OVERVIEW
Location: Edgbaston, Birmingham
Main Contractor: Winvic Construction
New Garden Square commenced in October 2021 and is scheduled to reach completion in June 2024. The project comprises three towers which reach to 9, 10 and 13 storeys.
Public spaces in the New Garden Square neighbourhood include a new one-acre central park, along with a striking arrival pavilion building at the site’s gateway, and new shops, cafes and restaurants throughout the site
OBEX Score’N’Snap Cement Sheathing Board System was specified for this prestigious project, eliminating the need for dust control and drastically reducing the cost and time of installation.
State-of-the-art Homes: 398
Apartment Blocks: 3
Storeys: 9,10 and 13
Contact OBEX Protection Ltd by clicking the button below to find out which products were used in this case study.
Oval Village, London
The Perfume Factory, North London
Kent Street, Birmingham
Wood Wharf B2, Canary Wharf