NBS Source
I'm a manufacturer

St.Michael's Maternity Hospital

OVERVIEW

The original waterproofing on the Maternity Hospital roof had exceeded its serviceable life and begun experiencing water ingress, requiring urgent remedial work. Bristol City Council wanted to optimise the roof area by installing a high quality, long lasting PV array that would contribute to its Solar City scheme that aims to provide one gigawatt of solar power to Bristol by 2020. The installation needed to cause minimal disruption to ongoing work at the hospital and insulation upgrades were necessary to ensure the roof achieved the required 0.25 U-Value.

No featured products in this case study

Contact Bauder Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Bauder Ltd

View all case studies (61)
Royal Opera House

Royal Opera House

Scoil Phadraig School

Scoil Phadraig School

Sharrow Primary School

Sharrow Primary School

Small Animal Hospital

Small Animal Hospital