NBS Source
I'm a manufacturer

"waterproofing"

3,385 results found

Sort by:

Showing 289-324 of 415

Sponsored
Butlins Wave Hotel

Butlins Wave Hotel

Fixfast Ltd

Following the success of the Shoreline and Ocean hotels at Butlins’ Bognor Regis Resorts, the Butlins Wave Hotel is the newest addition, with the widest range of accommodation options. All three have been waterproofed by the Roofline Group. Cefil single-ply roofing membrane covers tapered insulation, with Fixfast tube washers and fasteners holding it all in place against the prevailing sea winds."We always get good service from you guys - that's the main reason we've stayed with you all these years"Bryan Lock - Project Manager at Roofline Group Ltd
Sponsored
Crossrail Victoria Dock

Crossrail Victoria Dock

Fosroc International Limited

Fosroc contacted the designers of the Victoria Dock project in early 2013. Working with the design team Fosroc UK used its highly experienced sales and technical staff to produce a waterproofing solution using Supercast PVC waterstop and Supercast SW hydrophilic waterbar. Materials including special angles were hand made at our Tamworth manufacturing plant and passed the scrutiny of the Crossrail approvals team. To ensure watertight construction Fosroc provided on-site training on product installation. Materials used on C340 have since been passed for use on other rail projects.
Sponsored
St.Michael's Maternity Hospital

St.Michael's Maternity Hospital

Bauder Ltd

The original waterproofing on the Maternity Hospital roof had exceeded its serviceable life and begun experiencing water ingress, requiring urgent remedial work. Bristol City Council wanted to optimise the roof area by installing a high quality, long lasting PV array that would contribute to its Solar City scheme that aims to provide one gigawatt of solar power to Bristol by 2020. The installation needed to cause minimal disruption to ongoing work at the hospital and insulation upgrades were necessary to ensure the roof achieved the required 0.25 U-Value.
Sponsored
The Gunnery, Kent

The Gunnery, Kent

Delta Membrane Systems Ltd

The Gunnery, Kent is a unique and interesting project. Delta Membranes were appointed as Waterproofing Designer to transform an unused fort/home in Kingsdown, Kent. The building was situated 92ft on a cliff edge. The Gunnery was originally a military base with extended underground rooms and thought to have ‘secret rooms’ underground. The building had suffered from fire damage as well as vandalism over the years and had been left to ruin. During a site visit various considerations were given to what Delta product would be best suited to the job, given the restrictions imposed by the existing structure.
Sponsored
Ipe timber tiles offers decking solution for ultra low height threshold

Ipe timber tiles offers decking solution for ultra low height threshold

Wallbarn Ltd

A contractor client was working on a retro-fit balcony and flat roof project in Brighton. The waterproofing membrane had tapered insulation placed on top and the contractor discovered ballasting the insulation was needed, only once on the roof. The door thresholds were too tight for a traditional decking system with joists. Wallbarn advised for paving slabs on 9mm rubber pads; then 30mm thick ipe timber tiles mounted onto Adjustable Pedestals. The buildup was under 100mm and the overall finish of the tropical hardwood was glorious. The architect was relieved that we could produce a solution, the client was delighted.
Sponsored
Paving and Decking Supports - St Katherine's Dock, London

Paving and Decking Supports - St Katherine's Dock, London

Wallbarn Ltd

This was a major refurbishment and landscaping project for an office development in the City of London. A podium deck had been re-waterproofed and the area landscaped, by contractor Scotscape, with a mixture of hard surfaces, grass lawns, planters and borders. Wallbarn has a very wide range of pedestals for a variety of applications. So we were able to supply exactly the right pad to best support the 6 x 2” joists the landscaping contractor needed to hold their decking boards. The timber joists were fixed into a frame and rigid insulation placed into the cavities between the beams.
Sponsored
Kensington House

Kensington House

Axter Ltd

Our technical team were invited to complete a roof survey and condition report of this residential project, where the existing roof area which was suffering from repeated leaks, failed repair attempts and significant standing water.ChallengesUpon inspection it was clear the roof covering had been recently renewed, but the workmanship, attention to details and drainage falls were sub-standard and no doubt contributory to the ongoing leaks and consequential ceiling damage to the areas below.Although the client preferred a robust torch-applied reinforced bitumen waterproofing system, our Safe2Torch assessment picked up some redundant roof plant, combustible cladding interfaces and complex penetrations which necessitated a localised flame free solution.Our team also carried out a level-survey to ascertain the existing falls, and what, if anything, could be done to alleviate the standing water without excessive cost.SolutionsOur comprehensive roof survey report included a dimensioned roof plan, identification of Safe2Torch areas/details, bespoke waterproofing designs for complex penetrations, and a thorough assessment of the existing roof make-up (via core samples) and drainage.Given the apparent age and good condition of half the roof area, it was left in-situ and overlaid with Hyranger single layer RBM system. Minor improvements to the drainage layout, via the introduction of a tapered insulation scheme central to the roof where the outlets where positioned, helped to significantly improve falls. Elsewhere, the rest of the existing roof covering and thermal insulation were stripped back to expose the original asphalt.The asphalt received a new air and vapour control layer before the same Hyranger system, including a mix of both flat board and tapered Hytherm ADH insulation, was installed to improve the falls and correct the thermal performance balance.A Safe2Torch abutment detail to existing cladding was identified early on in the Axter roof survey report as a fire safety hazard, so in accordance with our specification and recommendations, our accredited Axtershield Installer - N R A Roofing & Flooring Services Ltd - expertly installed a Hyranger Neo-Bitumen Flame Free membrane solution around a 900mm wide margin.The Axtershield Installer worked efficiently and to a very high standard to complete the project on budget whilst delivering an aesthetically pleasing and robust waterproofing solution.Systems in useHyranger®Neo-Bitumen® Flame Free
Sponsored
DECOTHANE IS EFFECTIVE MEDICINE FOR WEST SUFFOLK HOSPITAL ROOF

DECOTHANE IS EFFECTIVE MEDICINE FOR WEST SUFFOLK HOSPITAL ROOF

Sika Liquid Plastics

Sika Liquid Plastics has specified and supplied a roof upgrade solution for West Suffolk Hospital to renew the waterproofing membrane on multiple areas of the hospital campus and create a gradual pitch to aid drainage while enhancing the building’s thermal performance. Delivered by specialist contractor, Allard Construction, the phase four programme included seven sections of the building in a 20 week programme. The seven areas that needed work were all under heavy coverage of mechanical plant and pipework, and consequently there were large areas of restricted access, these issues made Sika Liquid Plastics the perfect choice for the project
Sponsored
Sopralene Flam 250AF used on first UK Passivhaus school

Sopralene Flam 250AF used on first UK Passivhaus school

Soprema UK

Harris Academy Secondary School is a 6 form-entry secondary school in London. The project brief was developed with London Borough of Sutton and Harris Federation, together with multiple stakeholders and the surrounding community. Architype, a top London based architect, were asked to design a new school which could meet Passivhaus standard and also go on to meet BREEAM requirements. The requirement of this high quality development was the integration of environmental sustainability, user comfort and well-being. To meet these requirements they needed a high quality roof specification which could offer thermal insulation and a high performance waterproofing solution.
Sponsored
‘Our Lady Star of the Sea’ Church in Amlwch - Isle of Anglesey

‘Our Lady Star of the Sea’ Church in Amlwch - Isle of Anglesey

Koster Aquatecnic Ltd

Our Lady Star of the Sea is a historically significant 20th Century building designed by Guiseppe Rinvolucri. Time and the elements have caused so much damage that this Grade II Listed building could no longer serve as a house of prayer and worship The products used were Restoration Plaster White which cures to a bright white finish and "Restoration Plaster Coat", which creates a smoother but still breathable finish. Koster Polysil TG 500 a special salt blocking silicate polymer primer and Koster NB1 Grey, a waterproof sealing slurry that is effective against negative side water pressure.
Sponsored
Beechview Drive

Beechview Drive

Licata Building Systems Ltd

Beechview Drive is a development by MD Constructions Ltd consisting of 8 brand new, luxury detached family houses set in a secure gated development. Each comprising 5 bedrooms, 3 bathrooms, stunning kitchen diners and integral double garages. Licata Building Systems supplied full silicone render systems and clay brick slips systems for the facades of the houses. The combination of the two finishes created a modern style to the development. Full Licata waterproofing systems were used in the bathrooms of the properties and were also finished of with high quality premium Italian porcelain tiles supplied by Licata.
Sponsored
Christ Church Primary School - School hall fit for playtime thanks to F Ball

Christ Church Primary School - School hall fit for playtime thanks to F Ball

Ball, F and Co Ltd

F. Ball’s high performance subfloor preparation and adhesive products have been used to renovate the floor of a 160m2 school hall at Christ Church CE Primary School in Kent. A combination of Stopgap 600 deep section base compound and Stopgap 200 Smooth acrylic floor smoothing underlayment was used over a Stopgap Waterproof Surface Membrane, firstly to build up the subfloor to the required thickness and then create a smooth, durable surface on which the final floorcovering could be laid. Styccobond F46 pressure sensitive acrylic adhesive was used to secure the vinyl Polyflor XL floorcovering to the finished subfloor...
Sponsored
Flat roof overlay at historic lighthouse.  Koster TPO Membrane.

Flat roof overlay at historic lighthouse. Koster TPO Membrane.

Koster Aquatecnic Ltd

Koster Aquatecnic were approached by the project architect to assist in a specification to renew the waterproofing to the roof of the large visitor cottages at the base of Ardnamurchan Lighthouse.This lighthouse is situated at the most westerly point in the British Isles and as such is extremely exposed to the elements. A robust material and system had to be produced. This was a very challenging project and a great deal of assistance was provided including bespoke drawings, office and site meetings followed by leak testing services to ensure fully watertight.Please read through the case study and if you have any questions or would like advice on a similar project, please contact technical@kosteruk.com.
Sponsored
One Thames City

One Thames City

RYNO

Thames City is a spectacular location and presence in Zone One of the River Thames. With some of the city’s most breathtaking views, especially for those not afraid of heights, this is a fresh district featuring three residential towers, a development of 12 buildings, beautiful apartments with private luxury amenities, high-end retail, and fine dining venues.The overall experience of this amazing project is made even more appealing thanks to its network of interconnecting parks, cosy green courtyards, and romantic city squares.This project was complex, involving both TerraSmart Rail Paving and TerraSmart Pedestal Paving Systems. Both these systems are designed for waterproofed substrates with TerraSmart Rail being the ultimate raised paving system, unbelievably solid thanks to its unique lattice framework.Due to the height of the tower, we worked closely with Midgard Design Services to develop and install an appropriate wind uplift mitigation solution to keep the project within budget.The TerraSmart Rail Paving System was weighted using ballast weights, and installed in the joist frame to mitigate uplift – it couldn’t be fixed into the structural slab due to it being an inverted roof. The pavers were then mechanically fixed to the joists using a wind uplift visual fixing, which clamps down the entire system.The TerraSmart Pedestal Paving System was mechanically fixed to the structural slab as there was no waterproofing membrane to penetrate underneath. The wind uplift mechanical fixing was screwed into the top of the pedestals to retain the concrete pavers and prevent any movement in strong winds.The installation of the systems was beautifully done by ANC Construction and the proof is in the photos you see on our website.
Sponsored
When sustainable design meets functionality

When sustainable design meets functionality

RENOLIT Cramlington Ltd

Ghelamco Arena CHALLENGE Ghent’s football club, KAA Gent, had big ambitions – having a big stadium was one of them. Its brand new home was built in order to seat more spectators and take the club to the top of the Belgian league. As the first newly-built stadium in Belgium since 1974, the multi-use Ghelamco Arena opened its doors in 2013. The stadium hosts - besides KAA Gent matches - a multitude of events throughout the year, as well a gym, supermarket, office facilities and a Guide Michelin restaurant. It’s located near the historical centre of Ghent, just outside the city. The arena, which seats 20,000 supporters, is one of Europe’s most modern stadiums. A stadium specifically designed for the ultimate football experience! How could RENOLIT help make the new stadium a success?SOLUTION The Ghelamco Arena is a real eye-catcher: impressive, fashionable in design and an architectural beauty. The stadium, however, is more than just design, it is above all environmentally friendly. The stadium was constructed with considerations towards its ecological footprint and as a result, the roof was made waterproof by means of the ecological, reflective RENOLIT ALKORBRIGHT waterproofing membrane. This completely white roofing membrane, together with the special protective coating on top of the membrane ensures a high reflection of the sunlight, which in summertime has a positive impact on the climate inside the building. With an initial reflection of 90%, the RENOLIT ALKORBRIGHT concept can consider itself to be at the absolute top of the “cool roof” roofing membranes. 
Sponsored
Car Park Resin Flooring System - Capital Quarter Multi-Storey Resin Flooring

Car Park Resin Flooring System - Capital Quarter Multi-Storey Resin Flooring

Degafloor Ltd

One of Cardiff city centre’s recent regeneration schemes, Capitol Quarter, required a multi storey car park to provide parking for the new office buildings within the development. To ensure the car park was protected and finished with the highest quality materials, the main contractor sought advice from Degafloor Ltd to ensure a suitable cost effective, high performance waterproofing system for the top deck, ramp and an inter deck area over occupied premises was specified. Following a full site visit and having assessed the client’s requirements in full, Degafloor specified the CP TD system with fleeced banding to substrate cracks and all upstands for the top deck, the CP HD system for the ramp and a fully fleeced CP TD for the area over occupied premises. Capital Quarter Multi-Storey Car Park Cardiff Why Degafloor Degafloor car park decking systems use highly advanced fast curing MMA chemistry to create flexible and incredibly durable systems that cure fully within just 1 hour of installation, even at temperatures as low as -10°C. They are completely waterproof, so guard against water ingress that could result in the decline of structures or damage to property (premises or vehicles). This combination of superior performance, skid resistance, rapid cure times and design flexibility, have contributed to the Degafloor range of car park decking systems becoming a popular choice for new build and refurbishment projects where speed and ease of installation, longevity and visual aesthetics are paramount.
Sponsored
wedi brings wellness to Hilton Heathrow T5

wedi brings wellness to Hilton Heathrow T5

Wedi Systems (UK) Ltd

The impressive wellness & luxury spa centre at Hilton Hotel London Heathrow T5 created by specialists Milk Leisure, specified wedi to construct & supply a series of bespoke steam rooms & wellness elements. Aroma rooms, salt & rasul treatment plus wellness benches with heated elements & an ice-fountain were all produced using wedi’s customised solutions service. All produced to the highest standards & pre-assembled in the wedi factory to ensure accuracy before delivering to site. The wedi system brings true wellness & peace-of-mind delivering a high quality fully waterproof installation ahead of schedule & supported by a system warranty
Sponsored
Gatwick Station Platforms 5-7 Upgrades

Gatwick Station Platforms 5-7 Upgrades

Sika Limited

The UK’s second busiest airport, Gatwick Airport, is also home to a rail station which handles in excess of 20 million passengers annually – making it one of the 10 busiest stations in the UK outside of London.Network Rail are currently managing a redevelopment project at Gatwick station, which is being delivered by Costain. Part of this project is a new concourse for the station.The redevelopment of the station includes improvement works to create a larger, more accessible interchange between the station and airport. As part of the upgrades to platforms 5-7, Costain worked with Sika waterproofing products and Hanson for the concrete mix to ensure the rebuild was robust and would offer significant longevity.
Sponsored
iDecking Project - Finchampstead, Berkshire

iDecking Project - Finchampstead, Berkshire

Wallbarn Ltd

This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.
Sponsored
Le Cristolien - Paris

Le Cristolien - Paris

EFFISUS

Completely restructured, the building is BREEAM Good, certified by BBC Effinergie Rénovation and HQE Rénovation Très Bien. With its partners, was chose a bold architecture that meets the challenges of the future, anticipates future developments, considering all its dimensions. Several Effisus solutions were used in this project: Effisus Ecofacade, to ensure water and air tightness of all facade elements connections, the waterproofing adhesive Effisus Bonding KF, the facade joint sealing solution for rainwater with pressures up to 600Pa Effisus Sealexpand XTRA 600 and also the multifunction double-sided butyl-based sealing tape Effisus 2Bond GO.
Sponsored
Park Plaza - London Park Royal

Park Plaza - London Park Royal

Licata Building Systems Ltd

Park Plaza London Park Royal provides tasteful accommodation for all guests whether you are travelling on business or a family getaway in west London. The modern, full-service hotel features 212 spacious guest rooms, four exemplary meeting rooms, a convenient on-site restaurant and a contemporary bar.In the development of this project, Licata Building Systems provided approved and certified systems consisting of high quality products. Licata waterproofing systems were used throughout the building, providing sustainable and effective solutions for the project. Licata resin flooring applied throughout public area of the hotel creating a modern and sleek environment throughout. 
Sponsored
T-Pren on Recreational Centre, Calgary

T-Pren on Recreational Centre, Calgary

Matthew Hebden

Nearly 1000 metres of T-Pren gutter expansion joints were installed on the 28,000 sq.m. curved roof the Rocky Ridge recreational centre in Calgary, Canada. The wide curved gutter required long special lengths of T-Pren, 9-18m long, and were installed in pairs to provide double the expansion movement. T-Pren forms a waterproof expansion joint, which eliminates the standard step detail and so reduces the number of rainwater outlets required. T-Pren is a composite material made from neoprene and metal bonded under controlled factory conditions to ISO 9001 quality standards.
Sponsored
Tate Modern Extension

Tate Modern Extension

Radmat Building Products Ltd

The Tate Modern’s Switch House is a new pyramid-shaped tower is built above the former power station’s subterranean oil tanks. The extension, which can be seen as you approach from the north, comprises ten floors that become incrementally smaller towards the top of the tower and culminates in a spectacular public roof terrace. Visitors to the roof are rewarded with 360-degree views of the river Thames, St Paul’s Cathedral and the London skyline, and you can see as far as Tower Bridge, the Old Bailey and Wembley Stadium.Radmat Building Products supplied a waterproofing solution to roof and viewing platform on the newly opened extension.
Sponsored
28 Well Hung Restaurant, London - F. Ball provides natural look for new organic meat restaurant

28 Well Hung Restaurant, London - F. Ball provides natural look for new organic meat restaurant

Ball, F and Co Ltd

Stopgap 800 wearcoat has been used to create a visually striking floor finish at a new organic meat restaurant in South London. First, contractors lifted the old wood floorcoverings to ensure it was suitably sound, smooth, and dry. To guard against excess subfloor moisture, contractors applied Stopgap F77 waterproof surface membrane to isolate excess subfloor moisture. Stopgap 800 Wearcoat was then applied over the entire subfloor. Stopgap 800 was selected due to its capabilities when it comes to upgrading and renovating new and existing internal floors, where floorcoverings are not required to be installed, making it perfect for this project.
Sponsored
Alleyne's Academy, Stone - F. Ball products help with A* refurbishment at Staffordshire school

Alleyne's Academy, Stone - F. Ball products help with A* refurbishment at Staffordshire school

Ball, F and Co Ltd

Fast-track products from F. Ball have enabled a school hall to be refurbished after damage caused by floods. To begin with, contractors removed existing wooden blocks from the floor and used a mechanical scabbler to remove old adhesive residues. Stopgap F77 one-part waterproof surface membrane was applied due to high moisture levels in the subfloor, followed by a subsequent application of Stopgap 1200 Pro to provide a smooth surface for the receipt of new wooden floorcoverings. Once cured, contractors used Styccobond B95 high performance wood flooring adhesive to install new oak blocks over the entire floor area.
Sponsored
ABG blueroof - Green Extensive, Rathbone Market, London, UK

ABG blueroof - Green Extensive, Rathbone Market, London, UK

ABG

The designer obtained consent under the latest SuDS regulations in the densely build area of London. Restriction on outflow rates to sewers demanded high attenuation. The original design for stormwater attenuation involved discharging tanks under the ground. This was expensive and took up valuable space, an alternative was required. ABG proposed their Blueroof system which could be installed directly on to the hot melt waterproofing system allowing various surface finishes. Due to height limitations a cascade system was used. Various roof finishes included paved access, landscaped areas and bio diverse to attract wildlife. This increased the potential for BREEAM points.
Sponsored
Norwich High School for Girls

Norwich High School for Girls

Bushboard Washroom Systems Ltd

Norwich High School for Girls is an independent day school combining a nursery, prep school, senior school and sixth form, Norwich High School caters for girls aged 3 through to 18.Bushboard Washrooms were chosen for the recent refurbishment of their school washrooms. The school chose our Quadro toilet cubicle in Mulberry and Steam with Solid Surface washtroughs. Our Solid Grade Laminate material was chosen for the school washrooms providing a robust, totally waterproof washroom, ideal for high traffic. Both the staff and the pupils are thrilled with their new school washrooms. Read the whole case study on our website.
Sponsored
Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Modular in, Modular out’ – M-Trays® transform construction huts in Knightsbridge

Wallbarn Ltd

A three year construction project in Knightsbridge required a temporary green roof on welfare huts. The local residents were concerned about overlooking these steel huts long-term. The solution is M-Tray® – our modular green roof system. The steel huts were wheeled into position on site on skates. They were covered with an EPDM waterproofing membrane. M-Tray® units were installed. They were easily carried up the stairs by hand and installed by hand within minutes. The modular and portable M-Tray® can just be unclicked and lifted away upon completion of the construction process.
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
11 Freebournes Road

11 Freebournes Road

Bauder Ltd

11 Freebournes RoadBauder reinforced bituminous waterproofing system with BauderSOLAR FSynopsisA large derelict warehouse located in Witham has undergone major renovation to transform it into a storage centre for Essex County Council that will assist its services and benefit the local community. The refurbishment works were designed and project managed by Lambert Smith Hampton on behalf of the client, who wanted the building to act as a benchmark for sustainability with the roof playing an integral part in achieving this through the addition of solar panels.Bauder Building BoardProject Name:11 Freebournes RoadLocation:Witham, EssexRoof Size:5,200m²Client:Essex County CouncilProject Manager:Lambert Smith HamptonApproved Contractor:Acclaim ContractsPV Installer:CJ SolarEnvironmental focus:Solar PVThe specificationWorking closely with the client, Bauder performed a comprehensive roof evaluation survey to identify the full extent of water ingress being experienced and to confirm the suitability of adding solar. The bespoke survey report highlighted that the roof needed to be stripped back to its original deck, before being waterproofed with over 5,200m2 of Bauder’s reinforced bitumen system by Acclaim Contracts. 588 solar PV modules were then fitted onto the roof by electrical installer CJ Solar, enabling the client to generate at least 134.70 Megawatt Hours of solar power each year. Products appliedBauderSOLAR FIntegrated photovoltaic system, where the modules and the substructure are combined to form a single unit, which is secured to the roof without any penetration of the waterproofing or roof deck. System installedReinforced Bitumen Membrane System1 Reinforced bitumen membraneTorch applied, elastomeric bitumen capping sheet2 BauderPIR M 60Rigid urethane foam insulation faced on both sides with aluminium foil.3 BauderPIR FA-TETorch applied air and vapour control layerAdvocacyJulian Sanchez, Commissioning Delivery Manager for Essex County Council: “We actively look for opportunities to implement renewable energy and knew that this storage facility lent itself well to PV retrofit. Our system selection process involved the due diligence you would expect from a local authority and we decided to go with Bauder because of its comprehensive system portfolio that meant we could have a single source supply and all-inclusive guarantee; giving us complete confidence in the roof’s performance.”
Sponsored
Hexagon Tower

Hexagon Tower

Bauder Ltd

Hexagon TowerBauderflex bituminous waterproofing system SynopsisHexagon Tower is a specialist science and technology facility located in North Manchester. The roofs of the laboratories were experiencing water ingress due to poor original detailing and aged interfaces. Whilst looking to replace the failing roof, the client also wanted to upgrade the insulation to increase the U-value and improve the appearance of the rooftop using a trusted system. Bauder was selected as the supplier due to its comprehensive service offering, which includes detailed report, bespoke specification, project advice and ongoing inspections to ensure a full system guarantee can be issued.Bauder Building BoardProject:Hexagon TowerLocation:ManchesterProject Type:RefurbishmentRoof Size:6,000m²Client:IF Building Consultancy Approved Contractor:BBR RoofingThe specificationWhilst looking to replace the failing roof, the client also wanted to upgrade the insulation to increase the U-value and improve the appearance of the rooftop using a trusted system.Project challengesThe building was occupied by employees during the works with multiple trades onsite. Bauder provided a system and installation methodology, to keep disruption to a minimum for both the employees within the building and the residents of the surrounding areas. The sensitive nature of the work being carried out within the building meant that mechanical and electrical equipment could not be switched off for more than a few hours at a time.The resultElements of the existing roof surface were removed, details modified and then a Bauderflex system incorporating vapour control layer, 120mm PIR FA-TE insulation and two-layer bitumen waterproofing, with a brown finish was installed. BBR Roofing installed the system, finishing the roof area with expertly installed complex detailing around columns, windows and the area protected with a new free-standing guard rail. System installedBauderflex waterproofing system1 BauderFLEX K4ETorch applied, elastomeric bitumen capping sheet2 BauderTEC Sprint DUOSelf-adhesive bitumen underlayer3 BauderPIR FA-TEFlatboard insulation faced on both sides with aluminium foil for optimum thermal efficiency4 BauderTEC KSD FBSSelf-adhesive air and vapour control layer with mica finishAdvocacyTom Frankel, Director, IF Building Consultancy:“Thank you for making this project as seamless as possible. Your continued support has reaffirmed my position that you are the 'go to guys' for flat roofing. A job well done.”
Sponsored
Papworth Hospital, Cambridge

Papworth Hospital, Cambridge

Sika Limited

At the heart of one of the largest centres of health science and medical research in the world, the £140 million Papworth Hospital in Cambridge has seen the application of a comprehensive range of waterproofing solutions from Sika, ensuring this landmark hospital has a watertight and healthy future.Located on the Cambridge Biomedical Campus, the 300 bed hospital replaced the existing Papworth Hospital and was built by Skanska for the Papworth Hospital NHS Foundation Trust. The specialised cardiothoracic hospital will features 7 state-of-the-art theatres, a 46 bed critical care area including Cardiac Recovery Unit and Cardiac High Dependency Unit, diagnostic and treatment facilities and a 24 bed day ward.
Sponsored
Aberdeen Railway Station, Scotland

Aberdeen Railway Station, Scotland

Sika Limited

Aberdeen Railway Station is the UK’s busiest station north of Edinburgh and Glasgow and is listed is listed as ‘Category A’ by Historic Environment Scotland. The station building has a glazed canopy roof, which needed a full upgrade. This included replacement of the glazed roof area and waterproofing of the gutters around the perimeter of the canopy and of the plinth that connects the gutters to the glazed roof, forming the base for all maintenance walkways.The project had to be carried out without interruption to rail services or disruption to passengers, while adhering to strict health and safety requirements.Components:Sika Liquid Plastics Sikalastic®-825 -625.Metal Primer.S-Vap 5000 SA.Sika® Primer 600.
Sponsored
CEEQUAL WINNING PROJECT USES VOLTEX

CEEQUAL WINNING PROJECT USES VOLTEX

CETCO

Kings Cross Package 4. The tanking material had to succeed where the specified competiton fell short : all weather installation; self-healing/sealing capabilities; one product application ; mechanical not chemical bond to concrete. It also had to meet the specified requirements of BS8102 1990 Grade 4. The solution was 8000m2 of Voltex, containing zero VOC, installed in almost any weather conditions to green concrete, and proven effective on both new and remedial waterproofing projects worldwide. Aided by CETCO holding both ISO 14001 & 9001, and the properties of Voltex, the project achieved its CEEQUAL award, scoring above 75%, and rating Excellent.
Sponsored
Vibration Isolation of Residential Building over Tube Lines

Vibration Isolation of Residential Building over Tube Lines

Total Vibration Solutions Limited t/a TVS Group

TVS Group was tasked with the isolation of a residential property in St. John’s Wood as part of a redevelopment and basement extension. With the property in close proximity to the Jubilee line and the Metropolitan line passing only 5m away from the new basement extension, radiated noise and vibration was a serious concern for the client.An isolation layer utilising varying stiffnesses of Sylomer materials spanned the underside of the basement slab, continued up between the contiguous piled wall and the lining wall, and then across the top of the capping beam and to the side of the ground floor slab.Close work with the design team throughout the planning and specification process, provided a solution that integrated seamlessly with the structure and waterproofing detail.
Sponsored
Great Western Railway - F. Ball products keep contractors on track at Great Western Railway train depot

Great Western Railway - F. Ball products keep contractors on track at Great Western Railway train depot

Ball, F and Co Ltd

F. Ball products have been used to install vinyl safety flooring at the Great Western Railway train depot in Penzance. Flooring contractors installed 400m2 of flooring in the depot. Firstly, to combat the excess subfloor moisture, which can cause extensive damage to floorcoverings and lead to costly remedial work, contractors used a combination of Stopgap F77 and Stopgap F78 Waterproof Surface Membranes. The fast-setting, minimal preparation Stopgap 1200 Pro smoothing underlayment was then applied over the area. A short time later new Polyflor Polysafe Standard PUR flooring was installed using Styccobond F46, a solvent-free pressure sensitive acrylic adhesive.

Showing 289-324 of 415

Feedback