NBS Source
I'm a manufacturer

"hot water and oil filled radiators and fittings"

5,996 results found

Sort by:

Showing 1009-1044 of 1128

Sponsored
Leicester racecourse washroom revamp

Leicester racecourse washroom revamp

KWC DVS Limited

Leicester racecourse has recently undergone a revamp of their washrooms, and Franke Water Systems were proud to be the chosen supplier. The Racecourse grounds cover 220 acres of beautiful greenery, and it holds 30 race meetings a year. The full range of products provided was:1 x ANMW411 Quadro single washbasin2 x ANMW421 Quadro double washbasins5 x F3SV1001 F3 self-closing mixer taps3 x F3190 hand dryers with satin finish6 x CHRX669 Jumbo toilet roll holders4 x RODX618 Rodan touch-free soap dispensers
Sponsored
HPS geotextile protection in Landfill

HPS geotextile protection in Landfill

Geofabrics Ltd

Geofabrics HPS17 is installed as the protection geotextile at Erin Landfill Site, a former colliery near Chesterfield. The geotextile formed part of a large cell measuring approximately 40,000m². The site also involved installation of 1000m of deep water drainage, 118,000m² of impermeable membrane, 1000m of fully-welded leachate pipework and 14,000 tonnes of drainage stone. Geofabrics HPS17 is a thick needle punched non-woven geotextile manufactured from 100% virgin polypropylene high tenacity fibres containing 1% active carbon black.
Sponsored
Permeable paving provides the SuDS solution for a Social Housing development

Permeable paving provides the SuDS solution for a Social Housing development

Brett Landscaping

Early on in the design of this Social Housing scheme at Stump Cross, Pontefract, it was decided that only a permeable pavement would work as the SuDS solution for this development. As the existing drainage infrastructure in the area was already working close to its capacity any additional run off from this developments could cause surface water flooding. Swales and ponds were not be feasible as there was insufficient space available for them. A permeable pavement was therefore chosen as there was no additional land take involved. To view the whole case study please click the link below.
Sponsored
Permeable paving provides the SuDS compliant solution to the car park of a distribution centre in Yorkshire

Permeable paving provides the SuDS compliant solution to the car park of a distribution centre in Yorkshire

Brett Landscaping

As part of their flood prevention strategy Bassetlaw District Council required the distribution centre to be fully SuDS compliant . Logistics and warehousing company DB Symmetry requested that the hard-landscaping for their car park must be a permeable solution, so a sustainable drainage system (SuDS) was designed. Permeable paving was chosen as a key part of the overall surface water drainage strategy as this achieved all of the requirements of the planning team, while maximising the use of the land available for the project for the client. To view the whole case study please click the link below.
Sponsored
Tesco Case Study

Tesco Case Study

Dart Valley Systems Ltd

Throughout many years, Dart Valley Systems continue to improve washroom facilities and assist in saving water and money across Tesco stores nationwide.The push taps installed in the washrooms were running longer than required. DVS recommended automatic taps as the lifetime is longer and potentially, up to 30% savings can be made. Even though flow rates may be similar, automatic taps will only run when they are detecting hands. See table below detailing estimated savings at this store when using automatic taps.
Sponsored
The New BBVA  Headquarters - Madrid

The New BBVA Headquarters - Madrid

EFFISUS

The new BBVA Headquarters is located in the northern outskirts of Madrid. The complex comprises an intricate network of buildings, patios and gardens. The buildings were designed to optimize the use of natural light and provide visualization of green areas within the work environment. The main building is easily recognizable by its geometrically shaped brise-soleil and its rounded silhouette central tower. The Effisus Ecofacade membranes were used to seal the connections of the glass elements to the facade, guaranteeing water and air tightness, optimizing the energy efficiency of the building.
Sponsored
Northamptonshire Schools

Northamptonshire Schools

Sika Sarnafil

Financed by county council capital funds, Northamptonshire County Council undertook a multi-million pound remedial works programme on a number of schools originally built in the 1960’s and 1970’s. All of the buildings were suffering from some degree of water ingress, and the roofs needed to be brought in line with current building regulations for improved thermal performance. Sika Sarnafil’s specialist roofing contractors installed over 50,000m2 in light and lead grey of G410-18EL single ply membrane to the school roofs.
Sponsored
V&A Museum, Dundee

V&A Museum, Dundee

Sika Sarnafil

Spanning an impressive 8,500m2, the three-storey building makes a striking centrepiece on the water’s edge. With its BREEAM requirements, waterfront position, and proximity to the coast, it was essential that the building’s roof be designed and installed to meet sustainability criteria, whilst being watertight and robust to withstand the elements. As the system needed to exceed a lifespan of 20 years in a coastal region, Sarnafil specified its thickest membrane with a 25-year guarantee – a 2mm membrane, Sarnafil HD, to withstand the elements on the main field area which it currently is doing extremely well.
Sponsored
River Eden, Carlisle - Underwater Concrete

River Eden, Carlisle - Underwater Concrete

Sika Limited

To repair the deteriorating riverbed was a specialist one which made both local and national news.Situated in Carlisle, Cumbria, the River Eden railway viaduct recently required an urgent repair solution to the deteriorating riverbed condition, where trains were having to operate at reduced speeds of 20mph over the Victorian and 1940s-built structures.Detailed laser surveys carried out by Network Rail showed fast flowing water on the River Eden had caused parts of the riverbed to wash away, posing a risk to the viaduct foundations.
Sponsored
Traditional Textures Copper Patina - Cheese Barge, Paddington Canal

Traditional Textures Copper Patina - Cheese Barge, Paddington Canal

Metal Solutions Limited

British Land commissioned Adam Richards Architects to design a custom-built barge for a new London restaurant, The Cheese Barge. The floating restaurant creates a distinctive focal point and destination for Paddington Central and the wider area. The boat’s curving, sloping roof is clad externally in Traditional Textures Copper Patina Precoated Aluminium metal to replicate aged copper. On the underside of this roof, a copper colour is visible from inside the boat, creating a warm and convivial interior as it gathers the light reflected off the surface of the water.
Sponsored
Creating a Vibrant and Attractive Office Environment, Including the Roof!

Creating a Vibrant and Attractive Office Environment, Including the Roof!

Iko Ireland

A detailed visual and physical inspection, together with core and moisture probe analysis carried out by IKO on the roof, patio and walkway areas, indicated that the waterproofing membrane was in a condition commensurate with the age and the type of the traditional membranes installed. They had become fragile and brittle. The decks were saturated due to water ingress, and natural ageing had played a principle part in the deterioration of the waterproofing system. The build-up would not have met the requirements of the current building regulations Part L. IKO worked to refine the specification for the main roof,
Sponsored
Asbestos Roof Coating Project in Hereford using BBA Approved Asbestoseal

Asbestos Roof Coating Project in Hereford using BBA Approved Asbestoseal

Liquasil Ltd

The asbestos cement roof to this industrial unit in Hereford was heavily contaminated with moss and lichen and was leaking in numerous places. The moss and other vegetation was first dampened down, scraped off and placed into designated asbestos waste bags for licensed disposal. The roof was then steam cleaned. All metal fixings were treated with Liquasil's rust primer and sealed with Non-Sag Sealer. Small holes and cracks were sealed with Non-Sag Sealer. The entire roof was then coated with Asbestsoeal 20 and is now resistant to moss growth and water leaks.
Sponsored
Asbestos roof coating installation Birmingham

Asbestos roof coating installation Birmingham

Liquasil Ltd

This asbestos roof is being cleaned using a closed box pressure wash, with all waste water being filtered and recovered for re-use. Once cleaned, the roof is coated with the BBA Approved Asbestoseal system which includes: SWT CORROSION PRIMER - fully rust and wet tolerant, the primer is applied to all metal fixing to stop further corrosion. NON-SAG SEALER - is applied to all fixings and small holes and cracks to permanently seal them. ASBESTOSEAL 20 is brush applied to the roof sheets to provide a new finish.
Sponsored
Metal roof and cladding coating using Liqausil's BBA Approved Metalseal

Metal roof and cladding coating using Liqausil's BBA Approved Metalseal

Liquasil Ltd

Metalseal 20 was specified to re-brand a small industrial estate in Swindon. Roofs and external cladding were all stripped of existing finishes using vapour blasting. Cut edge corrosion was treated using SWT Primer and all metal surfaces were coated with BBA Approved Metalseal 20 roof & cladding coating. The finish is now graffiti proof, with any graffiti simply washing off with water, with no ghosting residue. The project is covered by the unique Liquasil latent defects insurance guarantee (including cover for professional design).
Sponsored
Hardwood Timber Tiles - Tunbridge Wells

Hardwood Timber Tiles - Tunbridge Wells

Wallbarn Ltd

This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.
Sponsored
Decking Pedestals & Green Roof System - Kensington

Decking Pedestals & Green Roof System - Kensington

Wallbarn Ltd

A good example of the before and after effects of laying a sedum roof garden and accompanying deck and paved area onto a small domestic roof terrace. All these products are designed to sit on top of the waterproof membrane (in this case single ply) there was no issue of damage to the roof. The support pads lifted the decking off the roof, eliminating the risk of the timber piercing the membrane, and drainage was maintained through the roof surface since the green roof system has a cavity beneath its own reservoir and drainage layer to allow water run-off.
Sponsored
Colour Coding System

Colour Coding System

BROEN-LAB

The media indications on the handle are structured according to the EN13792. This means that laboratory employees immediately are able to recognize the media and can operate the equipment with confidence Zone 1 Indicates the kind of media going through the product. Green for water, yellow for flammable gaseous hydrocarbons, black for tonic gases etc. Zone 2 Indicates the direction to turn the handle in order to increase or decrease volume pressure. Zones 2 and 3 shall be circular. Zone 3 An abbreviation or description of media. The diameter of zone 3 shall be at least 7mm.
Sponsored
How to install a hand dryer

How to install a hand dryer

Heat Outdoors & Handy Dryers

If you’ve never fitted a hand dryer by yourself before, you’re in the right place. To make your hand dryer installation an absolute breeze, follow our simple six-step guide.
Sponsored
Ultra-rapid Eiger Door installation keeps food service depot operational and help cut energy costs

Ultra-rapid Eiger Door installation keeps food service depot operational and help cut energy costs

Union Industries

Union Industries’ engineers acted almost as fast as its rapid roll industrial doors to ensure one of its Eiger freezer doors was fitted in record time at Total Foodservice Solutions.
Sponsored
Cornell house, Wothorpe

Cornell house, Wothorpe

Trespa UK Ltd

This private house stands in an exclusive part of Stamford, which is a beautiful historic Georgian Town in Lincolnshire (UK). The architectural style is very contemporary for that region but fits in a unique and attractive way with the surroundings.
Sponsored
MODERN HOTEL ARCHITECTURE MEETS OLD MASONRY

MODERN HOTEL ARCHITECTURE MEETS OLD MASONRY

KEUCO

The Störmede Rittergut, a manorial estate in Geseke, North-Rhine-Westphalia, is a special location for conferences and private events. On its extensive grounds, alongside the listed buildings, a modern hotel has been erected. Behind a wood-clad façade, 55 highly modern and simultaneously very comfortable rooms can be found. Already in the foyer the guest is met by a warm atmosphere, something contributed to not least by the use of great expanses of wood, a friendly colour palette and stylish furniture. The style of the house has been logically extended: high quality and modern, but still inviting feelings of pleasure.A subtle and well-chosen selection of furnishings spreads the harmonious impression throughout the house. In every room, in the semi-public toilet facilities and in the spa area, KEUCO fittings and accessories can be found. They underline the fine, high-quality tone of the interior design. The slender EDITION 400 fittings match the single or double basins harmoniously. IXMO fittings by KEUCO were chosen for the showers because of their minimalist appearance. The special thing about IXMO: the fittings unite several functions in the smallest possible space with a minimalist design. In this way, the Hotel Rittergut Störmede maintains a clear and comprehensible appearance in its showers. IXMO SOLO, a clever combination of single-lever mixer and wall outlet for shower hose in a single unit, is particularly impressive for its ease of use. The consistently modern approach continues in the WC accessories in the bathrooms. Here, the well designed forms and high-quality surfaces of EDITION 400 accessories by KEUCO set a special tone.The Hotel Rittergut Störmede exudes a unique atmosphere with its historical roots and, thanks to its excellent furnishings, offers the guest an extra special stay.
Sponsored
Cibes Air installed in stunning Northumberland village, Ponteland UK

Cibes Air installed in stunning Northumberland village, Ponteland UK

CIBES Lift UK

When building their forever home, Cibes Lift UK’s latest customers decided on including a Cibes Air platform lift. Guaranteeing they future-proofed themselves and their property from any potential mobility issues was a key consideration of their projected build.The customisability of the Cibes Air allowed for a perfect fit within the clients’ aesthetical palette and has since become a focal point of their new entrance hallway.Having the opportunity to design their home from scratch they benefited from a smarter, cleaner, and more flexible blueprint with the unique ergonomic design of the Cibes Air fitting effortlessly within their space. Simultaneously complimenting their lifestyle with its timeless Scandinavian design.Thanks to the modular design of The Cibes Air, your lift can be installed in as little as 2 to 3 days, with minimal structural intrusion making it perfect for renovation projects or just like our latest clients, building a home from scratch.The couple were able to find the perfect combination of colour and texture to fit in with their style, finishing their Cibes Air with a granular bamboo back plate and surestep black seagrass flooring.The panelled glass door fits seamlessly with the other modern architectural features of the home and supports in accentuating natural daylight throughout the property.A combination of intuitive design and timeless elegance makes the Cibes Air the perfect choice for a future-proofing endeavour. The Cibes Air home lift comes with a breadth of personalisation to ensure you can create the lift of your aesthetical dreams.Designed with wood, fabric, and metalClose to 300 different coloursLift shaft with panoramic glazingAvailable in 17 platform sizesReduced work and building costsMinimal interruption of your daily life
Sponsored
Cibes Air installed in stunning Northumberland village, Ponteland UK.

Cibes Air installed in stunning Northumberland village, Ponteland UK.

CIBES Lift UK

When building their forever home, Cibes Lift UK’s latest customers decided on including a Cibes Air platform lift. Guaranteeing they future-proofed themselves and their property from any potential mobility issues was a key consideration of their projected build. The customisability of the Cibes Air allowed for a perfect fit within the clients’ aesthetical palette and has since become a focal point of their new entrance hallway. Having the opportunity to design their home from scratch they benefited from a smarter, cleaner, and more flexible blueprint with the unique ergonomic design of the Cibes Air fitting effortlessly within their space. Simultaneously complimenting their lifestyle with its timeless Scandinavian design. Thanks to the modular design of The Cibes Air, your lift can be installed in as little as 2 to 3 days, with minimal structural intrusion making it perfect for renovation projects or just like our latest clients, building a home from scratch. The couple were able to find the perfect combination of colour and texture to fit in with their style, finishing their Cibes Air with a granular bamboo back plate and sure step black seagrass flooring. The panelled glass door fits seamlessly with the other modern architectural features of the home and supports in accentuating natural daylight throughout the property. A combination of intuitive design and timeless elegance makes the Cibes Air the perfect choice for a future-proofing endeavour. The Cibes Air home lift comes with a breadth of personalisation to ensure you can create the lift of your aesthetical dreams. Designed with wood, fabric, and metal Close to 300 different colours Lift shaft with panoramic glazing Available in 17 platform sizes Reduced work and building costs Minimal interruption of your daily life.
Sponsored
Stegermatt Leisure Pool

Stegermatt Leisure Pool

Villeroy & Boch - Tiles Division

More than 5,000 m² in porcelain stoneware for Germany’s largest leisure pool – Villeroy & Boch tiles in the Stegermatt Swimming Pool in OffenburgSport, wellness and leisure spanning more than 10,000 m² – the largest leisure pool in Germany, Stegermatt Swimming Pool in Offenburg, opened in late July 2017. Along with an outdoor area with 50-metre swimming pool, wave slide and adventure pool, indoor visitors can look forward to a fitness courses pool, a teaching pool, a diving pool with two diving platforms and a 25-metre competition pool. The sauna landscape comprises a variety of saunas, a steam bath and a cold-water area with adventure showers and a plunge pool. The developers for the project were the City and Technical Operations of Offenburg. 4a Architekten of Stuttgart were the architects in charge of planning for the project. The tiling work, with a volume of EUR 2.5 million, was performed by the Freiburg subsidiary of Fliesen Röhlich GmbH; with a staff of around 300 professional layers of tile and natural stone, the company is considered the largest tile specialist in Germany. For an entire year, this major project in Offenburg had 15 employees working constantly, increasing to 25 in peak periods. As a result, in spite of at times difficult weather conditions, the work was completed on time.  With the exception of the swimming pools themselves, the entire bathing level, including the changing rooms in the interior of the facility, was designed in the X-PLANE range of vilbostone porcelain stoneware by Villeroy & Boch Tiles. The range features a trendy concrete look with fine colour gradations. Spanning an area of 5,000 m², cream-coloured tiles in the two modular formats of 30 x 60 cm and 15 x 60 cm were laid in a brickwork-effect pattern, creating a space with a harmonious and at the same time vibrant look. Another approx. 600 m² of matching mosaic tiles were also used. With the special 5 x 5 cm format and a slip-resistance class of R10 they are suitable for use in shower areas.
Sponsored
Alumet HQ

Alumet HQ

Knauf Insulation Ltd

CHALLENGEAs part of a full exterior refurbishment, building envelope contractor, Alumet, required a new façade system that would transform and modernise the exterior of the Jubilee House building, which was originally installed in the early 1970s. Coupled with this was the requirement to improve thermal and energy efficiencies.SOLUTIONKnauf Insulation supplied its Rocksilk® RainScreen Slab to ensure optimal fire, thermal and acoustic performance. The key to Knauf Insulation securing the project was the ability to provide in depth technical support, including complex 3D heat flow modelling calculations which took into account the specific system brackets, which act as a significant cold bridge within rainscreen cladding systems.Knauf Insulation’s Rocksilk® RainScreen Slab was installed on the brick facade of the existing building, which once complete, significantly improved the U-value thus reducing the heat loss through the wall.The insulation layer is a fundamental component of any successful rainscreen cladding system and mineral wool insulation delivers a number of advantages for this type of application. Rocksilk® RainScreen Slab is a Rock Mineral Wool slab containing a water repellent additive, designed for use on masonry wall constructions and as the outer insulation layer in steel frame projects.Quick and easy to install, the product is simple to cut and the slabs knit together to create a snug fit, with no need to tape the joints as may be required with rigid foam boards – ensuring maximum acoustic and thermal performance."We wanted to turn our headquarters into a thermally efficient building and to really project a modern ‘green’ image. The Schueco Façade system, along with Knauf Insulation’s products, helped us to achieve this as well as dramatically reducing our carbon output.We have received some fantastic feedback from local residents saying how good the new façade looks and coupled with the improved thermal efficiencies, we are very pleased."- Alumet Director, Dean Walton
Sponsored
Conquest Hospital, St Leonards-on-Sea

Conquest Hospital, St Leonards-on-Sea

Rapid Ramp Limited

PROJECT BACKGROUND:As pressure continues to build on the UK’s health service, Conquest Hospital's Emergency Department urgently needed to transform their current staff welfare area with additional space, achievable with a modular extension.The design included a canteen space, toilets, shower rooms, storage areas and lockers for NHS staff.REQUIREMENT:External developments included an accompanying ramp to overcome the exterior door threshold. The works needed to be achieved within a quick turnaround time and with minimal disruption to the daily running of the department.SITE SURVEY & DRAWINGS:We responded rapidly with a site survey soon after the initial enquiry.This project benefitted from the Lidar scanning technology used by our site surveyors.The machine scanned and plotted the heights and widths of the objects in view, including different floor levels.Our in-house designer then created a 3D visual of the ramp on top of the lidar model, ensuring to draw around any obstructions.The final 3D & 2D drawings were after given to the client with their quotation.END RESULT:Once the extension was near completion, the ramp was fitted in an L shape configuration within a day, minimizing disruption.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder Coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURES INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.
Sponsored
Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Rapid Ramp Limited

BACKGROUND: The Pavilion was being refurbished, ready to be re-open as a new café to help increase tourism to the town.Plans included creating a new terrace at the front, a small rear extension, and a portable office/store at the back.REQUIREMENT: A modular ramp to the terrace for pedestrian and wheelchair use. END RESULT:Our installers fitted a Rapid Ramp, which included a pedestrian walkway with a loading capacity of 1,000kgs. It is designed to safely support the weight of varies public traffic, including walkers, prams, wheelchairs, and mobility scooters.The installation was completed within a few hours on a snowy late evening.FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate threshold heights.Continuous Handrail - this handrail system ensures users always have a support to hold onto.Standard Colour Black - ramps are powder-coated black to create a hard finish that is tougher than conventional paint.EXTRA FEATURES INCLUDED:Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and helps users distinguish any level changes.CONCRETE VS PEDESTRIAN METAL RAMP INSTALLATIONS:Unfortunately, newly poured concrete must be protected from freezing for the first 24 to 48 hours and requires drying time before use. Therefore, concrete installations are heavily reliant on good weather conditions, and cannot be completed in snow or frozen temperatures.Unlike concrete, our pedestrian ramps can be installed in most weather conditions, including snow. Plus, the product is manufactured from galvanised steel.Galvanising is a process where a protective coating of zinc is applied to prevent rusting and to kill moss.
Sponsored
Corfe Hills School, 3 system waterproofing scheme

Corfe Hills School, 3 system waterproofing scheme

Garland UK

Established in 1976, Corfe Hills School in Dorset welcomes over 800 secondary and sixth form students through their gates each year. Since achieving Academy status in 2011, Corfe Hills have been looking ahead, keen to develop a schedule of works for building improvements that support the school’s growth and ultimately safeguard the building’s future.Over time, the existing roofs across the site had experienced continuous water ingress issues that needed to be addressed. Multiple roof penetrations from the roof lights were leaking water; the existing waterproofing system and the overlaid bituminous membrane were failing in places resulting in splits and blistering, and the metal roof had rusted beyond repair. With rain seeping directly into the classrooms below, action had to be taken to ensure the site was remedied to a safe and comfortable learning environment for students and staff.Garland Technical Manager, Paul Boole, was instructed by building surveying firm Kendall Kingscott to support Corfe Hills approaching CIF bid for the critical roof refurbishment works. An essential part of the brief was to ensure that the buildings were not only fully waterproofed but to upgrade the overall thermal efficiency, alongside securing a robust 20-year guarantee.In support of the CIF bid, Paul carried out a thorough investigation of the school’s roof assets for Kendall Kingscott, producing core sampling data, detailed condition surveys and U-Value calculations to outline a clear specification for the works required. 
Sponsored
Light and free

Light and free

RENOLIT Cramlington Ltd

A lightweight solution... CHALLENGE A lightweight solution was required for the mounting of the PV installation on a production hall from Opel in Rüsselheim. For some years there existed no smart solutions for PV installations on roofs. Today we start to see the downside of PV roof installations that are not coping well with the weather conditions on top of roof constructions. Common mistakes made on PV roofs: • PV panels flying off the roof due to high winds where the attachments have not been strong enough and not fully tested. • Water leaks due to structural damage from the PV installation itself. Mainly due to the minute movement of the metallic/ aluminium PV-mounting on the roofing membrane. • Water leaks due to perforations through the roofing membrane when fixing the PV installation to the roof. • Roofs collapsing due to an excess of ballast of the ballasted PV installations. • Accelerated ageing of roofing membranes due to the use of incompatible materials on the roofing surface. SOLUTION RENOLIT ALKORSOLAR PV fixing system. This lightweight PV fixing system does not require extra ballast nor perforates the roofing membrane. The main parts of the system are PVC or EVA profiles that are heat welded onto the synthetic roofing membranes. This system is the only system that is fully tested for wind loads up to 200 km/h, has an Avis technique (France) and a DIBT approval (Germany).
Sponsored
National Maritime Museum, London

National Maritime Museum, London

FOAMGLAS®

FOAMGLAS® T4+ (Slab)Design Architects: C.F. Moller & Purcell Miller TrittonMain Contractor: Bovis Lend LeaseApplication: Compact Roof - Gallery Roof & Restaurant Terrace FOAMGLAS® S3 (Slab )Finish: PaversFOAMGLAS® insulation was specified for the new gallery terrace and restaurant of the National Maritime Museum. With limited height available upon the roof there was no space for a concrete screed to falls. Therefore, architects Purcell Miller Tritton needed a factory machined tapered insulation with a slope to shed water. In addition, the limestone terrace paving must withstand the loads imposed by vehicles and so the insulation beneath had to withstand these dynamic loads without any compression.FOAMGLAS® T4+ slab insulation was specified for the project due to these conditions. FOAMGLAS® does not move or deflect under loads, and is available factory machined with a tapered slope. Its thermal performance is reliable and permanent and it is guaranteed for the lifetime of the building. The new roof of the gallery has paved areas, and green planting with hidden drain age and water supplies.The restaurant terrace gives wonderful view of the World Heritage Site, Greenwich Park and the Royal Observatory. The gallery has some fascinating objects; including jewels which belonged to Sir Francis Drake, journals written by Captain Cook’s during his long voyages, and personal items that survived the sinking of HMS Titanic.
Sponsored
Collicutt Meats

Collicutt Meats

Be-Plas Hygienic Walls & Ceilings Ltd

Based in Cheltenham, Collicutt Meats is the largest meat depot in the South West. After almost 30 years, the Elite FRP panels and fixings that were fitted are still looking and performing as good as new.
Sponsored
Tuttons

Tuttons

AATi (Antislip Antiwear Treads International)

The AATi Nickel Bronze nosings will age elegantly to match the brass fixtures and fittings throughout the restaurant, therefore ensuring that the aesthetics are in keeping with Tuttons unique style as it enjoys its long and healthy establishment.
Sponsored
Eastern Avenue Leisure Centre

Eastern Avenue Leisure Centre

Gerflor Flooring UK Limited

The project would be a perfect ‘fit’ for international flooring specialist Gerflor.They would provide their high-end Taralay Impression Control safety flooring together with their uber-performing Taraflex® sports flooring.
Sponsored
The Granary, Barking

The Granary, Barking

FOAMGLAS®

FOAMGLAS® READY BOARD T4+Architects: Pollard Thomas Edwards ArchitectsConstruction: 2010 - 2012Application: Façade: FOAMGLAS® Slab W+F, 150 mm thick, adhesive fixed;Metal Pitched Roof: FOAMGLAS® READY BOARD T4+, 200 mm thick, adhesive fixedCladding: KME, Tecu BronzeFor the renovation of the façade and the pitched metal roof, FOAMGLAS® was chosen for its resistance to water and for its excellent long-term thermal performance: combined with FOAMGLAS®, the metal roof and façade can last well over 200 years.The grade II listed 120 year old Granary building and the Malthouse are among the oldest buildings within the East London district of Barking and Dagenham. In 2009 the redevelopment master plan was prepared by Schmidt Hammer Lassen Architects. Design for the Granary and Malthouse was carried out by Pollard Thomas Edwards Architects whom certainly achieved the client’s key requirements for sustainability, and energy efficiency.Steve Drury, Rooff development director commented: "At an early stage FOAMGLAS® was specified for its environmental qualities and long term reliability. It is impervious to water and water-vapour and it actually provided an element of exterior weatherproofing as the building works progressed: the interior works could commence whist the metal façade was still being installed. FOAMGLAS® insulation, with its unique cladding fixing system, kept thermal bridging to a minimum; the resulting U-value performance exceeds Building Regulations by more than 25%.With time, the KME Tecu Bronze exterior will take on a natural patina. The metal exterior has a potential lifetime of well over 200 years, hence it’s very important to use the right insulation with a proven long term thermal performance.With FOAMGLAS® thermal ageing does not take place. It is the ideal insulation to be combined with roof and façade materials such as KME Tecu Bronze.For the pitched roof FOAMGLAS® READY BOARD T4+ was bonded and sealed to the timber board structure with PC®11 adhesive. Metal Plates type PC® SP 150/150 were inserted into the FOAMGLAS® READY BOARD. A 180 g/ m2 sanded bitumen membrane was torch applied onto the surface.
Sponsored
Queensland Curve

Queensland Curve

The Safety Letterbox Company

THE PROJECTThe Queensland Curve project features a high-quality collection of mailboxes fitted into a curved surround that gives a unique layout to this bank of Steel 2 mailboxes.The Steel 2 mailbox used in this project is an in front / out front box that securely stores mail until a user accesses the individual mailbox with a coded key. Each mailbox is engraved with an identification number that allows the mailbox users to quickly and easily find their individual mailbox.The surround frame that the mailboxes are fitted into was designed on-site and the bank of mailboxes were designed around the space available.PROJECT DETAILSProject Type: Private AccommodationProduct: Steel 2 MailboxInstallation: Wall MountedQuantity: 75Accessories: Wooden Surround, Engraving
Sponsored
BMW Sytner – Nottingham – Rutland TS.9205

BMW Sytner – Nottingham – Rutland TS.9205

Rutland

Project DetailProject: BMW Sytner – NottinghamLocation: Nottingham, UKProduct: TS.9205 Architectural door closersProject DescriptionSytner is the second largest prestige motor dealer in England. It recently invested £4 million in a state-of-the-art accident repair centre in Nottingham, which has been fitted out with the very best furnishings, finishings and fixtures.However, it soon became apparent that door closers on several of the office doors needed adjusting and replacing. They had been incorrectly fitted and adjusted, which was causing wear on the products and making the doors bang shut. Due to the complicated engineering, a specialist was required, even for fitting. The centre had been visited by various tradespeople, who attempted to rectify the door closers, but after a short time they found themselves faced with the same problem again.We replaced the existing door closers with TS.9205 door closers because of their:Engineering with precisionDesign assurance and 35 year guaranteeConsistency of movementSteve Maples, Sytner Bodyshop Manager, said: “After being on site for 15 minutes, Rutland were able to cure the issue we had with our existing door closers. Thank you for your help.”

Showing 1009-1044 of 1128

Feedback