NBS Source
I'm a manufacturer

London Bridge Rail Station

OVERVIEW

The proven, durable properties of Sika’s high-quality waterproofing system were required to ensure the successful upgrade of one of the UK’s busiest rail terminals.

The multi-million pound refurbishment of London Bridge station – which brings an estimated 56 million passengers into the city each year represents a huge undertaking by Network Rail to create new connections and increase peak hour services by 30%. The project is part of the government-sponsored Thameslink Programme.

Products featured in this case study

View all products (184)
SikaDur Combiflex System - Joint And Crack Sealing System

SikaDur Combiflex System - Joint And Crack Sealing System

Sika 1 Pre-Bag Waterproofing System

Sika 1 Pre-Bag Waterproofing System

More inspiration from Sika Limited

View inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford