NBS Source
I'm a manufacturer

"raised access floor"

477 results found

Sort by:

Showing 37-72 of 73

Sponsored
Tentamus Group, Pride Park - F. Ball delivers flawless flooring for laboratory

Tentamus Group, Pride Park - F. Ball delivers flawless flooring for laboratory

Ball, F and Co Ltd

Stopgap subfloor preparation products from F. Ball and Styccobond F44 acrylic adhesive have been used to create a laboratory-standard flooring finish at a new facility for international laboratories operator Tentamus Group, at Pride Park in Derbyshire.Flooring contractors used Stopgap Fill and Prime and Stopgap 1200 Pro levelling compound to prepare 1500m² of metal raised access panels over two floors before installing vinyl sheet safety flooring throughout. Once the primer had cured, Stopgap 1200 Pro levelling compound was applied to create a perfectly smooth base for the installation of floorcoverings. Contractors then used Styccobond F44 acrylic adhesive to install Polyflor Polysafe Standard PUR heavy-duty vinyl safety flooring. Finally, Quantum PVC capping and coving was installed at the junctions between the floorcoverings and walls to produce a neat finish and allow for easy cleaning. 
Sponsored
Oxford Technology Park

Oxford Technology Park

IOBAC

Client prioritises sustainability with IOBAC MagTabs & new carpet tile kids on the BLOQRead how sustainability was prioritised at Oxford Technology Park, a major new office and research project, by specifiying adhesive-free MagTabs and BLOQ carpet tiles on raised metal access flooring.
Sponsored
St Bernadette’s Eco-Friendly School, Scotland

St Bernadette’s Eco-Friendly School, Scotland

Howe Green

79 of Howe Green’s 7500 Series aluminium access covers were specified for Eco-Friendly primary school, St Bernadette’s in Antonshill. Council architects required a solution to access essential services housed in raised flooring including the school’s sprinkler network, hot and cold water supplies and electric and data cabling. The covers were installed by A. Andrews and Sons to cover a continuous run of 75 metres of floor space with additional multipart units also fitted onto adjoining legs. The access covers were designed to be in-filled with industrial grade carpet to match the surrounding area.
Sponsored
Hopton Hall Gardens - Raised Planters

Hopton Hall Gardens - Raised Planters

WoodBlocX Ltd

Six of our large raised planters can be found in the walled garden of the historic Hopton Hall on the outskirts of the Peak District. The hall has a rich 600-year heritage and has hosted the likes of Oliver Cromwell and Mary Queen of Scots. Today the hall is a privately owned home with holiday cottage accommodation. Its beautiful gardens are open to the public, who travel from all over the world to see its famous snowdrop displays in spring and its fragrant rose garden in summer.The kitchen garden sits within the walled rose garden and is used to grow vegetables, herbs and varieties of pollinator-friendly flowers.There are two rows of three raised planters. This area of the garden is sloped, therefore the planters needed to be built into it to maximise the space large beds have been built into the slope.Hopton’s head gardener opted for high planters for ease of access and each design is 0.85m high.WoodBlocX modular planters are a popular choice for parks and gardens. The combination of versatile design and superior finish means the structures work well in historical and heritage settings and equally well within modern schemes by simply switching from traditional to contemporary capping, which sits flush with the structure.Raised planters can also be designed with integrated seating and in bespoke shapes and sizes, and we offer all clients a Free Design Service which will visualise your design in a series of CAD views.Bei
Sponsored
SubFloor Acoustic Raised Flooring Transforms and Enhances Luxury Hotel Apartments in Fowey, Cornwall.

SubFloor Acoustic Raised Flooring Transforms and Enhances Luxury Hotel Apartments in Fowey, Cornwall.

Floor Levelling Systems Ltd

This case study focuses on a prestigious project in Fowey, developed and constructed by Bailey Partnership and Brady Construction Services. In these luxury hotel apartments a raised acoustic flooring system, known as SubFloor, was successfully implemented. The project highlights the simplicity, speed of assembly, and flexibility of SubFloor, providing architects and contractors in the construction industry with a practical and efficient solution. Additionally, SubFloor's user-friendly features, such as easy height adjustments, garnered praise from the carpenters, enabling them to work more comfortably and efficiently. By offering a seamless and rapid installation process, superior acoustic performance, and convenient adjustability, the SubFloor system surpassed expectations and contributed to the project's overall success.Products:Wooden Joist 45 x 45 mmSubFloor Screw 300 mmScrew Foot Acoustic Constructions:Joist separation c/c 400 mmBuilding height: 73 – 323 Data:System weight: 3.43 kg/m²Acoustic damping: Up to 28 dB [rating according to ISO 717-2]Point Load 50 x 50 mm (c/c 400 mm):13.96 kN/m² - Next to screw over joist[According to SS-EN 1195:1998] Materials:Pine T0-C24Fibre-reinforced VitamidePolyamide + Rubber Damping Element
Sponsored
SAC Flush Floor Access Cover - Doha

SAC Flush Floor Access Cover - Doha

Surespan

Product:Surespan manufactured this SAC Aluminium, single leaf, flush floor access cover to fit a structural opening 1000 x 1000mm. The access cover comes complete with gas spring assisted, Aluminium chequer plate lid which locks in the open position with a safety hold open stay to prevent against accidental closure. Should any water pass the seals, it will be dispersed via an integral drainage channel. The lid is held shut by a heavy-duty Grade 316 Stainless Steel ‘slam action’ cab lock and can open from both sides with the use of a removable ‘Tee’ key., for safety. Finished Self-colour Aluminium.
Sponsored
How to move a floor access cover safely and easily

How to move a floor access cover safely and easily

Howe Green

By using a pair of Howe Green Access Cover Skates you will make light work of moving heavy access covers! Health and safety is a major consideration for all building owners, facilities managers and contractors. The Howe Green Access Cover Skate removes the need for operatives to manually move heavy manhole covers and access covers when accessing concealed services. By reducing the requirement to handle heavy objects the risk of injury is greatly diminished. With up to a 300-kilo lift from each Howe Green Access Cover Skate you will benefit from a powerful floor access cover lifter.
Sponsored
HIACE Single Leaf Hatch - Residential Home Floor Access

HIACE Single Leaf Hatch - Residential Home Floor Access

Surespan

ProjectSurespan designed and manufactured a single leaf hatch that was installed in a residential home in Solihull, for access to an underground level gym.ProductThe HIACE external single leaf access hatch to fit a structural opening 1200 x 3400. The pan-type door was recessed for 40mm paving slabs infill with an EPDM unbroken seal to help prevent the ingress of dirt and moisture. The floor hatch was fitted with a retractable safety grid operated by a 24v actuator. FeaturesRated at pedestrian loading, operated by two 24v DC Actuators. 40mm paving slabs infill. Retractable safety grid Supplied with a Zen-controlled 240vAC/24vDC electrical supply, and transformer.
Sponsored
Flush Floor Access Hatch - SoFi Stadium, Inglewood, LA

Flush Floor Access Hatch - SoFi Stadium, Inglewood, LA

Surespan

Surespan designed and manufactured four access products for the SoFi Stadium in Inglewood, California The Project:HKS Architects were behind the architectural design of the stadium by creating an unrivalled sports and entertainment destination. The 5-billion-dollar stadium has created a diverse event space that offers an unparalleled experience from enjoying cocktails and food to immersive sporting events.The stadium offers a ground-breaking video experience that became the first venue to air live football on its roof. Furthermore, the centre-hung Samsung screen is the world’s first halo video board that is roughly 70,000 square-foot, dual-sided and is considered the most LEDs ever used in a sports and entertainment venue.The SoFi Stadium will be hosting several global events from the Super Bowl LVI 2022, 2026 FIFA World Cup and 2028 Summer Olympics opening and closing ceremonies.The Product:Surespan designed and manufactured four access products.  Two electrically operated, double leaf, flush floor hinged access covers to suit an overall frame size of 4267 x 1768mm.  Two electrically operated, double-leaf ceiling access panels to suit an overall frame size of 4267 x 1768mm. The lids have been designed to open downwards.
Sponsored
The Cutty Sark, London

The Cutty Sark, London

Howe Green

Over 50 Howe Green 7500 Series access covers were made to order for one of London’s popular tourist attractions - The Cutty Sark, as part of an extensive refurbishment project. The aluminium covers were manufactured with bespoke Z-section supports to provide a safe, reliable route to essential ventilation ducting used to keep air circulating in what is effectively a large void under the historic clipper. The covers were fitted into raised flooring within the new museum facility. The 7500 Series are designed to withstand high levels of pedestrian traffic.
Sponsored
The British Library - F. Ball’s Stopgap Fill and Prime in The British Library’s good books

The British Library - F. Ball’s Stopgap Fill and Prime in The British Library’s good books

Ball, F and Co Ltd

F. Ball products have been used as part of the refurbishment of Grade I listed building, The British Library. Contractors had to install 800m2 of flooring in the second largest library in the world. When contractors arrived on the site, the old floorcoverings had already been taken up. Stopgap Fill and Prime was selected to fill in the gaps between the raised access panels and create a smooth, even, and primed subfloor. Styccobond F40 high tack dual bond adhesive, with its ability to provide a peelable bond for release underlays, was used to adhere the carpet in the library.
Sponsored
Station Square Parade, Colchester

Station Square Parade, Colchester

Buzon UK Ltd

Station Square Parade, located next to Colchester North Station is undergoing a substantial conversion from a large office building to 67 one and two bedroom apartments set around a terraced courtyard. Buzon UK have been commissioned to supply and install the DPH pedestal system to support 20mm Rucker Rowe porcelain paving to create an external courtyard and private balconies for many of the apartments. The DPH pedestal system offers excellent water control for raised external floors as the system allows for simple, fast removal of rainwater via access cavity and is fully adjustable from 17 to 1070mm.
Sponsored
Kings Cross Residential Acoustic Flooring System

Kings Cross Residential Acoustic Flooring System

Access Floors Distribution

Capella Development, Handyside, Kings Cross LondonDeveloper: ArgentMain contractor: Laing O’Rourke Architects: Chapman TaylorSub Contractor: InstaGroup120 newly built residential apartments received InstaCoustic's 'dry' cradle & batten system combining under floor heating & topped with Knauf GifaFloor FHB25.Original plans were to install a T&G chipboard to finish the acoustic floor system, however it was determined that there were deflection risks around the proposed large format tile finish.As a result, the chipboard was replaced by the high density, gypsum fibreboard Knauf GifaFloor FHB25. This resulted in:Quicker install & less use water than a wet screed systemImproved acoustic performanceImproved fire performanceImproved thermal efficiency resulting in reduced energy costs for the end userHigher loading performance, creating a solid substrate for the finish to be applied directly toReduction in overall embodied carbon & installation of a product that offers a high recycled contentLifetime guarantee of the buildingClick the link below to read the full case studyhttps://www.instacoustic.co.uk/case-study/kings-cross-london-n1c/
Sponsored
Raising the sustainability of an Elizabethan Church in the Lake District

Raising the sustainability of an Elizabethan Church in the Lake District

Selectaglaze Ltd

Jesus Church had Selectaglaze secondary glazing installed by partner Fenestral, to raise the thermal efficiency of its thirteen lancet shaped stained glass windows in the north and south walls. The heating of the church is run on an antiquated oil-fired system which takes time to warm up the building. Once heated, a great deal of the energy was lost through the original windows. Special timber grounds were produced with enlarged gothic curved heads. By fitting the units nearer to the reveal, the primary windows are beautifully framed and the 13, Series 41 side hung casements have clearance to open.
Sponsored
The Doctors Laboratory, Salford - F. Ball Prescribes Products for Doctors’ Laboratory

The Doctors Laboratory, Salford - F. Ball Prescribes Products for Doctors’ Laboratory

Ball, F and Co Ltd

Products from F. Ball have been used to create a hygienic flooring finish as part of a refurbishment at The Doctors Laboratory, in Salford, Manchester.Flooring contractors used Stopgap Fill and Prime 700 Superflex flexible levelling compound to prepare 1500m² of metal raised access panels before installing vinyl sheet floorcoverings and coving. Once the primer had cured, Stopgap 700 Superflex flexible levelling compound was applied to create a perfectly smooth finish for the receipt of floorcoverings. With the subfloor preparation complete, the flooring contractors could install Tarkett IQ Granit Acoustic Vinyl sheet throughout the entire area using Styccobond F46 pressure sensitive acrylic adhesive which possesses a high initial tack, making it ideal for the installing of floorcoverings over larger areas. Finally, the contractors used Styccobond F66 contact adhesive to install PVC coving. 
Sponsored
Fire Rated Floor Access Covers - Hong Kong International Airport.

Fire Rated Floor Access Covers - Hong Kong International Airport.

Surespan

Project:Surespan were approached to develop and supply a series of 4 hour fire rated flush floor access covers for the Midfield Concourse expansion project at Hong Kong International Airport. The HK$10 Billion dollar project was completed in 2015 following extensive design and planning processes utilising BIM modelling. Product:Our SAC covers were specified for their fire rating and ease of customisation. The covers were specially adapted with a 200mm upstand and enhanced fire-rated materials to achieve the 4-hour rating. Sizes Supplied 1050 (41”) x 1050 (41”) 1050 (41”) x 850 (33”) 750 (29”) x 600 (23”)
Sponsored
OFFICE BUILDING YAASA

OFFICE BUILDING YAASA

Lindner Group

Yaasa Ltd. has established itself as a leading force in the online sale of ergonomically adjustable office furniture. With the expansion of its headquarters in Lannach, the company is creating not only space for innovation and product development but also new, accessible workplaces for up to 50 employees. The building, which was constructed in a strict economical manner, meets the European targets for a “Nearly Zero Emission Building". Thus, Yaasa demonstrates its commitment to sustainability and, with its own showroom, offers customers the opportunity to experience products firsthand. Lindner played a key role in the sustainable interior fit-out of the new company building: By using raised floors made from recycled wood panels, Lindner demonstrates how resource conservation and sustainability in the construction industry can also be put into practice. The wooden floors have the same physical and technical properties as a new flooring system – without compromising the special quality of the working environment. The texture of the wooden floor contributes to a pleasant atmosphere and completes the overall result of homely workspaces.
Sponsored
Futamura, Wigton: Roof Access & Safety

Futamura, Wigton: Roof Access & Safety

Eurosafe Solutions Ltd

Eurosafe designed and installed several solutions, including step units, guardrail edge protection, stepped and levelled walkways, ManSafe® systems, and raised platforms around heat exchange units for engineers' safety. A fixed stair unit was proposed for emergency access and egress planning.
Sponsored
Floor Access Hatch - Heathrow Airport Terminal 5

Floor Access Hatch - Heathrow Airport Terminal 5

Surespan

Surespan has manufactured and supplied a large access hatch in the engine house of Heathrow Airport’s new terminal five. The three-leaf hatch – which measures 6 x 3 metres – can take up to 5kN/m² loading. It has an electric actuator opening which can be activated remotely and is fire rated for up to two hours. Bill Burke, Contracts Manager at Heathrow Airport said: “We were very impressed with Surespan’s proactive approach throughout the whole project. The hatch has been well received by the authorities at Heathrow”
Sponsored
Three brands, one objective – safe access all areas

Three brands, one objective – safe access all areas

Profab Access Ltd

Three of the UK’s leading access specialists have come together to form the Access 360 portfolio, providing a total manufacturing solution for roof, ceiling, wall and floor access products for the construction industry. Access 360 comprises Bilco UK, Profab Access and Howe Green. These well-established brands all have a strong reputation for delivering innovative solutions to address the challenges of safe access within a building or external environment.
Sponsored
Raising the Grade!

Raising the Grade!

C-TEC (Computionics Limited)

Hush Pro, C-TEC’s revolutionary BS 5839-6 Grade C domestic fire detection and alarm system, is now protecting three iconic tower block developments in Manchester.Located in the centre of Piccadilly, Oxygen Towers is a striking set of three new 31-storey, 16-storey and 10-storey buildings consisting of 345 stylish 1, 2 and 3-bedroomed apartments and 12 spacious family townhouses. Designed to provide the ultimate living experience, the futuristic ‘vertical village’ combines luxury accommodation with fabulous five-star leisure facilities including a swimming pool, cinema, gym and spa. The stunning development also features lush garden terraces and rooftop gardens.Selected for its cutting-edge technology and capacity to align with the building’s fire strategy, Hush Pro integrates with the site’s BS 5839 part 1 landlord system to offer higher levels of fire protection than the Grade D unmonitored battery alarm systems typically used in domestic installations. As a fully-monitored BS 5839-6 Grade C system, Hush Pro reports open and short circuit faults and operation faults back to the fire panel and even allows management and maintenance companies to remotely monitor the system. Each of the flats features an easily accessible low-level Hush Pro Controller connected to a series of Hush Pro smoke detectors, base sounders, multi-sensors and heat detectors all seamlessly interfaced to a powerful network of C-TEC 4-loop ZFP addressable fire control panels to provide all-encompassing fire and fault monitoring of the system. If, for any reason, part of the domestic fire alarm is compromised, this will immediately be reported to the building management team to allow them to action the fault and re-instate full fire detection coverage to the flat.Said Dan Perry, Projects Manager at Solid State, the specialist fire and security company involved with the design and delivery of the project: “As well as enhancing the fire safety management, property and life protection of the buildings, a key factor in our client’s decision to invest in Hush Pro was the system’s ability to notify building management in the event of a real fire and, at the same time, its potential to virtually eliminate false alarms.”“Hush Pro’s unique capacity to differentiate between Fire Level 1, usually a false alarm reported locally in the dwelling, and Fire Level 2, almost always a real alarm activated outside of the dwelling, reduces false fire alarms, unnecessary call-outs and the risk of a real fire alarm being ignored. As our client requires immediate notification in the event of a fire but also first-class false alarm management, Hush Pro is ideal.”“Also of vital importance to our client is that, as the project consists of private balconies with an open plan flat arrangement, Hush Pro is the only fire alarm solution that can actually meet the requirements of BS 9991 Annex D3.”Said Jason Lawler, 24-7’s Group Director and the person responsible for delivering the electrical and mechanical systems for the project: “Hush Pro is an outstanding solution. The system provides residents with easy-to-use detection, alarm, silencing and test facilities so they can test their own devices, be alerted to system faults and hush any false alarms at the Hush Button which is positioned at light-switch level for safe and easy access. Hush Pro’s powerful false alarm management capability will also prove invaluable at the site.”Said Dan: “Client satisfaction is incredibly important to Solid State so we were delighted to be able to specify a robust and fully-compliant integrated BS 5839 Part 1 and Part 6 fire alarm solution for Oxygen Towers. With its capacity to provide high levels of fire protection yet also minimise costly and disruptive false alarms, Hush Pro is fast becoming the system of choice for fire strategy engineers and consultants dedicated to enhancing fire safety in high-rise residential and specialist housing projects throughout the UK.”
Sponsored
Nova N2 Development - London - Modular Washrooms

Nova N2 Development - London - Modular Washrooms

Access Floors Distribution

This new 160,000 sq. ft, 18 storey office building evolves the successful Nova formula with a sustainability conscious design, a progressive approach to work and wellbeing, and a vibrant, connected community in the heart of Victoria, London.Throughout the commercial space, a range of off-site constructed washrooms & toilet pods were manufactured in Scotland by Modular Interiors. There was a requirement to increase the finished floor height to allow this space to work effectively.The Knauf GifaFloor system is the ideal partner to this project, particularly to help with efficient programming.FHB38 1200x600mm installed on a pedestal understructure was specified as it creates a solid monolithic floor which can be installed quickly and allows for follow on trades within hours of install. Compared to traditional wet screeds, there is no long drying time, no mess or complicated health & safety issues.GifaFloor is the ideal partner to ceramic finishes such as this project. The ceramic tiles can be adhered directly to the panel, without the need for de-coupling layersThe GifaFloor FHB system offers a high acoustic performance, A1 non-combustible fire rating, limits response to moisture or heat and is manufactured from low carbon gypsum fibre.
Sponsored
Biomass Access Cover - Lithuania

Biomass Access Cover - Lithuania

Surespan

Surespan recently travelled to Lithuania to manufacture and supply a floor hatch to enable Finnish energy company Fortum to access their biomass pit at their new energy plant.The 5000 x 5000 mm hydraulically operated, the double-leaf hatch was designed to be easily operated by an electrically driven pump power pack. Fortum wanted the simplest operation for a grab crane to gain easy access to the biomass plant so Surespan worked with engineering consultants AF Consult to come up with an effective solution.
Sponsored
Profab Access Ahead of the Curve with Fire Testing

Profab Access Ahead of the Curve with Fire Testing

Profab Access Ltd

Profab Access Ltd, part of the Access 360 portfolio, is prioritising fire safety in buildings with the introduction of fire testing for both sides of its 4000 Series riser door range. Established in 2001, Profab Access Ltd is a leading UK manufacturer of wall and ceiling access panels and riser doors. The company employs a team of 71 and operates from a 46,000 sq. ft. manufacturing and distribution facility in Atherstone, Warwickshire. All aspects of the design and manufacturing process are carried out onsite.
Sponsored
Sixty London Wall

Sixty London Wall

Profab Access Ltd

Located within the epicentre of central London, Sixty London Wall delivers high quality Grade A office accommodation combined with superior retail opportunities, all housed within a visually striking contemporary development that stands apart from neighbouring buildings.Delivering 325,000 sq. ft of premium office space over 10 floors, the extensively renovated property offers collaborative working areas, bolstered by first class end of journey facilities for commuters, including 380 cycle spaces and lockers and 38 showers and changing rooms.As part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building by specialist carpentry, joinery and fit-out contractors, JJ Sweeney.Specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor, Profab Access’ robust and resilient INTEGRA 4000 Series and VISION 8000 Series fire-rated Riser Doors provide concealed access to mechanical and electrical services.
Sponsored
Building Regulations for Access Panels

Building Regulations for Access Panels

Rapid Access Ltd

Loft Hatches and Access Panels come with very important rules and regulations when it comes to installing them into a wall or ceiling. There are certain building regulations you must comply with and be aware of when it comes to installing panels or hatches.
Sponsored
Sixty London Wall - Podcast

Sixty London Wall - Podcast

Profab Access Ltd

Profab Access sets the standard for specification at Sixty London Wall’ . In this podcast you will learn how, as part of the construction process, almost 500 Profab Access high quality riser doors and access panels have been installed throughout the entire building, specified in a range of sizes and configurations for installation throughout the communal areas and washrooms on every floor.
Sponsored
Luxury access to the roof terrace by LAMILUX roof access hatch

Luxury access to the roof terrace by LAMILUX roof access hatch

Lamilux Rooflights Ltd

In densely populated urban areas of the cities, where the number of floors in housing is sometimes limited and private gardens are rare, a rooftop terrace or patio is becoming a popular design choice. However, many residential buildings with rooftop gardens don’t see much daylight and careful consideration is required to determine an access point to the roof terrace. For such rooftop projects, a new dimension of roof access is offered by the LAMILUX Flat Roof Access Hatch Comfort range, designed to give a generous daylight intake in attic apartments alongside convenient access to the roof terrace creating an air of grace and beauty both internally and externally. The LAMILUX Flat Roof Access Hatch Comfort range now introduces its fourth product into the family, giving more choice and flexibility when creating a luxurious living space with an exclusive ambience. Featuring unrestricted use as a natural ventilation device and convenient access to the roof terrace, the indoor climate also benefits from the high energy efficiency of the range thanks to the thermally broken frame and excellent air tightness values.The existing Solo and Duo Flat Roof Access Hatch products from LAMILUX open laterally by moving one or two panels horizontally to create direct access to step onto the roof terrace, whilst the space-saving hinged opening Swing variant swiftly opens its one meter by 3000 or 3500 mm long aperture to 84 degrees in just 25 seconds. The fourth, and newest addition to the Access Hatch Comfort repertoire the Square, makes it possible, for the first time, to also use spiral and platform staircases underneath. Until now, access to the roof was limited to straight stairways due to the elongated rectangular shape of the roof access hatch range. The Square only takes 45 seconds for the concealed hydraulic drives to silently open the 4m² glass element of the skylight by 70 degrees. As with the Swing, the new variant does not require any additional space on the roof terrace than its own size in closed form, even when open, thanks to its swing mechanism.   Visually, the aluminium border frame throughout the product family, attracts attention as an architectural highlight. The aluminum profiles and the reveal surface can be coated in all RAL colours offering further choice and exclusivity. Since the glass panes and frame feature a flush edge detail both internally and externally, and all variants are designed with an inclined surface, the range boasts not only a visually appealing seamless design, but also ensures that rainwater can run-off easily without leaving any dirty edges or water ponding. Safety is standard in the Flat Roof Access Hatch Comfort product family with fall-resistant glazing which can be walked on to a limited extent for cleaning purposes. As an additional safety feature, a light barrier is installed as standard which prevents the closing of the access hatch as soon as it detects something in the entrance area. In terms of energy, the new roof access hatch continues the tradition of all LAMILUX skylights: The overall system, which is free of thermal bridges and isothermally balanced and the option of special glazing meets modern demands for sustainability, energy efficiency and climate protection which ultimately save heating costs and minimizes condensation. All four products in this family have one further thing in common: They are delivered completely pre-assembled to the construction site, lifted onto the roof by a crane provided by the customer and then installed swiftly and easily. This minimizes the risk of errors and saves valuable time – both for the contractor and for the apartment user who ultimately gains access to the roof terrace. 
Sponsored
Plastic Access Panel in Small Domestic Bathroom

Plastic Access Panel in Small Domestic Bathroom

The Access Panel Company Ltd

Adding a white Plastic Access Panel into the ceiling of a petite bathroom to provide easy access to utilities without detracting from the aesthetic of the customer's bathroom. Prioritizing utility and visual appeal, the Plastic Access Panel is a cost-effective solution that grants homeowners easy entry to concealed utilities, seamlessly merging with the bathroom's ambience. The access panel's white textured surface adds a note of elegance to the surroundings, complementing any interior decor.The installation process for the plastic access panel is streamlined and straightforward. The accompanying images document each phase of the process, guiding you through the steps involved.Ultimately, this undertaking harmonizes practicality with style, underscoring how a modest addition can wield a significant impact. The white plastic access panel eradicates the need for unsightly makeshift access points. Balancing cost-effectiveness, inconspicuous aesthetics, and a dash of refinement, this installation transcends mere functionality elevating both the utility and visual charm of the compact bathroom.
Sponsored
The Shard

The Shard

Rapid Access Ltd

The Shard, 31 St Thomas Street, London SE1 9RYThe Shard is not simply an iconic building but represents a new approach to expanding the urban landscape. Offices, residences, and public spaces alike are all taken skyward.The Shard, an iconic skyscraper in London, represents one of the city's most prestigious architectural landmarks. Ensuring efficient utility access solutions within such a complex and monumental structure was a significant challenge. This case study highlights the successful collaboration between The Shard and Rapid Access Ltd, a leading supplier of FlipFix Access Panels that utilize the fast fitting FlipFix Clamps for secure and quick installation.Challenges:1. Utility Access Complexity: The Shard's unique architectural design made access to utility systems, including plumbing, electrical, HVAC, and telecommunications, particularly complex.2. Architectural Significance: The project demanded a high level of architectural integrity and minimal disruption to the building's aesthetics during the installation of access panels.3. Efficient Installation: With a building of this magnitude, an efficient and rapid installation process was crucial to minimize downtime and disturbance to occupants.Solution:Rapid Access Ltd, known for their expertise in access solutions, was chosen to address the specific requirements of The Shard. The solution included the installation of FlipFix Access Panels, which leverage the fast fitting FlipFix Clamps, designed to meet the following key criteria:1. FlipFix Access Panels: Rapid Access Ltd provided access panels that integrated seamlessly into the complex architecture of The Shard while offering secure access to utility systems.2. FlipFix Clamps: The use of FlipFix Clamps ensured quick and reliable installation, minimizing disruption and maintaining architectural integrity.3. Efficiency and Security: The access panels and FlipFix Clamps facilitated efficient access to utility systems while ensuring the security and safety of the building.Implementation:The installation of FlipFix Access Panels utilizing FlipFix Clamps by Rapid Access Ltd was executed with precision and expertise. The unique design of FlipFix Clamps enabled swift and secure installation, minimizing downtime and ensuring the structural integrity of The Shard.Conclusion:The collaboration between The Shard and Rapid Access Ltd demonstrated the successful integration of utility access solutions into a complex and iconic skyscraper. The installation of FlipFix Access Panels, using the fast fitting FlipFix Clamps, not only met functional needs but also contributed to the overall success of The Shard, ensuring efficiency and architectural harmony. This case study underscores the importance of selecting the right access solutions provider for complex architectural projects.
Sponsored
V&A Dundee

V&A Dundee

Kingspan Data & Flooring

V&A Dundee, the £80 million museum rated ‘Excellent’ at its design stage BREEAM assessment, was designed by Kengo Kuma & Associates with PiM.studio Architects and James F Stephen Architects. Maurizio Mucciola, Director at PiM.studio Architects: “Kingspan RMG600 and Attiro was used on the second-floor circulation, foyer and galleries. The raised floor and Attiro system was chosen to provide flexibility, especially to the gallery spaces which might need to be reconfigured for different exhibitions.”
Sponsored
Antibacterial Paint for Access Panels

Antibacterial Paint for Access Panels

Rapid Access Ltd

Our panels coated with Anti Bacterial powder coat are manufactured to meet the sanitary requirements of Hospitals, Labs and Clean Rooms.Our Antibacterial Powder Coat is available on all our Metal Faces Access Panels and features an effective Antibacterial agent which kills most species of bacteria including: MRSASALMONELLAE COLI C DIFFICILE
Sponsored
Access Covers - Liffey Service Tunnel Project, Dublin, Ireland.

Access Covers - Liffey Service Tunnel Project, Dublin, Ireland.

Surespan

Project:Surespan designed and manufactured several floor access covers for the £6.5m Liffey Service Tunnel Project in Dublin Ireland.The service tunnel is one of the crucial links for the rejuvenation of the docklands, it will carry water mains to the docklands and transfer wastewater to the treatment plant at Ringsend. The 260m tunnel will also carry district heating pipes, gas mains, and electrical and telecommunication cables.Products:Surespan designed and manufactured several floor access covers including SAC Flush floor access covers and HIAC Recessed floor covers.All the access covers were supplied with either a gas spring-assisted opening, hydraulic or electric with a retractable safety grid and pedestrian (FACTA Class ‘A’) Loading. A hydraulic HIAC was also supplied with a FACTA Class ‘D’ Loading which is the equivalent of an 11-tonne wheel load.
Sponsored
Introducing Our Germ Resistant Access Panel

Introducing Our Germ Resistant Access Panel

Trade Access Panels

As well as offering our customers a bespoke service in which we can offer any size and any shape access panel, we are now adding Antibacterial Powder Coating as an addition to our extensive range of products. It is available on all our Metal Faced Access Panels and features an effective antibacterial agent which kills fungi and most species of bacteria including the deadly MRSA, Salmonella, E coli and C difficile.
Sponsored
How to Choose Access Panels for Walls & Ceilings

How to Choose Access Panels for Walls & Ceilings

Trade Access Panels

This guide on the different variations of Access Panels, will help you decide which one is best for you.
Sponsored
Access Panels, A Clear Choice: Access Building Products grace the prestigious Old War Office refurbishment

Access Panels, A Clear Choice: Access Building Products grace the prestigious Old War Office refurbishment

Access Building Products Ltd

When it comes to refurbishing a landmark as historic and luxurious as the Old War Office, every detail counts. The selection of Access Building Products Access Panels for this prestigious project is a testament to the company’s commitment to quality, design, and functionality.The Project: A Blend of History and LuxuryFast forward to today, the Grade II listed Old War Office building, which has been closed to the public for more than a century, has undergone a magnificent transformation. The building has been re-imagined and redeveloped into a luxury hotel and residences, bringing a new lease of life to this historic site. This transformation demanded products that could match its grandeur while maintaining its historic charm.The Challenge: Balancing Aesthetics and FunctionalityEvery customer wants their access panels to seamlessly blend with the interior design, ensuring that the necessary utility access points don’t detract from the building’s aesthetic appeal. This was a critical consideration for such a historical building.The Result: A Seamless Fusion of History and ModernitySupplying a range of discreet steel and plaster in style access panels in the Old War Office refurbishment was a resounding success. These panels not only met the practical requirements but also added to the overall aesthetic, creating a harmonious blend of historic elegance and modern luxury.The Old War Office now stands as a shining example of how to preserve historical charm while incorporating modern necessities. This project has further cemented Access Building reputation as a reliable provider of high-quality access panels, capable of meeting the demands of even the most prestigious refurbishment projects.In conclusion, when history meets luxury, it’s essential to make the right choices. And in the case of the Old War Office refurbishment, Access Building Products Access Panels were the perfect choice.

Showing 37-72 of 73

Feedback