NBS Source
I'm a manufacturer

Christ Church URC, Chelmsford

OVERVIEW

Christ Church URC in Chelmsford, Essex provides a hub for the whole community, hosting mother and toddler groups, social meetings and youth based events as well as traditional religious services. The church’s brick-clad structure includes exposed concrete columns which were showing signs of deterioration due to carbonation together with other factors causing the steel reinforcement to corrode and the surface to crack and spall, leaving the reinforcement bar exposed in areas.

Sika supplied the long-term concrete repair and protection solution for a church façade which had displayed signs of deterioration due to long-term exposure to air pollutants.

Products featured in this case study

View all products (184)
Sikagard®-550 W Elastic - Anti-Carbonation Coating

Sikagard®-550 W Elastic - Anti-Carbonation Coating

More inspiration from Sika Limited

View inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

London Power Tunnels - Concrete for Tunnelling

London Power Tunnels - Concrete for Tunnelling