As part of a £50million group investment, the prestigious Colchester club needed 3,500m2 of tiling to cover the swimming pools, changing rooms, walkways and reception areas. Products used: ARDEX A 38, ARDEX E 100, ARDEX S 7, ARDEX WPC, ARDEX X 77, ARDEX X 78, ARDEX X 7, ARDEX-FLEX FS, ARDEX-FLEX FL, ARDEX WA
Contact Ardex Ltd – Flooring, Tiling & Screeding products by clicking the button below to find out which products were used in this case study.
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks
ARDEX Completes Another ‘Historic’ Project
London Aquatic Centre - Olympic Pool
St George's Chapel - Westminster Cathedral London