OVERVIEW
Our team were called to site to provide a solution to replace all existing timber cladding during the very early stages of the project. Existing timber cladding consisted of board and batten style which we were able to recreate in VulcaBar®. Very carefully surveyed the installer Teampol was able to produce exact dimensions for each panel, so the secret fixing aligned with the support system, then we assembled the panels off-site.
Delivered in batch quantities via hi-ab direct to the site compound, on time in full. Installation was effectively carried out by Teampol and the project was complete within 3 months.