OVERVIEW
Totally refurbished in only 8 weeks after the late realisation that the entire pool floor had to be removed and retiled, ARDEX dived in to offer a fast track solution for the
upcoming Commonwealth Games.
ARDEX A 38 Ultra Rapid Drying Screed Cement
Swimming Pool Render, Waterproofing and Tiling Systems
ARDEX EG 8 PLUS Epoxy Tile Grout
ARDEX WPM 200 Solvent Free Epoxide Liquid Waterproof Membrane
British Museum - London
Victoria and Albert Museum - London
North Manchester General Hospital
Royal Bank of Scotland
Madrid Airport
Savoy Hotel Restoration Project
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks
ARDEX A 29 at Coalville Leisure Centre
Gleneagles Hotel, Spa and Golf Resort
London Aquatic Centre - Olympic Pool
Thames Lido
The Old Town Barber Club Dunfermline
London Aquatic Centre - Olympic Pool
Thames Lido
Butlins Bognor Regis Pool Complex
DAVID LLOYD LEISURE CLUB