NBS Source
I'm a manufacturer

Kingston University - London

OVERVIEW

Most of Kingston University buildings were built between the 1950s and 1970s, so it is comprehensive that most of them are deteriorating, and running out of energy efficient. That’s why Kingston University decided to invest in their campus, maintaining its competitive position in the market. The new buildings will be environmentally sustainable, and flexible in order to be adapted to future teaching needs. Effisus Ecofacade P-Fix was applied in order to protect buildings’ facade connections from the deteriorating effects of atmospheric agents, at the same time maximizing its energy efficiency saving both waste and error application.

Products featured in this case study

View all products (10)
Effisus Ecofacade System

Effisus Ecofacade System

More case studies from EFFISUS

View all case studies (46)
Southbank Place

Southbank Place

SSE Hydro Arena

SSE Hydro Arena

Birmingham New Street Station

Birmingham New Street Station

Royal Wharf

Royal Wharf

More case studies from Plastics sheets

View all case studies (25)
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

The Moorings, Wales

The Moorings, Wales

The Willows, EnerPHit Retrofit

The Willows, EnerPHit Retrofit

Forensic Laboratory Backweston

Forensic Laboratory Backweston