OVERVIEW
'The Portal' is a new £16 million public services hub in Ellesmere Port, delivered by Vinci Construction UK for Cheshire West and Chester Council. The new facility will be home to more than 500 council and public sector staff, a Job Centre Plus and a Citizen’s Advice Bureau.
The building has been constructed with many environmentally friendly elements including solar panels, air source heat pump and electric vehicle charging points. The Portal’s envelope is wrapped at the top and bottom with an attractive, copper coloured metal cladding and a newly formed public realm area will surround the exterior, with bench seating and green landscaped sections.
Internally, 'The Portal' consists of large open plan working areas with smaller subsection meeting rooms, break out and kitchen spaces which are present on each level and a main central staircase for circulation.
Metal Technology Ltd supplied its 10-35Hi+ commercial entrance doors and System 17 capped curtain walling for the large, glazed sections of the build to approved fabricator and installer RED Systems Limited.
Due to open its doors in Spring, it’s fantastic to have been involved in this state-of-the-art, commercial project, which is a catalyst for the wider Ellesmere Port Town Centre regeneration master plan.
Contact Metal Technology Ltd by clicking the button below to find out which products were used in this case study.
Clifton House, Glasgow
Merit House, Edgeware Road, London
Metal Technology exemplifies best practice at Leeds College of Building
Metal Technology systems used in landmark £41m Health Innovation Campus at Lancaster University