NBS Source
I'm a manufacturer

Hardwood Timber Tiles - Tunbridge Wells

OVERVIEW

This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.

Products featured in this case study

View all products (73)
Metal Edging Plate for Paving

Metal Edging Plate for Paving

More case studies from Wallbarn Ltd

View all case studies (40)
Adjustable Paving Supports - Woodbury Close, Finsbury Park

Adjustable Paving Supports - Woodbury Close, Finsbury Park

Instant Green Roof - Wimbledon - Care Home - M-Tray®

Instant Green Roof - Wimbledon - Care Home - M-Tray®

M-Tray® Instant Green Roof - The May Fair Hotel

M-Tray® Instant Green Roof - The May Fair Hotel

iDecking Project - Dunalastair, Perthshire, Scotland

iDecking Project - Dunalastair, Perthshire, Scotland

More case studies from Metal edgings

View all case studies (3)
Balance self-levelling pedestals for luxury rooftop living

Balance self-levelling pedestals for luxury rooftop living

A three-in-one adjustable pedestal for paving and decking

A three-in-one adjustable pedestal for paving and decking

Ceramic tile rail substructure system

Ceramic tile rail substructure system