Hardwood Timber Tiles - Tunbridge Wells

by Wallbarn Ltd

This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.

No featured products in this case study

Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Wallbarn Ltd

View all case studies(38)
Adjustable Paving Supports - Woodbury Close, Finsbury Park

Adjustable Paving Supports - Woodbury Close, Finsbury Park

Instant Green Roof - Wimbledon - Care Home - M-Tray®

Instant Green Roof - Wimbledon - Care Home - M-Tray®

M-Tray® Instant Green Roof - The May Fair Hotel

M-Tray® Instant Green Roof - The May Fair Hotel

iDecking Project - Dunalastair, Perthshire, Scotland

iDecking Project - Dunalastair, Perthshire, Scotland