NBS Source
I'm a manufacturer

Gateshead Leisure Centre Tyne and Wear, UK

OVERVIEW

Following decades of usage, the Gateshead Leisure Centre, Tyne and Wear, was suffering from age. To repair its badly leaking pool and restore the entire facility to its former glory, it was shut for a year so that a multi-million pound refurbishment scheme could be completed.

The scheme, delivered by main contractor Willmott Dixon as part of a design and build contract with Gateshead Council, forms part of the Building an Active Future Programme (BaAF). The programme, which involves investing £36 million, is part of a plan to improve the health of residents in the town by 2030.

Products featured in this case study

View all products (184)
SikaDur Combiflex System - Joint And Crack Sealing System

SikaDur Combiflex System - Joint And Crack Sealing System

Sika 1 Pre-Bag Waterproofing System

Sika 1 Pre-Bag Waterproofing System

More inspiration from Sika Limited

View inspiration
Twickenham Stadium Resin Flooring

Twickenham Stadium Resin Flooring

THE CUNARD BUILDING

THE CUNARD BUILDING

Merry Hill Retail Complex Car Parks

Merry Hill Retail Complex Car Parks

Christ Church URC, Chelmsford

Christ Church URC, Chelmsford