M&E contractor ‘The All Group’ designed 2.5km RAYCHEM of HWAT-M self-regulating cables in a single pipe hot water system throughout the hotel. Controlled by RAYCHEM HWAT-ECO smart controllers, the system provided the benefits of energy efficiency plus savings in material costs, labour and space. Pipe freeze protection was delivered using 5.5 km of RAYCHEM WinterGard, controlled with RAYCHEM RAYSTAT-ECO-10. Underfloor heating was installed in the bedrooms, using RAYCHEM T2Red with T2Reflecta. In addition, RAYCHEM T2Quicknet 160 was installed in the en-suite bathrooms and the hotel’s luxurious spa.
Contact nVent Thermal Management by clicking the button below to find out which products were used in this case study.
The Rolex Building, London
Charters Ascot -Luxury Private Residences
The Rolls Building, London
Pinderfield & Pontefract Hospital, Yorkshire