NBS Source
I'm a manufacturer

New Garden Square, Birmingham

OVERVIEW

Location: Edgbaston, Birmingham

Main Contractor: Winvic Construction


New Garden Square commenced in October 2021 and is scheduled to reach completion in June 2024. The project comprises three towers which reach to 9, 10 and 13 storeys.

Public spaces in the New Garden Square neighbourhood include a new one-acre central park, along with a striking arrival pavilion building at the site’s gateway, and new shops, cafes and restaurants throughout the site

OBEX Score’N’Snap Cement Sheathing Board System was specified for this prestigious project, eliminating the need for dust control and drastically reducing the cost and time of installation.


State-of-the-art Homes: 398

Apartment Blocks: 3

Storeys: 9,10 and 13



No featured products in this case study

Contact OBEX Protection Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from OBEX Protection Ltd

View inspiration
Oval Village, London

Oval Village, London

The Perfume Factory, North London

The Perfume Factory, North London

Kent Street, Birmingham

Kent Street, Birmingham

Wood Wharf B2, Canary Wharf

Wood Wharf B2, Canary Wharf