NBS Source
I'm a manufacturer

Norwich High School for Girls

OVERVIEW

Norwich High School for Girls is an independent day school combining a nursery, prep school, senior school and sixth form, Norwich High School caters for girls aged 3 through to 18.


Bushboard Washrooms were chosen for the recent refurbishment of their school washrooms. The school chose our Quadro toilet cubicle in Mulberry and Steam with Solid Surface washtroughs. Our Solid Grade Laminate material was chosen for the school washrooms providing a robust, totally waterproof washroom, ideal for high traffic. 


Both the staff and the pupils are thrilled with their new school washrooms.


Read the whole case study on our website.

Products featured in this case study

View all products (185)
Doc M Pack with Back to Wall WC (Left Hand)

Doc M Pack with Back to Wall WC (Left Hand)

Chartham Wall Hung 380 Washbasin

Chartham Wall Hung 380 Washbasin

Quadro Panel Cubicle

Quadro Panel Cubicle

Solid Surface Washtrough

Solid Surface Washtrough

Doc M Pack with Back to Wall WC (Right Hand)

Doc M Pack with Back to Wall WC (Right Hand)

Chartham Rimless 750 Projection Back to Wall WC

Chartham Rimless 750 Projection Back to Wall WC

Ready Plumbed Module Duct Panels

Ready Plumbed Module Duct Panels

More case studies from Bushboard Washroom Systems Ltd

View all case studies (34)
The Copper Kettle

The Copper Kettle

Hopwood Hall College

Hopwood Hall College

Huddersfield University

Huddersfield University

The Forest School

The Forest School

More case studies from Duct and wall panel lining systems

View all case studies (26)
Aberavon Aqua Splash

Aberavon Aqua Splash

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

Newhaven Holiday Park

Newhaven Holiday Park

More case studies from WC pans

View all case studies (21)
Aberavon Aqua Splash

Aberavon Aqua Splash

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

Newhaven Holiday Park

Newhaven Holiday Park

More case studies from Wall-hung washbasins

View all case studies (13)
Ysgol Saron

Ysgol Saron

Cheltenham Tigers Rugby Club

Cheltenham Tigers Rugby Club

Fitzjohn's Primary School

Fitzjohn's Primary School

Heathrow Terminal 5

Heathrow Terminal 5

More case studies from Fully-framed panel cubicle systems

View all case studies (13)
Aberavon Aqua Splash

Aberavon Aqua Splash

Newhaven Holiday Park

Newhaven Holiday Park

Heathrow Primary School

Heathrow Primary School

Ysgol Gyfun Ystalyfera

Ysgol Gyfun Ystalyfera

More case studies from Wash troughs

View all case studies (5)
Croydon High School Sport Building And Nursery

Croydon High School Sport Building And Nursery

GEC Anderson Domestic Bathroom

GEC Anderson Domestic Bathroom

Wapping Hydraulic Power Station

Wapping Hydraulic Power Station

Urban Playground

Urban Playground