Spanning an impressive 8,500m2, the three-storey building makes a striking centrepiece on the water’s edge. With its BREEAM requirements, waterfront position, and proximity to the coast, it was essential that the building’s roof be designed and installed to meet sustainability criteria, whilst being watertight and robust to withstand the elements. As the system needed to exceed a lifespan of 20 years in a coastal region, Sarnafil specified its thickest membrane with a 25-year guarantee – a 2…
Show moreContact Sika Sarnafil by clicking the button below to find out which products were used in this case study.
Leeds Arena
Norwich Castle
Center Parcs, Longleat
Ewart Grove, London