NBS Source
I'm a manufacturer

"floor fixings and trims"

7,917 results found

Sort by:

Showing 973-1008 of 1130

Sponsored
Hardwood Timber Tiles - Tunbridge Wells

Hardwood Timber Tiles - Tunbridge Wells

Wallbarn Ltd

This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.
Sponsored
Vantage® CS - Chelmor Riverside

Vantage® CS - Chelmor Riverside

BTS Fabrications Limited

Installer – Dearneside Fabrications LimitedMain Contractor – Taylor WimpeyArchitect – PRP ArchitectsClient -Taylor WimpeySystem- Vantage® CS (Coping / Capping system)Loyal customer and expert installer, Dearnside Fabrications Limited contacted us about utilising our Vantage® CS coping on this exclusive residential scheme next to the Chelmer River, Chelmsford, south east England.BTS Vantage® CS system was chosen because it has been designed with many advantages over standard pick and mix systems.Although every CS installation is engineered individually, the coping system is always very quick and easy to fit on site. It is always clipped on ensuring no fixings pierce the top side or front face of the coping. The only visible fixing is located on the inside wall. The capping is located on a robust extruded alloy bracket with specially designed grooves that include a rubber gasket, ensuring a snug watertight and anti-drum fit.The photos do not do the system justice as there is no butt straps needed leaving nice smooth lines and where corner junctions are needed, they just slip into place!As always BTS take great pleasure in supporting a key customer on such a prestigious installation which is now helping to deliver 421 new homes in a thriving riverside quarter development.Dearnside Fabrications Limited
Sponsored
Orbis OS211 and OS251 for St John Plessington Sixth Form

Orbis OS211 and OS251 for St John Plessington Sixth Form

Delta Balustrades Ltd

Products:OS211 Orbis Glass Infill Top Fix Stainless Steel BalustradeOS251 Orbis Standalone (No Infill) Powder Coated Double Handrail BalustradeContractor: Read ConstructionArchitects: AHR ArchitectsIt was great to work with Read Construction on this new two storey extension to St John Plessington Catholic College. With a total project value of £1.3m, the vision was to create a new state of the art Sixth Form Centre with significant internal renovations prior to the extension to enhance existing spaces.Deltas role in the project consisted of supplying and fitting:68m of our Orbis OS211 Glass infill Balustrade System with Stainless Steel Handrail to the internal atrium and stairs.37m of powder-coated Orbis OS211 Top Fix Glass infill Balustrade Systems to the external retaining wall.27.5m of powder-coated Orbis OS251 no infill balustrade with a double handrails to the external steps and ramps.Aside from balustrading requirements, this education sector project introduced an open plan learning centre, media room, eight new classrooms, and new break out space with a canopy for students. The outcome has exceeded expectations and created an adult-focused learning environment for sixth form students, similar to a university setting, as well as providing more space for the increasing pupil numbers at St John Plessington Sixth Form College.Image credits: Read Construction Holdings Ltd
Sponsored
THE CURVE

THE CURVE

Metalline Architectural Fabrications

News that The Curve in Slough has won an LABC award in the “Best Public Building” category, has delighted Metalline who supplied a wide range of architectural aluminium fabrications on the project. At the heart of a £450m regeneration scheme, The Curve is Sloughʼs premier cultural centre. Now complete, it houses a new library, café, museum, performance venue and learning rooms. The iconic project features a bespoke cladding system curved on plan and in section. The complex geometry involved to the North, East and West elevations meant that Metalline were involved from an early stage with contractors Colorminium, who took responsibility for the detailed design and delivery of the full building envelope. Once Colorminium had specified their requirements for the project to Metalline, the architectural aluminium was supplied promptly and to the exact measurements and detailing. The bespoke cladding system features a range of Metallineʼs curved and straight fascia panels, Secret Fix soffits and curved Secret Fix hook on Unity rainscreen panels complete with welded studs to the rear and curved carrier system. All panels and soffits were finished in a polyester powder coated RAL 9006 metallic silver finish to give the building a modern and high quality appeal. Metallineʼs aluminium rainscreen cladding now has CWCT certification which has provided architects and specifiers with limitless possibilities for their projects enabling them to use unique and elegant rainscreen designs.
Sponsored
Yeoman Shield Extend Lifecycle of Walls at Pinderfields Hospital

Yeoman Shield Extend Lifecycle of Walls at Pinderfields Hospital

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Yeoman Shield engaged with Equans and The Mid Yorkshire NHS Trust to continue to improve the lifecycle of wall coverings in key areas of Pinderfields Hospital.Previously Yeoman Shield Imagery wall protection panels had been installed on the lower section of walls in the gate areas of the hospital. These panels perfectly replicated the design of the wallpaper which was becoming damaged and starting to look unkempt.Showing to be successful in fending off impact damage, scratching, and marking the decision was taken to repeat the same process to the upper part of the wallpapered walls.Yeoman Shield’s team copied images and dimensions from the printed pattern on the original wall covering taking care to align the top and bottom graphics.The designs were programmed into Yeoman Shield’s in-house CNC machine then cut from Yeoman Shield’s 2.0 mm Falmouthex protection panels and fitted together to emulate the design and colourways.The panels were installed by Yeoman Shield’s fixing operatives to provide a decorative, hygienic, and impact-resistant covering that remains true to the original design brief. Minimising future redecoration and repair requirements, the panels will assist in reducing maintenance budgets providing a long-lasting, durable solution to impact damage.Richard Bebb, Equans Lifecycle Manager commented, “The Yeoman Shield fixing team were great and worked well and with respect in live areas and we are very pleased with the product and finished installation.”
Sponsored
The Granary, Barking

The Granary, Barking

FOAMGLAS®

FOAMGLAS® READY BOARD T4+Architects: Pollard Thomas Edwards ArchitectsConstruction: 2010 - 2012Application: Façade: FOAMGLAS® Slab W+F, 150 mm thick, adhesive fixed;Metal Pitched Roof: FOAMGLAS® READY BOARD T4+, 200 mm thick, adhesive fixedCladding: KME, Tecu BronzeFor the renovation of the façade and the pitched metal roof, FOAMGLAS® was chosen for its resistance to water and for its excellent long-term thermal performance: combined with FOAMGLAS®, the metal roof and façade can last well over 200 years.The grade II listed 120 year old Granary building and the Malthouse are among the oldest buildings within the East London district of Barking and Dagenham. In 2009 the redevelopment master plan was prepared by Schmidt Hammer Lassen Architects. Design for the Granary and Malthouse was carried out by Pollard Thomas Edwards Architects whom certainly achieved the client’s key requirements for sustainability, and energy efficiency.Steve Drury, Rooff development director commented: "At an early stage FOAMGLAS® was specified for its environmental qualities and long term reliability. It is impervious to water and water-vapour and it actually provided an element of exterior weatherproofing as the building works progressed: the interior works could commence whist the metal façade was still being installed. FOAMGLAS® insulation, with its unique cladding fixing system, kept thermal bridging to a minimum; the resulting U-value performance exceeds Building Regulations by more than 25%.With time, the KME Tecu Bronze exterior will take on a natural patina. The metal exterior has a potential lifetime of well over 200 years, hence it’s very important to use the right insulation with a proven long term thermal performance.With FOAMGLAS® thermal ageing does not take place. It is the ideal insulation to be combined with roof and façade materials such as KME Tecu Bronze.For the pitched roof FOAMGLAS® READY BOARD T4+ was bonded and sealed to the timber board structure with PC®11 adhesive. Metal Plates type PC® SP 150/150 were inserted into the FOAMGLAS® READY BOARD. A 180 g/ m2 sanded bitumen membrane was torch applied onto the surface.
Sponsored
Premier Inn Scarborough Isogrid

Premier Inn Scarborough Isogrid

CMS Danskin Acoustics

Isolating Hotel Rooms from RestaurantsPreventing noise transmission between the noisy areas of a building to the quiet areas is an ongoing challenge. When the quiet areas are people sleeping and the noisy area is a busy hotel dining room, the problem is particularly acute, but can be resolved by using the appropriate products which are cost effective and easy to install correctly.The ProjectPremier Inn Scarborough North is a new build 105 room, 5-storey hotel with a 68-cover restaurant, which was completed in March 2021. The new hotel was granted planning permission in 2018 and construction was slightly delayed over the Covid lockdown period.Owner of the Premier Inn brand, Whitbread, continues to see strong growth with their UK business continuing to outperform in the midscale and economy market and now has over 800 hotels in the UK. Key to the brand’s message is that wherever you stay in a Premier Inn, you will always get great levels of comfort.The ChallengeSources of noise which affect hotel guests include:External sources of noise and vibrationTransmission between rooms and between rooms and corridorsTransmission from engineering systems (ventilation and air conditioning, heating systems, lifts and so on)Transmission from public areas – reception, conference facilities and in particular restaurants.Noise transmission from restaurants, bars and reception areas becomes a significant challenge where the design of the hotel incorporates these areas on the ground floor of a block, with hotel rooms directly above.Reducing the transmission of noise from a large common area to individual hotel rooms rests principally on isolating the plasterboard or suspended ceiling. To overcome this challenge, a frequent recommendation is to design a ceiling incorporating neoprene isolation hangers.Neoprene Isolation Hangers for HotelsNeoprene isolation hangers are primarily used to isolate suspended sources of audible frequency vibration, such as piping and ductwork systems. They also provide very effective vibration isolation for hanging acoustic ceilings by preventing transmission of noise to the building structure.The isolation hangers supplied for use in the ceiling at Premier Inn Scarborough North were Isogrid Quick-Connect Ceiling Hangers, supplied by CMS Danskin Acoustics.The IsoGrid Quick Connect Ceiling Hanger has a specially designed dual deflection neoprene isolator which allows internal bulging. This enables the neoprene element to achieve greater deflections whilst maintaining lateral stability. Greater deflection translates to greater performance for noise control ceilings.IsoGrid Quick-Connect Ceiling Hangers have several other benefits:They are more cost effective than similar products;The simple design makes them quick and easy to install, providing significant labour savings over conventional sound control ceiling hangers;The known deflection rates ensure acoustical performance under design loads;Tested for airborne, impact and frequency performance to BS EN ISO 10140 requirements;Various attachment methods allow for installation on a variety of ceiling structures, including concrete, metal deck or structural framing;A bronze core serves to prevent poor acoustic performance due to over compression or due to accidental short circuiting of the transmission pathway.InstallationThe ceiling was installed by specialist contractor B W Shrimpton Limited. This was the first time that Shrimpton’s had used IsoGrid hangers, but they were well received.Supervisor Kirk Talbot, who has worked closely with the CMS Danskin Acoustics Team on several projects, explained his preference for the hangers is very much about the ease of installation:“We used Hilti pan head HUS fixings into the soffit for fixing them up, and the lads on site had no issues with them at all.“The IsoGrid hangers are definitely robust enough and easy to fix angle or wires to. On that basis and the cheapness compared to other hangers out there, I’d definitely use them again and will recommend that others do too.”Kirk Talbot, BW Shrimpton LtdTechnical Advice on Acoustics in HotelsCMS Danskin Acoustics are specialists in soundproofing materials and acoustic insulation. Our expert technical team can advise on the specification of a wide range of specialist acoustic and vibration control systems – balancing performance, aesthetics and budget. We provide solutions to treat floors, walls and ceilings, as required, delivering a holistic design approach to sound control for the complete gym or sports hall environment.We don’t just design, manufacture and deliver market leading products. We work with the entire supply chain and project teams to ensure a smooth path from conception to completion.
Sponsored
Trinity Primary Academy

Trinity Primary Academy

TRC Windows

TRC was appointed as principal contractor by Barker Associates in May 2019, to carry out specialist sash window restoration works.Trinity Primary Academy is a primary school located in Bounds Green Road, Wood Green, London. It was built in 1899 by Mitchell and Butler and consists of yellow brick and red brick dressings, tiled roofs, irregular fenestrations, and sash windows that give away its Queen Anne Revival style. It's currently categorised as a Grade II Listed building with Historic England, and is part of the Academies Enterprise Trust.Nature of the worksAs the building was Grade II listed, timber window repairs had to be sympathetic and complementary to the historic nature of the property. Many of the existing timber sash windows were inoperable due to the build-up of decorative coatings, timber degradation, and defective and broken sash window ironmongery, as well as opening mechanisms. The requirement was for the windows to be fully refurbished, repaired and operational as originally intended, but also modified to meet health and safety requirements.Phase one of the refurbishment of 200 sash and timber casement windows commenced on the area needing most attention: the west elevation of the building. Following the success of phase one, the client team extended TRC’s appointment to continue around the remainder of the building, systematically completing all other windows, door and roof light refurbishments.This overall refurbishment project included:Stripping back the existing paint from the historic sash windows and repairing any decayed timber.Repairing glazing as and where necessary.Improving the thermal and acoustic containment by installing draughtproofing.Repainting windows and installing ironmongery.Undertaking brick and stone repairs to the building’s exterior.This project also required our specialist attention on some specific areas of traditional glazing. This aspect of the project required the repair and refurbishment of all four oriel bay windows and the oriel bay glazed roofs. Completion included the supply and fixing of new safety glazing and hardwood timber roof rafters, along with the repair and refurbishment of the two existing openable roof lights. The supply and fixing of new code 4 lead flashing, with lead wedges, was also carried out and fully pointed with the correct cement mortar at the wall abutment.Additional detailed work throughout the project included the following:Removal of all existing fitted window blinds for refixing upon completion of works.Removal and repair of existing window ironmongery, including original mechanical winding gear, solid bar opening mechanisms, locking fasteners, slide bar restrictors, cable restrictors, handles and stays.Careful removal and repair of all internal fixed-glazed hopper units, casements and pivot openings.Removal and replacement of all cracked and broken glazing, and replacement of the existing Georgian wired-glazing, with 6mm safety glass or 4mm polished plate glass to areas up to 1.2m height from floor level. Where privacy was required, white opaque glass with thickness in accordance with above was used.Removal and replacement of all loose and defective glazing putties, and removal of all flaking, loose and built-up paint coatings.Exposure of all timber rot and decay ready for repair with Repair Care Systems products, followed by sanding and priming ready for decoration.Vertical sliding sashes repaired, refurbished and rehung on new sash cords and weights, and adjusted as needed. Sashes were routed to accept new brush pile weather stripping. New parting beads and staff beads were serviced with brush pile weather stripping where appropriate.Final internal and external decoration was carried out using Dulux or Leyland trade paints, allowing for one undercoat and one gloss finish.
Sponsored
Edinburgh Sculpture Workshop: Terra-34 grating panels as a wall cladding screen.  The ESW provides studios, work space and professional development opportunities to sculptors.

Edinburgh Sculpture Workshop: Terra-34 grating panels as a wall cladding screen. The ESW provides studios, work space and professional development opportunities to sculptors.

Lang+Fulton

Over 266m2 of framed panels of Terra-34, which is a grating which conforms to anti-climb guidelines, were made to cover the south, east and west elevations. These were fabricated in 16 different sizes up to 2.5m high and 1m wide and fixed to the structural framework with custom welded plates. Access through the east elevation was provided by a very large double-leaf gate to allow for the removal of large sculptures and installations. The gate was made out of six separate panels within each leaf for an overall size of 4.6x5.3m (hxw).
Sponsored
Stonyhurst College’s New Refectory Keeps cool with Solar Shades from Dales

Stonyhurst College’s New Refectory Keeps cool with Solar Shades from Dales

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Clitheroe, LancashireProject: EducationalProduct: Elliptical Aluminium Fascia with Secret Fix Panel SystemShadex 260 Solar Shade Vertical Stack (Structural Steel Support)100mm Round Contemporary Aluminium Pipe​Finish: Syntha Pulvin RAL 7039 Matt Quartz GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Stonyhurst CollegeArchitect: Cassidy + Ashton ArchitectsMain Contractor:  Globe Construction ManagementSub Contractor: Blackwell Stanistreet
Sponsored
Bullnose Fascia and Meridian Coping at Osborne Gate

Bullnose Fascia and Meridian Coping at Osborne Gate

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bracknell, BerksProject Type: ResidentialDevelopment Cost: £33mProduct: 600m Bullnose FasciaRaking Secret-Fix Panel Soffit320m Meridian Coping250m Balcony FasciasFinish: Syntha Pulvin RAL 7005 Satin Mouse GreyFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Redrow Homes LtdArchitect: Vista ArchitectureMain Contractor: Redrow Homes LtdSub Contractor: Stafford Rainwater Systems Ltd
Sponsored
APL Case Study - Perforated Sinusoidal Airwall™ Cladding - Marlborough College Innovation Centre

APL Case Study - Perforated Sinusoidal Airwall™ Cladding - Marlborough College Innovation Centre

Architectural Profiles Ltd

Project: Innovation Centre, Marlborough CollegeDate: 2020 Background:·        APL were specified by the architect at an early stage in the project, providing a number of samples with different perforations and in different colours·        APL’s engineering team designed a bespoke aluminium sub-frame to minimise any window obstruction Systems:·        1,600m² of AP45HR-Airwall™ perforated profile in aluminium with a Class 2 PPC coating to both sides·        Bespoke-design APL aluminium sub-frame coloured-matched to the Airwall™·        All fixings and accessories  Building Location:·        Swindon
Sponsored
APL Case Study - APL SnapLoc™ Cladding - Graven Hill

APL Case Study - APL SnapLoc™ Cladding - Graven Hill

Architectural Profiles Ltd

Project: Graven HillDate: 2020 Background:·        APL were engaged with the project consultant to assist with overcoming design issues with their chosen support structure (by others)·        APL designed a custom sub-frame due to the extreme tolerances on the chosen substrate·        APL provided all structural calculations Systems:·        1,000m² of APL SnapLoc™ traditional standing seam system in steel with a RAL 7016 PUF coating·        APL Tritherm™ GALV sub-framing to APL SnapLoc™ areas·        All flashings, fixings and accessories Building Location:·        Oxford
Sponsored
Complete Aluminium Eaves System at BMW Dealership, Cheltenham

Complete Aluminium Eaves System at BMW Dealership, Cheltenham

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Cheltenham, GloucestershireProject Type: Automotive & RetailDevelopment Cost: £10mProduct: Complete Aluminium Eaves System2000m² Secret Fix Soffit PanelsOriel window surroundsFinish: Syntha Pulvin RAL 9016 Matt Traffic WhiteRAL 9005 Matt Jet BlackFire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: Cotswold BMWArchitect: MDG ArchitectsMain Contractor: Revival Developers LtdSub Contractor: Cladceil Ltd
Sponsored
Kingston University - London

Kingston University - London

EFFISUS

Most of Kingston University buildings were built between the 1950s and 1970s, so it is comprehensive that most of them are deteriorating, and running out of energy efficient. That’s why Kingston University decided to invest in their campus, maintaining its competitive position in the market. The new buildings will be environmentally sustainable, and flexible in order to be adapted to future teaching needs. Effisus Ecofacade P-Fix was applied in order to protect buildings’ facade connections from the deteriorating effects of atmospheric agents, at the same time maximizing its energy efficiency saving both waste and error application.
Sponsored
Seating and planters - Westgate Mall, Oxford

Seating and planters - Westgate Mall, Oxford

Furnitubes International Ltd

Furnitubes designed, engineered, manufactured and installed 35 planters and 8 seating units. The planters were supplied in corten steel and aluminium trusses up to 6m high were bolted into the base of the planters for climbing plants to grow up. The seating is from Furnitubes’ new Elements XL range, designed to be sufficiently stable to not require fixing down, with 4 units including bespoke backrests. All products are heavy enough to not be easily moved by the public, but can be readily moved by pallet truck if the spaces in the Lower Mall need to be rearranged in future.
Sponsored
The Word

The Word

Kingspan Insulation

The three-storey structure designed by FaulknerBrowns, includes library and exhibition space, IT suite, 3D printers, and café. The development, completed in October 2016, is part of a £100 million regeneration masterplan which partners South Tyneside Council with Muse Developments. Creating a curved structure can pose a challenge, but the Kingspan TEK Cladding Panel was successfully engineered to provide a smooth, highly insulated exterior envelope. To achieve this, the structural insulated panels (SIPs) were designed and factory cut into narrow widths. This allowed them to be quickly and easily fixed to the concrete frame.
Sponsored
Metsec’s SFS steel framing system has helped to create a seamless finish to the façade of a new state-of-the-art custody centre and strategic policing hub for Devon and Cornwall Constabulary.

Metsec’s SFS steel framing system has helped to create a seamless finish to the façade of a new state-of-the-art custody centre and strategic policing hub for Devon and Cornwall Constabulary.

Metsec (voestalpine Metsec)

A requirement in Corstorphine Wright’s design brief was to avoid horizontal movement joints in the finished façade, which would have been the result had a traditional SFS Infill to concrete frame approach been taken. Working with Willmott Dixon at the early design stages of the contract, Metsec’s in-house design team proposed a continuous walling solution formed from SFS to support glazing and rendered elements that would form the external skin of the façade. Metsec’s solution included the use of fixing cleats to connect the SFS continuous walling to the structure’s concrete frame.
Sponsored
Fire rated timber loft ladder - Profiline F30 / F30 Plus / F60

Fire rated timber loft ladder - Profiline F30 / F30 Plus / F60

Premier Loft Ladders Ltd

The Profiline F30/F30 Plus/F60 is a fire resistant 3-part folding wooden ladder. It’s a ready to fit unit with a trapdoor and hatch box with an all-round rubber seal. The F30 is fire resistant tested from the underside, the F30 Plus from above and below and the F60 from below. It is simple to use and when folded away sits on top of the trapdoor. Supplied complete with a handrail, rubber feet and white cover strips to fix onto the hatch box edges. It has a turn latch locking mechanism operated by a wooden pole.
Sponsored
Protan Vacuum Roof System at Butlins Splashworld, Skegness

Protan Vacuum Roof System at Butlins Splashworld, Skegness

Protan (UK) Ltd

Over 1,200m² of Protan SE 1.2mm PVC single-ply membrane was installed in the Protan Vacuum roof system at Butlins Splashworld, Skegness. The roof system required no mechanical restraint or adhesives (except for around the roof perimeter and penetrations), as it relies upon the wind to keep the membrane in place with the help of Protan vacuum vents installed at locations designed by Protan's Technical Services Department. William Bird of Protan partner roofing contractor, Roofdec Ltd, commented, "Protan's vacuum roof system is quicker to install than conventional fully-adhered or mechanically-fixed systems."
Sponsored
Wapping Wharf, Bristol

Wapping Wharf, Bristol

Senior Architectural Systems Ltd

The £43 Million second phase of the regeneration of Bristol Harbourside features two new residential buildings and four retail units.The design by Alec French Architects reflects the area’s historic past and features an extensive thermally efficient glazing package. This includes Senior’s fixed light plus tilt & turn SPW600 aluminium windows, SPW501 aluminium commercial doors for emergency exits and inward opening SPW600 aluminium doors giving access to apartment balconies.The highly durable aluminium construction of Senior’s glazing systems makes them ideal for coastal and waterside buildings.
Sponsored
Secondary glazing solutions for baby’s comfort in North London home

Secondary glazing solutions for baby’s comfort in North London home

Selectaglaze Ltd

A Selectaglaze secondary glazing treatment to a set of patio doors in a suburban home in Cockfosters, North London makes a living room warmer and more comfortable for a couple’s new born baby. A Series 10 2-pane horizontal sliding unit was installed to the patio doors. The opening was 2m x 2m and it was important that the treatment would match the existing sightlines. Timber grounds were fixed into the reveal, which had skirting boards. Installers scribed into the timber frame to create matching grooves and nuances to fit snug in the reveal and over the skirting.
Sponsored
Bells Sports Centre, Perth

Bells Sports Centre, Perth

Sika Sarnafil

Celebrating its 50th anniversary in 2019, the iconic Bell’s Sports Centre in Perth, needed a new roof to protect the building. With the previous roof membrane nearing 30 years old the centre needed a long-term and robust roofing solution. The product of choice was the mechanically fixed Sarnafil S327-15 EL Light Grey as it is more than able to cope with all the extremes of the Scottish weather and has been certified by the BBA to last in excess of 40 years. The durability of the single ply material ensured a long-lasting solution for the project.
Sponsored
Porsche, Reading

Porsche, Reading

Sylan

Over the past few months Porsche Reading has undergone a refurbishment to enhance customer facilities and update the showroom with the latest Porsche design.Sylan Products Supplied:High Gloss Toilet CubiclesFlush frontedContemporary designInvisible fixing systemFull height cubicleChosen in white gloss laminate to match Porsche brand coloursColourCoat High Gloss Duct PanellingOption to match panelling to cubiclesBeautiful Gloss finishHung on a metal frame system for a quick installAvailable in over 200 classic RAL colours
Sponsored
MaxiBeam Raft Feature Ceiling in Stunning Offices

MaxiBeam Raft Feature Ceiling in Stunning Offices

Vtec Group

Vtec was specified to provide feature ceiling beams using our MaxiBeam raft above an informal seating area in the large social space. Finished in a special Oak laminate, the raft’s interesting geometry follows the shape of the building and draws the eye. No two beams are the same; each was individually shaped and sized to perfectly fit the perimeter. Our Technical Team provided detailed set out dimensions to ensure correct positioning of the MaxiBeams for smooth installation, with the outcome that every single one of the feature ceiling beams is fully removable using our Click-Fix method.
Sponsored
Luxurious office fit-out with modern Ceiling Beam design

Luxurious office fit-out with modern Ceiling Beam design

Vtec Group

The UK's most exclusive and largest bungalow provider needed a refurbished space to tell their story. Vtec was excited to support the designers with a premium and modern ceiling beam design with the MaxiBeam system. The ceiling beams were 39mm x 85mm tall and the decorative ceiling was coffered, creating a sunken rectangle in the space. The ceiling carries occupiers on a journey in the large open areas achieving both visual and functional benefits. Learn more about how the Click Fix installation system made it easy for the beams to be removed for access to M&E services.
Sponsored
Turbine Hall A & B, Battersea Power Station

Turbine Hall A & B, Battersea Power Station

The Outdoor Deck Company Ltd

Over 10,000 square metres of the Thermo Ash 'hidden-fix' system were supplied for various external areas on the Turbine Halls of the iconic Battersea Power Station including the private roof terraces and balconies of the sky villas on the roof of the building, and roof terraces of the commercial office spaces.The use of the Grad system not only created stunning areas, but contributed to significant savings on the labour cost of installation.The installation of Thermo Ash used Grad aluminium rails with factory-placed clips for perfect alignment, placed on Buzon UK's PB range of pedestals where required.  
Sponsored
1 metre high Megapads for jacuzzi project

1 metre high Megapads for jacuzzi project

Wallbarn Ltd

The contractor was installing a jacuzzi for a client. The jacuzzi’s filter requires regular cleaning which means lifting a slab to gain access to the area. The best solution for the slabs around the jacuzzi was to elevate them without fixings over the very high void. 915-1020mm Megapads were chosen. Megapads were positioned around the perimeter. Slabs were then laid on top, covering the area whilst allowing access to the filter and giving ventilation to the mechanics. With a weight tolerance of 1,560Kg and temperature resistant to Minus 40°C, Megapads were the perfect solution.
Sponsored
Paving and Decking Supports - St Katherine's Dock, London

Paving and Decking Supports - St Katherine's Dock, London

Wallbarn Ltd

This was a major refurbishment and landscaping project for an office development in the City of London. A podium deck had been re-waterproofed and the area landscaped, by contractor Scotscape, with a mixture of hard surfaces, grass lawns, planters and borders. Wallbarn has a very wide range of pedestals for a variety of applications. So we were able to supply exactly the right pad to best support the 6 x 2” joists the landscaping contractor needed to hold their decking boards. The timber joists were fixed into a frame and rigid insulation placed into the cavities between the beams.
Sponsored
The Royal Academy of Music

The Royal Academy of Music

ROCKWOOL Ltd

The Royal Academy of Music in Regent’s Park, London underwent a renovation but needed to ensure three qualities were met, creating stunningly beautiful, acoustically brilliant, and inspiring spaces for staff and students.The 309-seat Susie Sainsbury Theatre was completely refurbished and created the new 100-seat rooftop Angela Burgess Recital Hall.The project marked one of the most significant building and renovation projects in the Academy’s near-200-year history.To help achieve these qualities ROCKWOOL HardRock® Multi-Fix (DD) insulation board was considered and installed.
Sponsored
Terrace Access Achieved Using Box Rooflight To Highlight Ocean Views

Terrace Access Achieved Using Box Rooflight To Highlight Ocean Views

Glazing Vision Ltd

Glazing Vision’s three-wall box rooflight has provided a rooftop with more de rigueur, and one which takes advantage of the spectacular views overlooking the Perth shorelines.Keen to unlock and utilise the space on top of this newly built residential home, and further add value to this property, an innovative “glass box” was introduced to provide easy access to the roof terrace.Luxurious, modern and upbeat, this new build property has been carefully created with family life in mind. The floor plan involves family separation and considered zoning of the property.The ground floor provides a secluded escape from the excitement of the first floor, with a detailed layout which enables the clients to relax. A big theatre room and access to the garden offers a chilled out environment, hidden away from neighbours.The first floor is created for living in, with a completely open planned lounge, diner and kitchen. Set higher up, it allows for views across the beach and over the garden courtyard. Thus, it was important to ensure that high quality glazing was specified throughout to make the most of the wonderful views.Tasked with sourcing and installing the windows and doors on this modern new build property, Next Generation Glass director Steve Payne mentions how the client had come to them enquiring about skylights. After a lot of research into the different profiles available in Australia and after various different drawings and ideas, the outcome wasn’t looking good.It was a visit to the UK which led Steve to Glazing Vision, thankful of a recommendation from a contact of his. “Since my first contact, we decided it was a great product and became a distributor of Glazing Vision products in Australia”.After discussing the details of the job, a three wall box rooflight was recommended, helping to provide access to the clients roof terrace and providing wonderful views of the majestic presence of the Indian Ocean in the background.“It really is a great product and all that see it are in awe of it” explains Steve Payne, director of Next Generation Glass.The Glazing Vision three-wall box rooflight is fixed to your existing building structure, thereby facilitating the full use of the roof top terrace but operates in the same way as our freestanding box rooflight. The sleek aluminium framework and perfectly edged glass-to-glass joints create a stunning contemporary finished design which reflects the style of this property.This home’s rooftop terrace is the culmination of meticulous tweaking of the planning codes, and the reward is breath-taking views of Perth, with a beautiful backdrop of the ocean behind. It was in fact these planning codes which guided them towards the three-wall box rooflight, as the extra head height was required when coming up the stairs. Also allowing the homeowner to climb the stairwell whilst the rooflight is retracting into its open position, without having to ‘bow their head’.Fitted with minimal and contemporary outdoor furniture to increase the sense of openness. The new roof top allows the homeowner an additional ‘room with a view’, perfect for entertaining or for relaxing and enjoying the stunning views on offer.Having completed their first project with Glazing Vision, Steve Payne mentions how easy the whole process was, and that most of the hard work was undertaken by Glazing Vision. It was a simple installation process for a company like Next Generation Glass who are used to cranes in their scope of works.
Sponsored
N06 East Village

N06 East Village

SELO

This scheme was designed by the architects Hawkins Brown and constructed by Mace, who were very easy to work with and have a great project team.One of the main challenges of the project was the fact that is was being constructed during lockdown, and both design team and project team were all working from home, but because of such good communications across the teams, everything flowed very well. N06 East Village is located at the site of the former 2012 Athletes Village and close to the London Olympic Park 2012, so there’s plenty of sports locations nearby!The façade sections were constructed using a modern method that involves some manufacturing and assembly being completed offsite. They were pre-assembled and fixed offsite onto the precast concrete floor units and this new high rise construction solution, removes the need for scaffolding Because each floor is fully enclosed, it reduces project time and the risk of site operatives working at height and increases project speed time with less labour needed on site. This was especially beneficial considering construction was during the Covid-19 pandemic. It is believed that throughout this project there was 40% less vehicle movements to and from site and 70% less site waste created.*We supplied the original Quadra metal riser doors throughout the two residential towers however we have since improved the doorsets and they are now Quadra+. N06 East Village project has a modern interior with bright, bold colours featured on both the inside and the outside façade. Selo’s concealed riser doors were a perfect fit with their interior design providing a sleek, flush solution throughout the corridors.This project was one of the first major projects that we supplied our Quench fire-stopping protection to after they requested a factory fitted fire stopping solution. Quench is a safe and reliable solution that is pre-fitted to the riser door frame, removing the need to apply intumescent mastic. It has a 120minute fire resistance rating when used in conjunction with Selo’s Quadra+ riser door system. This solution removes the need to work inside the riser to apply the intumescent and thus removing the fall risk and hazardous working environments.*Source: https://www.cast-consultancy.com/knowledge-hub/plot-n06-east-village/
Sponsored
Plant Trellis – Green Park Station

Plant Trellis – Green Park Station

Lang+Fulton

Green Park Station provides access to the Jubilee, Piccadilly and Victoria Lines. The £60 million refurbishment to achieve step-free access included a copper canopy, a Portland stone entrance and a ramp from the ticket hall into the Park featuring green wall screening. Lang+Fulton designed and supplied 300sqm of panels to clad the raked inner facade of both retaining walls and the tapered wall-heads, which would support the green wall planting. The panels were made to custom sizes from Terra-34 grating and fixed with varying lengths of bracket to accommodate the stepped areas in the walls.
Sponsored
Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Vertical Rainscreen Cladding Panels at Chelsea Waterfront, London

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Lots Road, Chelsea, LondonProject Type: HousingDevelopment Cost: £60mProduct: Rainscreen CladdingMeridian Wall CopingsShadex 150 Privacy ScreensPerforated Secret Fix Soffit Panels (To Balconies)Finish: Syntha Pulvin RAL 7012 Matt Basalt Grey S4L0891: Qualicoat 2Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: CK Asset Holdings LtdArchitect: FarrellsMain Contractor: Rollecate Facades LtdSub Contractor: Rollecate Facades Ltd
Sponsored
Curved Aluminium Fascia and Rainscreen Panels at Terrace Mount, Bournemouth

Curved Aluminium Fascia and Rainscreen Panels at Terrace Mount, Bournemouth

Dales Fabrications Ltd - Aluminium Eaves Products

Location: Bournemouth, DorsetProject Type: Mixed use – Housing, Hotels & RetailDevelopment Cost: £20mProduct: 800m Meridian Aluminium Wall CopingsCurved Aluminium FasciaSecret Fix Soffit Panels Rainscreen Panels​Finish: Syntha Pulvin RAL 9007 Matt Anthracite Grey Aluminium: QC2 Powder & Marine Specification Fire rating: A2 s1, d0 Non-combustible (Reaction to Fire EN BS 13501-1:2018)Client: McAleer & RusheArchitect: White Ink ArchitectsMain Contractor: McAleer & RusheSub Contractor: Rollecate Facades Ltd
Sponsored
Accoya windows take in first-class views at split level Hastings home

Accoya windows take in first-class views at split level Hastings home

Accoya

Accoya was used to construct the external windows, window reveals & doors. 38 Accoya fixed & opening windows were installed, & 22 glazed door leafs. They will require little maintenance over their lifetime due to the process in which the wood is made. Caspar Rodgers from Alma-nac commented: “We chose Accoya because we wanted to build using eco-friendly materials that could withstand the variable weather conditions that are characteristic of England’s southern coast. Accoya is well-respected within the industry as a highly sustainable product that has high levels of durability & stability"

Showing 973-1008 of 1130

Feedback