NBS Source
I'm a manufacturer

"protection of pipes ducts in services apertures"

5,116 results found

Sort by:

Showing 181-216 of 683

Sponsored
Paint with added protection from Crown Trade

Paint with added protection from Crown Trade

Crown Trade, product of Crown Paints Ltd

Specifiers looking to minimise maintenance requirements yet maximise cleanliness need look no further than Crown Trade’s innovative Clean Extreme Anti-Bacterial Scrubbable Matt. Clean Extreme Anti-Bacterial Scrubbable Matt is enhanced through the use of the independently tested SteriTouch® silver ion technology which not only inhibits the growth of any bacteria that comes into contact with the surface, but also prevents bacteria from multiplying. Unlike other anti-bacterial paints that can be prone to the problem of leaching, the ‘built-in’ silver ion protection can’t be washed off no matter how many times the surface is scrubbed clean.
Sponsored
Home Gas Fire Conversion

Home Gas Fire Conversion

Kompozit'All UK

application area: domestic heatinguse type: gas fireplace project scope: restore fireplaces, rebuild chimney, line chimney ductadded value: 25-year guarantee on liner, quick and clean install, non-destructiveBackgroundThe camera survey revealed cracks in the chimney flue of a large victorian house in Muswell Hill. To protect against carbon monoxide leaks, the chimneys had to be lined before the gas fireplaces could be fitted. A flexible and uninflated FuranFlex tube was placed inside the chimney duct. Each FuranFlex liner is produced to fit the dimensions of the duct. Hot steam is used to inflate and harden the liner, fixing it in position.Statement of workThe installation took one day per chimney. The jointless and air-tight liner provides good draught and a clean and safe operation for the fireplaces. When FuranFlex liners are inflated they take up the shape of the chimney, providing maximum lined diameter and natural draught.
Sponsored
Castell Alun High School Protects Extension with Yeoman Shield

Castell Alun High School Protects Extension with Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Castell High School in Flintshire supplies co-education to 1300+ students promoting strong levels of well-being.The original school building was established in 1958 and as the student intake grew extensions were built in 1974 and 1992 to accommodate.2021 saw the latest extension, Y Celtec building, completed. Problems soon became apparent with the walls within the new area being clean and damage free.The school’s Site supervisor, Paul Muncey explained “Keeping the white painted walls clean was becoming a nightmare for our cleaning team and within 12 months of the building coming into use the walls along the corridors required repainting.”Business Manager Emma Manning had come across Yeoman Shield wall protection solutions in a previous position and got in touch with regards to protecting the new building’s wall before the impact damage became too great.Yeoman Shield directly employed fixing operatives installed Mid-Grey FalmouthEx, 2500 x 1250 mm wall protection panels along the corridor walls.The panels once in place not only protect from damage but are easy to clean down and will prove over the years to reduce repair and maintenance costs. They also look good sustaining a bright, clean, and welcoming environment for staff and pupils at all times.Paul Muncey concluded, “I was very pleased with the quality of work provided by the Yeoman Shield installers who showed consideration to the environment that they were working in.”
Sponsored
Western Power Distribution: Safer Access to Transmission Towers

Western Power Distribution: Safer Access to Transmission Towers

MSA Safety (Latchways) – Fall Protection

Western Power Distribution (WPD) provides service for Midlands, South West and South Wales, United Kingdom, with a network that spans the country’s width. WPD delivers electricity to more than 21,000 square miles (55,500 square kilometers) via 136,000 miles (220,000 km) of overhead lines and underground cables and 185,000 substations. WPD has committed to provide safer access to their 15,000 towers across the network. The company had used a double lanyard for working at heights, but wanted an alternative system that was faster, safer and reduced physical demands of climbing for their line operators.
Sponsored
SigTEL protects Adobe's UK HQ

SigTEL protects Adobe's UK HQ

C-TEC (Computionics Limited)

American software giant Adobe has opted for C-TEC’s innovative SigTEL disabled refuge system at its impressive UK Headquarters in Maidenhead, Surrey.With its powerful controllers and extensive arrangement of fire telephone and disabled refuge outstations, the system is central to protecting the state-of-the-art UK offices of one of the world’s most successful software and technology-based companies. However, according to David King, Installation Manager at Niscayah Group, the company that completed the project at Market House, the installation was far from straightforward as the building already had a SigTEL disabled refuge system installed on one floor which needed to be connected to new equipment so to create one large system for the entire four-storey building.Said David: “The challenge was to interface an additional Master Controller and various outstations to the equipment already in operation. To achieve this we temporarily suspended the system and used C-TEC’s new EVC423 software to completely reprogram it once the new Controller and outstations had been installed.”Although specifically designed for the programming of larger SigTEL systems, C-TEC’s new EVC423 is also excellent for programming smaller disabled refuge/emergency voice evacuation systems.Said David: “The software proved to be a lifesaver on this particular project as it enabled us to program the entire system from scratch very quickly reducing system downtime. The fact that you can edit outstation/extension names using a PC makes programming so much quicker and easier”As a result, Market House now has a fully operational disabled refuge/emergency voice evacuation system. In an emergency situation, the system will enable clear two-way communication between building management and people located in the refuge areas to, firstly, assist rescue teams in finding people and, secondly, to let stranded people know that help is on the way.Based in London, Niscayah Group is a subsidiary of Swedish-headquartered Niscayah AB (formerly known as Securitas Systems AB). Specialising as an integrator, the company offers complete fire and security solutions for customers with high demands for security and efficient solutions.
Sponsored
Acoustic Solutions for Professional Services Firm

Acoustic Solutions for Professional Services Firm

Allsfar

See how our innovative acoustic solutions helped create a modern, flexible and social space for accountants and tax advisers across their 10,000 sq ft office in Chelmsford. The project included different colours and textures and given the sensitive nature of some of their work, the scheme also included quiet spaces, meeting rooms and work pods.
Sponsored
Senior Service Apartments

Senior Service Apartments

Trespa UK Ltd

Pura® NFC by Trespa brings subtle touch to balconies of senior housing complexA majestic historical villa and its surrounding park garden in the picturesque city of Bree were the perfect setting for a modern senior housing complex. These comfortable apartments are aimed at older people who desire living independently, but with customised assistance always within reach.
Sponsored
NBS Chorus for Building Services Engineering

NBS Chorus for Building Services Engineering

NBS

Hydrock is an award-winning, multidisciplinary engineering design consultancy working with clients across the UK. With 16 offices and over 500 staff, their work covers various sectors, including acoustics, nuclear, fire, civil + structural and building performance engineering. Director of Building Performance Engineering, Anuran Wickramasinghe, caught up with us to tell us more about the work Hydrock does for its clients and why the business uses NBS Chorus on its projects.WORKING COLLABORATIVELYAs a multidisciplinary consultancy, Hydrock work on a wide range of exciting projects, from concept to detailed construction drawings to post-occupancy evaluations. Recent projects have included the new facilities for the English National Ballet, UWE's engineering faculty and Bristol’s inland surfing destination, The Wave. According to Anuran, the ability to work on projects in the cloud has been one of the most useful features of NBS Chorus. As a cloud-based specification platform, Chorus allows multiple users to work on a specification remotely and on a range of devices, which has been extremely useful for Hydrock given the distance between their offices - and around 90% of their technical staff are currently working from home. “We’re dispersed all around the country and are working from home so having an online version of the spec is very helpful,” he said. "Having an online platform makes things much easier for us while working from home because now the engineers can access the specification and share information without overloading our servers"IMPROVING CONSISTENCYBefore adopting NBS Chorus, Hydrock used desktop product NBS Create, which is due be retired. Anuran highlighted the consistency and standardisation benefits that NBS Chorus’ stylesheets feature provides as one of the significant benefits the business has seen since making the switch. “One of my main tasks last year was to standardise our specifications and projects, and that is why we decided to use NBS Chorus. NBS's automatic updates to the standards and guidance take away a big slice of our work because we cannot dedicate a team to continually update our standard template. We’re pushing hard on our branding and thanks to the Stylesheets feature; we’ve now got the front page of our documents looking standardised which is great progress.” “Shortly, we want to utilise the Masters' feature and have one standardised template that we can work on to create our specifications and projects.” In terms of helping Hydrock create more robust specifications, Anuran says that the prompts and guidance notes provided within Chorus have helped improve decision-making during the specification process. The ability to start specifying early describing system performance before developing a fuller specification defining products and execution requirements is also of benefit. “The prompts on whether to park or specify something have helped us to progressively develop a robust specification because we can always revisit the specification and make sure that we haven't missed something that could lead to an omission on a project which could be extremely detrimental."SUMMARYIn summary, NBS Chorus is not only helping Hydrock to create more robust and more effective specifications, but it’s also helping to improve collaboration across the business’ different locations and disciplines. "Having up-to-date information and the template there help us to produce the documents much more efficiently. I don’t like the ‘copy and paste’ style of doing things because you could be working on a residential project and accidentally insert a clause from a healthcare project which happened to be the last specification the engineer worked on. The efficiency comes from being able to use the template as a starting point and not having to write a specification completely from scratch," Anuran said. “The collaboration aspect of NBS Chorus is the key because it means that the different disciplines can access and work together on the document at the same time."
Sponsored
Gaelic School, Glasgow

Gaelic School, Glasgow

nVent Thermal Management

The demand for an energy-efficient hot water distribution system was met by a single-pipe system with 850m of RAYCHEM HWAT-R self-regulating heating cables, managed by nine RAYCHEM HWAT-ECO smart controllers that interface seamlessly with the BMS. Eliminating the need for the secondary pipework of a conventional recirculation system saved space and achieved cost savings of between five and ten percent in material and installation time. Pipe freeze protection was also provided by RAYCHEM WinterGard self-regulating cables, supported by an AT-TS-13 surface-sensing electronic thermostat.
Sponsored
Compact loft ladder for fire escape – Case Study from Premier Loft Ladders

Compact loft ladder for fire escape – Case Study from Premier Loft Ladders

Premier Loft Ladders Ltd

Building contractor Eversley Building Services Ltd required a roof access ladder for emergency use in the event of a fire. However, the application constraints presented many challenges, in particular the small skylight aperture. As such, a particularly compact loft ladder was needed. Furthermore, because the loft ladder would be used during an emergency, it had to be easy-to-operate and safe for its occupants. Read more about this challenging project and how the Piccolo Premium provided the ideal solution...
Sponsored
Globe Works, Birmingham, ASF Corner Protection Bollard

Globe Works, Birmingham, ASF Corner Protection Bollard

Architectural Street Furnishings part of WB White Foundry

ASF's Building Protection Corner Bollard was used in the above project. The bollard is set up so that there is one quarter missing on the upright plane so that it fits perfectly on a 90 degree outside wall. The pattern can be adapted to other angles if necessary. Once in place the bollard acts as a wheel buffer for any vehicles getting too close to the corner - thus reducing the risk of damage to either the building or vehicle.
Sponsored
POSI-Glaze Protective Barrier at The London Science Museum

POSI-Glaze Protective Barrier at The London Science Museum

Pure Vista Ltd

The London Science Museum is one of London’s major tourist attractions, attracting 3.3 million visitors annually. Now using, interior glass balustrade. The museums’ collections comprise of both permanent and temporary exhibits. So, when they design each exhibit, they must consider how easy it is to change and adapt the space for any new collections. Displays can be created from many things, including an interior glass balustrade. The Science Museum aims to provide inspiring exhibitions to its visitors. The museum approached Pure Vista while looking for a barrier to protect an extremely valuable exhibit, an original prototype of the Brougham carriage. They required an interior glass balustrade in this London location, that was secure enough to prevent visitors from touching the exhibit but didn’t spoil the viewing opportunities. This also needed to be easy to move and adapt. Knowing that Pure Vista specialise in easy-to-adjust glass balustrade for both interior and exterior projects, they approached us for a solution.Pure Vista proposed a POSIglaze solution for this project.The force loading required for interior light-commercial balustrade is 1.50kN, according to UK building regulations. Which can be achieved with POSIglaze using the right type of glass (19mm or 21.5mm laminate SentryGlas). The real benefit of POSIglaze is that it’s the most adjustable balustrade system on the market, all thanks to our patented screw-clamp technology. This meant that the museum could easily remove a panel of glass in order to move exhibits in and out of this space. The adjustment of this system doesn’t require special skills or tools. 
Sponsored
City of London Freeman’s School Orangery -  cast iron floor grilles project

City of London Freeman’s School Orangery - cast iron floor grilles project

Britannia Metalwork Services Ltd

Britannia Metalwork worked with building contractors Gilbert-Ash and Architects Hawkins/Brown in designing, fabricating, and fitting bespoke decorative floor grilles to replace the damaged originals in the Orangery at the City of London Freeman’s School.It was a project that we were thrilled to be commissioned for and work that we are extremely proud of - the grilles were manufactured, delivered and fitted within the project timeframe, despite pressures of the ongoing global pandemic of 2021.The 168-year-old City of London Freemen's School is set in 57 acres of Ashtead Park in the heart of Surrey. The masterplan scheme included the renovation works to the Grade II listed Main House (including an energy centre), and some new buildings including junior school, dining hall and assembly hall as well as landscaping and car park works. The total cost of the project was £15 and won a place as a Finalist in the 2022 Conservation & Regeneration Constructing Excellence SECBE Awards.Britannia was commissioned to design and make a total of 33 bespoke cast iron grilles, with bare metal finish, to be placed within the marbled floor of the historic and beautiful Orangery. The focus of the work was to complement the heritage of the iconic building while ensuring good ventilation to allow the building to become a flexible and useful large space for school events.Frequently referred to as Cathedral, Ecclesiastical or Victorian decorative floor grilles and as seen here, often placed over channels holding heating pipes, they provide a practical and decorative heating vent. Originally designed for churches they are increasingly popular in private houses, greenhouses, and commercial building developments. Our grilles can be ordered in cast iron or cast aluminium and finished in a wide variety of options. We also work in association with Gunning Heating, making decorative cast iron grilles that fit seamlessly into their underfloor trench heater units.  See our website for a full list of our grille designs or contact us to discuss your bespoke requirements.
Sponsored
Crown Paints Specification Services support for tall order

Crown Paints Specification Services support for tall order

Crown Trade, product of Crown Paints Ltd

A Suffolk-based local authority turned to Crown Paints Specification Services to transform the tallest building in the most easterly settlement of the UK. St. Peter’s Court – in the coastal town of Lowestoft, Suffolk – was in need of re-decoration and Waveney District Council wanted a product that would last for the long-term. Crown Paints came out to the site, which comprises of 90 flats over 15 floors, and after an extensive inspection and review of requirements, specified 3,600 litres of Sandtex Trade 365 All Weather Masonry Paint for the project.
Sponsored
dormakaba helps Heathrow customer service soar

dormakaba helps Heathrow customer service soar

dormakaba UK & Ireland Ltd

With passenger growth at a five-year high, Heathrow Airport looked for new ways to make it easier and quicker for passengers to travel through the airport and board aircrafts quicker. dormakaba supplied and installed self-boarding gates, integrated with Heathrow’s Biometric system, as the ideal solution. Simon Wilcox, Heathrow Passenger Automation Programme Lead, recognised the growing number of passengers it handled every year and wanted an innovative way to make it easier and quicker for them to travel through the airport – without having to compromise on security. As such, the automation programme required implementing biometric gates that would bring facial recognition to each point of the departing passenger’s journey. The new technology would use facial recognition at check-in, bag drops, security lanes and boarding gates to create a seamless experience for passengers walking through the airport. When looking for the initial self-boarding gates, the team at London Heathrow Airport contacted dormakaba. After reviewing the requirements for the airport, dormakaba recommended and supplied its HSB-M03 Self Boarding Gates and PaxCheck Self Boarding Solution. dormakaba also provided its project management services, and the airport has taken out an on-going service contract for third and fourth line support. Andy Carter, Contracting Business Sales and Operations Director at dormakaba UK said “As part of their passenger journey, Heathrow required a bespoke and technically capable system to allow them to cope with the increasing passenger numbers whilst also providing a seamless passenger experience”. “The final project looks to have over 400 gates installed across the whole airport. Each one has dormakaba software on the gates, incorporating Heathrow’s biometric data, as well as a connection to the management server.” This challenge of complex integration was overcome by the close collaboration between dormakaba engineers and the project team with London Heathrow Airport’s team, and suppliers for third party products and systems. Currently, Terminals 2A, 2B and 5A have been completed, with Terminal’s 3, 4, 5B and 5C scheduled for completion by end 2020. Completed terminals now benefit from a market-leading, self-boarding solution that adheres to all the latest relevant security and build standards as well as third and fourth line support from dormakaba. Across these completed terminals, passengers present their boarding pass to a reader on the gate, which then scans and checks the pass with the airline’s Departure Control System (DCS) and either opens or remains closed depending on the response. For passengers departing on domestic flights, the gate also uses facial recognition technology to verify that the passenger boarding the aircraft either entered the airport through the front door or has been through a UK Border Force check since arriving on an international flight. Its installation being partnered with the airport’s chosen biometric provider Atkins, this system allows domestic passengers to mix with those transferring between international flights at Heathrow in the Common Departure Lounges, where they can enjoy all the benefits of the many dining and retail outlets, as well as the numerous lounges available. The self-boarding solution also includes a web-based administration programme, PaxCheck, that allows for management of the gates and sends reports of passengers and when they passed through – allowing for faster boarding, and fewer staff. This also means airport and airline management can have live stats on the numbers of passengers passing through the gates in any given period
Sponsored
Oval Village, London

Oval Village, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley HomesOval Village is a mixed-use development in Kennington, London SE11, built on the site of the Oval Gasworks. The 2ha site overlooks the Oval Cricket Ground and will be redeveloped with 738 new homes, offices, retail and leisure facilities.This is another landmark project where the OBEX CORTEX 0500FR Class B Membrane and the 0771FR Class B Paste Adhesive were specified - critical to the installation achieving the required performance standards and fire-classification.New Homes: 1309Acres: 8Office Space: 12798 sq.mRetail Space: 2525 sq.m
Sponsored
Poplar Riverside, London

Poplar Riverside, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley GroupLocated on the banks of the River Lea, Poplar Riverside by Berkeley Group is set to become one of East London’s most vibrant neighbourhoods.It will feature over 2,800 new homes, a new 2.5 acre park and world-class resident facilities, including a commercial gym, a relaxing spa, and a public piazza for community events.As part of the façade package, OCL Façades installed the OBEX Class B Interface Sealing Membrane system, as specified for this project.Landmark Brickwork Ltd also installed the same system, namely 0500FR Class B Interface Sealing Membrane, complete with 0771FR Class B Paste Adhesive, ensuring that this development has the ultimate fully compliant, fully tested, façade interface sealing system.New Apartments: 2700Riverside Park: 2.5 AcresResidents Facilities: 16,000 Square Feet
Sponsored
Stockport Interchange, Stockport

Stockport Interchange, Stockport

OBEX Protection Ltd

Location: StockportMain Contractor: Willmott DixonStockport Interchange is a mixed-use development that will create a new state-of-the-art transport interchange, a two-acre town centre park and 196 new, high-quality residential apartments.The multi-million-pound project includes a rooftop park along with cycle paths and a footbridge linking the development with the town’s famous railway station.OBEX CORTEX 0270FR Score'N'Snap Cement Board system was specified, ensuring the project had a robust, durable, cement-based sheathing board, but without the considerable cost of traditional cutting equipment and dust extraction.Residential Apartments: 196Rooftop Park: 2 Acres
Sponsored
Kent Street, Birmingham

Kent Street, Birmingham

OBEX Protection Ltd

Location: BirminghamMain Contractor: WinvicBuilt on the former Kent Street Swimming Baths site in central Birmingham, the development will be home to four residential blocks, providing a total of 406 purpose-built apartments.The site once housed Kent Street Baths which opened in 1851 and was subsequently heavily damaged in the Second World War bombing of Birmingham.OBEX supplied the CORTEX 0270FR Score'N'Snap Cement Board system, ensuring the project had a robust, durable cement-based sheathing board, but without the considerable cost of traditional cutting equipment and dust extraction.Purpose-built apartments: 406Blocks: 4Storeys: 18
Sponsored
elZinc Rainbow Gold Protect - The Alchemist

elZinc Rainbow Gold Protect - The Alchemist

AccuRoof

A new gem has taken its place in the architectural playground that is Salford Quays in Manchester. Between the towers of MediaCityUK and Michael Wilford’s The Lowry, sits a small but perfectly formed gold parcel – a new home for The Alchemist, an innovative cocktail bar and restaurant.
Sponsored
Hilton Syon Park Waldorf Astoria Hotel, London

Hilton Syon Park Waldorf Astoria Hotel, London

nVent Thermal Management

M&E contractor ‘The All Group’ designed 2.5km RAYCHEM of HWAT-M self-regulating cables in a single pipe hot water system throughout the hotel. Controlled by RAYCHEM HWAT-ECO smart controllers, the system provided the benefits of energy efficiency plus savings in material costs, labour and space. Pipe freeze protection was delivered using 5.5 km of RAYCHEM WinterGard, controlled with RAYCHEM RAYSTAT-ECO-10. Underfloor heating was installed in the bedrooms, using RAYCHEM T2Red with T2Reflecta. In addition, RAYCHEM T2Quicknet 160 was installed in the en-suite bathrooms and the hotel’s luxurious spa.
Sponsored
SMARTPLY MAX FR B boosts fire protection at new affordable homes development in Hove

SMARTPLY MAX FR B boosts fire protection at new affordable homes development in Hove

MEDITE SMARTPLY

SMARTPLY MAX FR B has been specified and installed to provide enhanced fire protection at a new residential development at School Road, Hove in East Sussex. Built by PMC Construction, the affordable 104-home development is on the site of a former Westerman Industrial Works complex originating from the 1950’s.   The extensive project included the building of 21 town houses, and seven residential blocks. Block A features nine flats in a four to five storey structure, while blocks B, C and D feature 47 flats across four storeys. Blocks E, F and G consists of 17 flats and retail units spanning across three and four storeys. Such a feat required specialist, structural panels with reliable reaction to fire properties.  “The project was to supply and erect timber frames as part of the design and construction of 104 residential dwellings and three commercial units,” said Emma Barry, Project Co Ordinator at Gibbs Timber Frame. “We had worked with SMARTPLY products before, but on smaller projects that required enhanced fire protection.” Around 3,500 sheets of SMARTPLY MAX FR B were used in the project, covering over 8,900m2. “We chose SMARTPLY MAX FR B panels for the Cat B and Cat C buildings and decking because of its flame retardant properties. Crucially, the product is also suitable for EC5 Design and Cat 1 racking, which is just what we needed.” SMARTPLY MAX FR B is a structural, moisture resistant OSB/3 panel, which as well as having outstanding and reliable reaction to fire properties, is ideal for use in a range of applications where strength, moisture resistance and improved flame retardance are paramount. Unlike standard, structural OSB/3 panels, SMARTPLY MAX FR B is treated with a water-based, non-toxic flame retardant solution during the manufacturing process, which provides enhanced fire protection throughout the thickness of the panel. This means that even if it’s cut, the level of protection remains, unlike some post-treated panels.  SMARTPLY MAX FR B is CE certified according to EN 13986 and meets the requirements for load-bearing panels for use in humid conditions (Type OSB/3) as defined in EN 300 and Eurocode 5. The project began in January 2020 and is due to be completed in October 2021. Gibbs Timber Frame are manufacturers of high-quality timber frame structures with over twenty years’ experience in the construction industry. Their expertise ranges from luxury detached homes, specialised structures, bungalows, chalets, terrace housing, apartment blocks, commercial buildings and home extensions.  Find out more and keep up with them here: www.gibbstimberframe.co.uk  Discover more about the benefits of SMARTPLY MAX FR B here:
Sponsored
Convento P.P Capuchinos San Antonio de Padua, Spain - Pyroguard Protect

Convento P.P Capuchinos San Antonio de Padua, Spain - Pyroguard Protect

Pyroguard UK Ltd

Pyroguard’s technical expertise recently proved vital on the regeneration of the Capuchino Convent de San Antonio de Padua in Spain; a project which required a careful balance between renovating the historic building, ensuring modern fire safety regulations were met and being respectful of the Convent’s heritage.The ChallengeThe project presented teams with many challenges, mainly how to work within the parameters of a historic building and bring it in line with modern-day regulations, all while simultaneously respecting its heritage and aesthetics.When it came to the building’s compartmentation, an important part of any building’s passive fire protection strategy, the use of glass was key. To ensure that any new glazing was in keeping with the convent’s style and heritage, the Duramen System from AFVidrio was chosen – a timber frame with a varnished oak finish.The SolutionA bespoke EI120 fire resistance test was then carried out, using AFVidrio’s frame in collaboration with Pyroguard. This fire test was a critical phase of the project and provided assurances of the overall glazing system’s performance. Pyroguard’s expertise and technical knowledge was key in helping to design and pass the EI120 fire test, which featured its Pyroguard Protect fire safety glass.Another challenge of working within historic buildings, as opposed to a new development, is having to adapt the building products to suit the existing structure. On the Capuchino Convent de San Antonio de Padua project, a selection of the glazing units were semi-circular doors and other shaped glass, rather than the standard rectangular panes. Here, Pyroguard again demonstrated its technical expertise, supplying bespoke glass components to suit the on-site framework.
Sponsored
Unique refurb with slates gives UK windmill ultimate coastal weather protection

Unique refurb with slates gives UK windmill ultimate coastal weather protection

Cupa Pizarras

In a stunning architectural statement, CUPA PIZARRAS R17 slate has been specified to meet the design challenges of a former Georgian windmill renovation at Fort Green, near Aldeburgh in Suffolk. The first project of its kind in the UK, the natural slate was individually cut and fixed through expert craftsmanship to accommodate the building’s exterior curve while also providing crucial protection from the harsh coastal environment. Originally, the windmill walls were going to be clad in cedar shingles however, contractor ELC Roofing recommended using the rectangular CUPA R17 slate from CUPA PIZARRAS as a more weather-resistant alternative. ELC Roofing Owner, Edward Carlo, explains: “The R17 is a natural, non-carbonated blue-black slate with non-rusting metallic particles and thin laminations. From our perspective, it’s a tried and tested product that we specify and install on a lot of our projects – especially in coastal situations like this.” The slates, which protect against the salt water and wind, have been fitted on both the windmill’s curved wall, its pitched roof and elsewhere adding design details to the property’s walls. He goes on to say: “Aesthetically, the ocean environment has inspired the material choice with the slate mirroring the scales of a fish. This gives the windmill a dramatic architectural style; one that also sympathetically ties into the slate roof of the neighbouring cottage, which we replaced with CUPA R17 the previous year. “As far as I am aware, nothing like this windmill has been done in the UK. It was a case of starting from scratch to devise the optimum installation method, which involved a lot of detailed calculations.” For the tower, which has a 15m circumference at the base tapering to 11m at the top, the team initially removed the thick render on the windmill wall, taking it back to the original brickwork. Next, to meet the challenge of the curve and tapering of the wall, 50mm counter battens were fitted to the tower’s brickwork. Then, multiple strips of ply were cut and glued together to create the curve. These panels were screwed to the counter battens to provide an anchor for the fixing system. The ply was also primed to protect the surface from water ingress and a breathable membrane applied to protect the brickwork. In terms of fixing the slates to the panels, Edward said: “For a more corrosion and wind-resistant solution, I decided on the French technique of a stainless steel hook fixing system to install the slate, as opposed to nails.” Ensuring the layout worked exactly with the curves, the slate was lasered from top to bottom to perk it out, which took five days to do. Horizontal tiling battens were also marked to ensure the slates were fixed at the right height. Every single slate was cut and fixed individually to accommodate the curve and ensure they aligned with the building’s inset windows as well as other architectural details - a very precise process that required expert levels of craftsmanship. Preventing the slates from getting smaller at height, the team designed-in a series of lead bands that go all around the building at each storey level. These sit underneath the windows to create a consistent appearance visually. The windmill’s domed copper roof existed already and the adjoining tower, which is horizontally clad in a white weatherboard, features a slated pitched roof. ELC Roofing has again used CUPA PIZARRAS spanish slates. In this instance, the roof curves to the back end with four leaded hips to one end and two to the other with a connecting lead ridge. This time the slates were fitted to 20 x 50mm battens with a layer of permeable membrane. This part of the roof also features a striking onion-shaped finial. Expertly crafted by ELC Roofing, the finial is produced out of a patchwork of small pieces of soft copper, topped off with a fish that acts as a weather vane and includes stunning marble eyes. To the other side of the clad tower, CUPA PIZARRAS slate has been used to create a vertical square panel detail to the front of the building and fixed using the hook system again. Commenting on this challenging project, Edward said: “Work on site started before the first Covid-19 lockdown so as well as the challenging weather conditions that a coastal location like this presents, the team also had to complete the work with government guidance and restrictions in place. Regardless, the client is overwhelmed with the end result and so are we.” To find out more about the CUPA PIZARRAS range of natural slate visit: https://www.cupapizarras.com/uk/natural-slate-roofing/
Sponsored
Stylefold Hinged sliding folding glass moveable wall - Aberdeen, Clarksons Port Services offices

Stylefold Hinged sliding folding glass moveable wall - Aberdeen, Clarksons Port Services offices

Style - Moveable Partition Specialists

Style’s glazed folding wall system, the Stylefold 120, was recently installed at Clarksons Port Services’ new offices in Aberdeen, allowing a highly functional meeting room to be quickly created at one end of a large open-plan area. When not required, the wall can easily be folded back to merge the room seamlessly into the larger space.A leading expert in moveable wall systems, Style offers an extensive range of solutions for almost any location, including being the sole UK distributor for Dorma Hüppe, as well as for the revolutionary Skyfold vertical rising wall range.The Stylefold 120 folding wall installed at Clarksons is a simple, yet very effective solution for rapidly dividing space, with the glass panels maximising natural light whilst still delivering a 31dB acoustic rating for privacy. Clarksons Port Services is a division of Clarksons, the world’s leading integrated shipping services group. Having moved to larger premises at Aberdeen Harbour’s Matthew’s Quay, with a view to increasing efficiency and reducing carbon footprint, the integrated shipping and offshore services provider now has 1,600 sq metres of outdoor storage and 2,000 sq metres of customs bonded warehouse at this site.Style worked closely with architects, Philip Rodgers Design, and contractor, TransForm, to deliver a partitioning solution for the new offices that successfully combines functionality with exceptional aesthetics. Making minimal impact on the existing structure, the Stylefold 120 is easy to install wherever an economical retrofit solution is required. “The Stylefold 120 folding wall is smooth and effortless to manoeuvre, whilst the anthracite finish specified at the Aberdeen offices perfectly complements the contemporary interior design,” said David Louden, Style’s director for Scotland.“The addition of an integrated pass door means that it is entirely practical to leave the private meeting room in situ for long periods, if desired.”
Sponsored
Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis Acoustic Flooring at The Market Building, Brentford London

Soundis

In 2015, Quinn London Ltd started the refurbishment of The Market Building, in Brentford which involved the conversion of Offices to residential dwellings as a ‘Material Change of Use’ project. Soundis provided acoustic solution options for this project, in order to ensure a cost effective Value Engineering Exercise, on behalf of the Main Contractor.As the 1st floor required a deep void system due to new soil pipes and waste pipes having to be installed along the corridor within the building for kitchens and bathrooms, it was agreed to utilise Soundis Cradle & Batten System. This provided a service void for the pipes of 300mm whilst the other areas of the floor were treated with the system at 80mm FFH. The Soundis cradle & batten acoustic floor was then overlaid with a Soundis a high quality, interlocking dry screed system gypsum fibreboard.The Soundis cradle & batten floor system has been installed on the existing concrete and existing timber structural floors to provide a level floor over the un-even sub-deck. The service void provided by Soundis cradle & batten system can be used for other flooring applications, such as underfloor heating.Our Cradle and Risers are manufactured from 100% recycled materials assisting to the sustainability targets of projects.
Sponsored
Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

Construction Specialties (UK) Ltd

Featuring the UK’s longest indoor real-snow ski slope, Soar at Intu Braehead is Scotland’s largest retail and leisure complex, attracting up to 17 million people every year. Construction Specialties were asked to provide an expansive entrance mat for the centre’s main entrance. The chosen product was CS’ Pediluxe entrance mat with Platinum covered exterior grade carpet inserts. They have stronger bristle than interior grade carpet inserts, assuring dirt and moisture is effectively removed from the soles of shoes. This enormous entrance mat strongly protects interior floor surfaces and maintenance budgets from foot and wheeled traffic.
Sponsored
Kings Cross Underground Station, London

Kings Cross Underground Station, London

Howe Green

Over 60 of Howe Green’s 7500 Series floor access covers were chosen for the development of a sizable extension of King’s Cross tube station. An access solution was required to provide access to essential under floor services including ventilation ducting, electrics, communication cables and rail services. The specification required a solution that would prevent the passage of fire through service channels. Howe Green’s 7500 Series access covers met requirements with a three hour fire rating. In addition to single covers, Howe Green’s innovative multi-part covers were also used.
Sponsored
Protect your building against wind driven rain, a common source of moisture affecting buildings in the UK

Protect your building against wind driven rain, a common source of moisture affecting buildings in the UK

SureCav Ltd

Damage from the build up of moisture results in mould, mildew and condensation on windows and in the loft space. Additionally, where there is a moisture problem in the wall cavity, damage readily occurs to the insulation and wall ties, affecting wall plates, the timber frame itself and installed joinery. Preventing this from occuring is obviously a priority in the minds of all designers and builders interested in quality construction. SureCav Provides the Solution. By building with the SureCav panels instead of a using a block leaf you are providing a barrier to protect from wind driven rain.
Sponsored
Protecting a primary school from water damage by providing a leak detection system

Protecting a primary school from water damage by providing a leak detection system

Andel Ltd

After a prestigious school near Birmingham suffered extensive damage when a leak went unchecked, we installed our award-winning leak detection system to prevent future devastationA tiny leak left to escalate at St George’s in Edgbaston ruined thousands of pounds of property and equipment and left the school without a properly functioning IT department. Leaks within buildings are very common and if not monitored can cause extensive damage, disruption and loss. So, once the school was back on its feet, we were delighted to work with their insurer, Hettle Andrews, to make sure the property was protected against future flooding. St George’s School, EdgbastonSt George’s School is a fully co-educational independent day school for children from ages three to 18 in Edgbaston, near Birmingham. Established as a charitable trust, the school opened in September 1999 as Birmingham’s first independent school to offer a complete education for boys and girls from kindergarten through to the sixth form.We worked with their insurance broker, Hettle Andrews, who facilitated the project. Hettle Andrews works primarily with schools, universities, colleges and charities. In the winter of 2021, the boiler in the room above the IT department of the school began to leak. The school was closed for the holiday period so no one went on-site and the leak went undetected. On return to the school in the New Year, staff discovered the leak which by that point had caused extensive damage.  The leak had not only destroyed the ceiling and light fittings but the whole IT department below including computers, carpets, plug points and furniture. The challengeNo warning: this was the first time anything like this had happened. There were no warning systems in place, nor were there any preventative measures. Extensive damage: the full ceiling had to be replaced, along with expensive light fittings, computers and IT equipment.Inconvenience: it resulted in substantial inconvenience and downtime for the department which in turn affected its daily function within the school.Disruption: the IT department had to be relocated elsewhere in the building, along with any remaining functioning equipment. Time-consuming process: while the damages were being claimed on insurance, the room was cleared and de-humidifiers installed to try and remove any remaining moisture.The solution;Andel Floodline®Andel's unique, award-winning water, oil and gas leak detection and monitoring solution. We are one of the global market leaders in leak detection systems and we knew our Floodline® solution would be a perfect fit. It is a true hybrid that can report to a single integrated control panel – unlike some other systems that require different alarm panels for different types of leak detection.Floodline® covers all possible leak detection requirements, from single-zone to multi-zone and distance measuring systems, with the capability to protect the largest of buildings, both old and new. Floodline® systems allow additional zones, sensors and upgrades to be added easily and cost-effectively so it is future-proof. So, we installed Floodline® SVCP – 2-Valve Control and Floodline® 1-Zone Leak Detection System. This means the school is now able to: Easily monitor all the Floodline® leak detection sensors installedEasily monitor the display LEDs which provide clear alarm information and system status for both leak detection and system faultHave peace of mind knowing the solenoid valve control panel will immediately close two solenoid valves in the event of a leak, ensuring the water source is stopped, preventing any damageBe alerted quickly as there is an audible alarm with a mute functionBe alerted when away from the property as output relays connect to a GSM communicator which sends out an SMS.The result;Bespoke solution: we were delighted to be able to come up with a tailored solution for St George’s School. Early warning: the boiler room at St George’s Edgbaston is now equipped with a bespoke leak detection system that will give early warning should there be any escaping water detected.Confidence: the client feels relieved and more confident now that our leak detection systems have been installed. Peace of mind: knowing they will no longer have to worry about leaks especially when there is no one on-site. Futureproofed: the school knows their chances of this occurring again and their building and equipment being unprotected have now drastically dropped. Community: as schools are the hubs of most communities, the last thing we want is for their day to day operations disrupted by escaping water, something which can be detected early and solutions provided easily. We are proud to have been involved in this project alongside Hettle Andrews and hope to work with more of their clients in future to provide proactive solutions.What the customer said;“We are relieved and more confident now that our leak detection systems have been installed. It has given us peace of mind, knowing we no longer have to worry about any leaks going undetected and resulting in catastrophic damage. The chances of this occurring again, meaning our building and equipment is unprotected, have now drastically dropped. We are really happy with the services and products provided by Andel and would happily recommend them.”Patrick Ryan, Maintenance Manager, St George’s School
Sponsored
New Public Services Hub to open its doors in Ellesmere Port

New Public Services Hub to open its doors in Ellesmere Port

Metal Technology Ltd

'The Portal' is a new £16 million public services hub in Ellesmere Port, delivered by Vinci Construction UK for Cheshire West and Chester Council. The new facility will be home to more than 500 council and public sector staff, a Job Centre Plus and a Citizen’s Advice Bureau.The building has been constructed with many environmentally friendly elements including solar panels, air source heat pump and electric vehicle charging points. The Portal’s envelope is wrapped at the top and bottom with an attractive, copper coloured metal cladding and a newly formed public realm area will surround the exterior, with bench seating and green landscaped sections.Internally, 'The Portal' consists of large open plan working areas with smaller subsection meeting rooms, break out and kitchen spaces which are present on each level and a main central staircase for circulation.Metal Technology Ltd supplied its 10-35Hi+ commercial entrance doors and System 17 capped curtain walling for the large, glazed sections of the build to approved fabricator and installer RED Systems Limited.Due to open its doors in Spring, it’s fantastic to have been involved in this state-of-the-art, commercial project, which is a catalyst for the wider Ellesmere Port Town Centre regeneration master plan.
Sponsored
Paintworks Bristol

Paintworks Bristol

Marshalls Landscape Protection & Street Furniture

Bristol Paintworks is a hugely successful brownfield renovation project, transforming a decaying, disused industrial site into a thriving place to live and work.The scheme’s concept was founded on nature, with a desire to create a subtle Mediterranean look and feel using appropriate planting, landscaping and paving. Marshalls Modal Paving and Natural Elements benches were chosen to help complete the vision.
Sponsored
New Garden Square, Birmingham

New Garden Square, Birmingham

OBEX Protection Ltd

Location: Edgbaston, BirminghamMain Contractor: Winvic ConstructionNew Garden Square commenced in October 2021 and is scheduled to reach completion in June 2024. The project comprises three towers which reach to 9, 10 and 13 storeys.Public spaces in the New Garden Square neighbourhood include a new one-acre central park, along with a striking arrival pavilion building at the site’s gateway, and new shops, cafes and restaurants throughout the siteOBEX Score’N’Snap Cement Sheathing Board System was specified for this prestigious project, eliminating the need for dust control and drastically reducing the cost and time of installation.State-of-the-art Homes: 398Apartment Blocks: 3Storeys: 9,10 and 13
Sponsored
The Perfume Factory, North London

The Perfume Factory, North London

OBEX Protection Ltd

Location: LondonMain Contractor: Telford HomesThe Perfume Factory is a new mixed-use development in North Acton, London. The development will deliver 374 new homes and 1,403 sqm of commercial floor space across three residential towers comprising 12, 16 and 25 storeys, as well as public realm improvement.This development is over 18m tall, so required the OBEX CORTEX 0500FR Class B Membrane to comply with the regulations. This membrane is tested to EN13984, so also meets the required water-penetration performance standard.Towers: 3New Homes: 374Commercial Floor Space: 1403 sqm
Sponsored
West End Gate, London

West End Gate, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley Homes LtdWest End Gate is a mixed-use development by Berkeley Homes Ltd on Edgware Road in London W2, near the prestigious neighbourhoods of Marylebone and Little Venice.The development comprises 844 apartments (including 175 affordable), 8 shops and a restaurant, along with a new public plaza and improvements to Edgeware Road Junction.The full OBEX CORTEX Class A Through-Wall System has been specified on this project, including fire-classified Breather Membrane, Vapour Control Layer, Interface Sealing Membrane system, and the Score'N'Snap Cement Board system.With each OBEX product carrying a Class A fire-classification, it puts this façade installation by OCL Facades Ltd at the pinnacle of full compliance and highest performance.Residential Apartments: 844Buildings: 8Storeys: 29
Sponsored
Sainsbury’s Store, Cheltenham - Effective pavement protection

Sainsbury’s Store, Cheltenham - Effective pavement protection

Tobermore

The strong interlocking capabilities of Tobermore’s Toberloc block paving proved to be the ideal solution for Daniel Hurd Associates who required a product that could handle regular pedestrian and vehicular use at this Sainsbury’s branch in Cheltenham.

Showing 181-216 of 683

Feedback