parliament - London

Houses of Parliament - London

More case studies from Quick-drying levelling screed mixes

View all case studies (14)
Madrid Airport

Madrid Airport

Tollcross International Swimming Centre

Tollcross International Swimming Centre

Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks