NBS Source
I'm a manufacturer

"drain"

1,473 results found

Sort by:

Showing 73-108 of 125

Sponsored
How to prevent flooding. Northampton Service Station and Lorry Park, UK.

How to prevent flooding. Northampton Service Station and Lorry Park, UK.

ULMA Architectural Solutions

We have improved the drainage system at this lorry park and service station in this town to the north of London.  The problem was that the drainage system installed in the area did not have sufficient capacity to drain the rainwater, leading to dangerous accumulations of water on the road surface.Service stations and lorry parks have a constant flow of vehicles. There are also some areas where HGVs turn, making it necessary to guarantee the safety of the installation of the channels in order to prevent breakages and accidents.Good advice on your drainage system avoids problems and gives you peace of mind.In these cases, it is essential to have a consultancy service that, taking into account all the necessary parameters (location, rainfall, surface slope, weight to be borne by the grating (load type) and length of the drainage line), defines the model best suited to the site.In this project, 250 ml of Civil-F polymer concrete channels, model F150K, were installed for load type F900. And it has a grating secured at 8 points. It is important for you to know this.
Sponsored
Coca-Cola Enterprises, Wakefield

Coca-Cola Enterprises, Wakefield

Rapid Ramp Limited

REQUIREMENT: Able-bodied access to the cabin. ADDITIONAL INFORMATION: We quoted and produced technical and CAD drawings, with reference to the finished floor height measurement supplied by the modular building company.END RESULT:Our expert installers fitted a step system as shown. FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Standard Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour Black - ramps are powder-coated black, to create a durable finish that is tougher than conventional paint.THE COMPLETE RAMP PACKAGE:An all-inclusive, stress-free option which we managed in-house.This package includes a site survey (if applicable), quotation, CAD and technical drawing, supply, and installation. 
Sponsored
Craven Cottage, Fulham FC - Gatic CastSlot

Craven Cottage, Fulham FC - Gatic CastSlot

Alumasc Water Management Solutions

A bespoke Gatic CastSlot system was installed as part of the redevelopment of the riverside stand for Craven Cottage, home to Fulham FC. The project, which began in July 2021, incorporates Gatic CastSlot Treadsafe, which was chosen to drain away any excess surface water from the seating/standing areas along the deck of the stand. It was installed by main contractors Buckingham Group.The unobtrusive profile of CastSlot sits neatly within concrete, asphalt, and block surface finishes and features an electro painted ductile iron throat section. This is securely fixed to the galvanised steel channel body to provide an exceptionally robust yet discreet drainage system.The treadsafe option was chosen for this project. Treadsafe is available for areas where there is regular foot traffic and is available with a 10mm or 30mm opening—ideal for stadium standing and seating areas.Bespoke access boxes were also created for the new stand, and channel throat depths were also extended for level changes, allowing a constant invert within the channel.
Sponsored
Yale Campus, Wrexham

Yale Campus, Wrexham

Technal

Located on the north side of Wrexham town centre, the BREEAM excellent Yale Campus one of the largest projects undertaken by Coleg Cambria across its network of six campus sites, which has a base of 7,000 full time and 20,000 part time students.Maximising daylight and ventilation, the glazed façade spans 1,200 sqm across the building. Specified for proven performance and thermal insulation, TECHNAL curtain walling offers a fully capped, mullion-drained solution. With an aluminium substructure width of 52mm, it creates a slim sightline while also providing the necessary strength and inertia requirements.Contributing to higher credits for the critical Energy 01 part of BREEAM, which is concerned with the reduction of energy use and carbon emissions, TECHNAL A-rated Dualframe 75 Si windows offer exceptional energy efficiency. For the Yale campus, a U-value of 1.1W/m2K was achieved. As well as being inserted within the curtain walling, the windows have also been fitted in a vertical panel format to create a striking rectangular pattern within the gold cladding.
Sponsored
Amgen, Cambridge

Amgen, Cambridge

Rapid Ramp Limited

REQUIREMENT: The planned site improvements included relocating the loading bay and installing compliant access steps to the post room.ADDITIONAL INFORMATION: CAD and technical drawings were designed in-house and based on site measurements taken.END RESULT:We installed the modular access steps within a few hours. Once the installation was complete, the system was instantly usable. This allowed the post room to open within a quick turnaround time.The access steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
Butlins - Bognor Regis

Butlins - Bognor Regis

DCM Surfaces

DCM Surfaces installs synthetic surfacing at Butlins new pool complex in Bognor Regis.The project, which took two years to complete, accommodates almost 1,000 guests and has unique seaside and fairground-themed rides, a wave pool and a special area for toddlers.Kier was the successful bidder for the contract. Following a rigorous selection process based on quality, cost and Health and Safety, selected DCM Surfaces to install synthetic surfacing for three main areas around the complex.DCM Surfaces was in a unique position to deliver all elements of synthetic surfacing, which included the installation of an Artificial Grass safety surface, Resin Bound Gravel pathway, and Rubber Mulch, which was used to fill several tree pits. A core requirement of the installation was that each surface would be permeable, allowing water to drain through and ensure that it could be used all year round.A Rubber Shockpad was installed beneath the Artificial Grass to give children a soft, impact-absorbing layer to run and play with.The installation, completed on March 19, covered an area of over 1000 sqm.
Sponsored
Anna Freud Centre, London

Anna Freud Centre, London

Kawneer UK Ltd

Parallel opening window vents by Kawneer were specified for a mental health project that is arguably without parallel. Some 88 AA®100 SSG parallel opening vents were used as concealed windows, to maintain the same aesthetic as the façade, within AA®100 mullion-drained curtain walling and AA®720 doors on the new £40 million London headquarters of the world-famous Anna Freud National Centre for Children and Families.The Kawneer systems at the Anna Freud Centre were specified by architects Penoyre & Prasad as they were a “cost-effective” solution to their needs and enabled them to use the same systems for all areas of curtain walling and rooflights. The project has enabled the relocation of the mental healthcare charity to bring together its global expertise in practice, research and policy under one roof from its residential properties in Hampstead to a purpose-built facility near King’s Cross. This comprises a six-storey new-build and the refurbishment of a century-old former chocolate factory and warehouse.
Sponsored
Gardens Sorted

Gardens Sorted

Lindab Ltd

Eco conscious barn conversion Landscape Design company Gardens Sorted specialise in renovation and bespoke garden installations. This project is a former farmyard and threshing barn conversion, the brief was to follow sustainable principles, the artifacts used around the garden are largely reclaimed, reused or recycled agricultural items.The client gardens by organic principles therefore the need for non-PVC galvanised rainwater goods was paramount. Chris Bligh, designer and installer at Gardens Sorted describes the installation: ”The rainwater solution required the high roof gutters to be deep profile, maintenance free, non-blocking outlets, and a long elegant downpipe into the storn water drain accross the yard. The addition of a rainwater diverter at the lower section afforded connection to a pressure water hose under grounded to two bends emptying into a reclaimed galvanised water tank. The hose is always full of water to the height of the tank. The important value of this is that the client can then dunk a large watering can into the deep water at waist height.” Chris adds that Lindab’s Rainline products are very good and he was grateful for a high standard of customer service.
Sponsored
Museum of London - Visionary Roof

Museum of London - Visionary Roof

Bauder Ltd

Museum of London - Visionary RoofSynopsisThe Museum of London opened in 1976 on the historic London Wall and is a few minutes’ walk from St Paul’s Cathedral. A visionary approach to roofing had been adopted on a building that, will not only green as much of the exposed roofs as possible, but also provide a strong research aspect for future green roof projects. As with many buildings, the original roofs needed to be upgraded or replaced, at the same time as being brought up to date using environmental and sustainable solutions.Through the recommendation of waterproofing and green roof manufacturer Bauder Ltd, the Museum invited Dusty Gedge, one of the UK’s leading independent green roof consultants, to work directly with them to design 3500m² of varying habitats that encompassed the museum’s sustainable vision. and help in the provision of environments that would attract a range of wildlife, as well as being able to help the city adapt to climate change.Bauder Building BoardProject:Visionary roof, Muesum of LondonLocation:LondonProject type:RefurbishmentRoof size:9512m²Specifier:Museum of LondonRoofing contractor:Russell Trew LtdThe specificationAn independent consultant had previously carried out an energy model on the Museum of London buildings. When the museum inputted the green roof specification, it showed a potential energy saving of 10% per year, as well as a reduction on the future replacement costs of the heating and cooling plant. Some of the green roofs were funded through Drain London, a partnership project led by the Greater London Authority and funded by Defra. The project aims to better understand surface water flood risk across London, with a view to promote interventions (such as green roofs) to reduce surface water flooding. The museum has used the Bauder green roof system and worked closely with Dan Costen of Bauder and the roofing contractor Russell Trew Ltd, to deliver the various green roof spaces.These include:The refurbishment of the lower garden in the central courtyard with hard landscapingThe installation of Bauder’s new wildflower blanket to the upper garden in the central courtyard (funded through Drain London)Plug planting the roofs of the recently completed garden and terrace rooms that provide high quality corporate hire (matching the colour scheme chosen for the rotunda garden refurbishment and integrated with the new rainwater harvesting system funded by Renaissance London)An integrated sustainable urban drainage system (SuDS)Plug planting in other individual small roof areas including outside the boardroom and committee roomsTwo different planting schemes on an area of the main museum roof where the Drain London Project aims to carry out water attenuation researchThe resultRetrofitting green roofs will help to realise the Mayor of London’s ambition, to increase green cover in central London by 5% by 2030. The Museum of London is one of the largest retrofit green roof projects in the City and is certainly to be commended for allowing its roofs to be used for research purposes. Not only will it provide a benchmark for best practice, but it also demonstrates that retrofitting green roofs onto existing buildings is both environmentally and economically viable and is the way forward in helping London adapt to climate change.System installedBauderflex Green 1 BauderPLANT E 42A torch applied SBS elastomeric bitumen capping sheet. This product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL2 BauderTEC Sprint DUOA self-adhesive elastomeric bitumen underlayer with DUO lap technology. This product has a glass fleece reinforcement feature for stability and strength.3 BauderPIR FA-TEFlatboard insulation boards containing rigid polyisocyanurate (PIR).4 BauderTEC KSD FBSA self-adhesive SBS elastomeric bitumen air & vapour control layer, with a mica finish.XF 301 Sedum System1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green.AdvocacyGavin McCourt MRICS, Project Manager for The Museum of London said:“In producing the business case for installing green roofs, reference was made to the extensive published documents on the benefits of green roofs. In this case as the museum building had already been energy modelled by outside consultants, it was decided to input the green roof specification into the model. The results showed a potential energy saving of 10% per year, as well as a reduction in future replacement costs for heating and cooling plant. These factors, combined with the longer life cycle replacement of green roofs compared with normal felt roofing systems, enabled me to produce a robust business case for green roofs. With increasing energy prices the economic benefits of installing green roofs can only become more viable”Dusty Gedge added:“One of the major issues that London faces is flash floods during the summer, when sudden rainfall levels overwhelm the current drainage network. With the support of Drain London we will be researching the rainwater run-off for different green roofs. This will help us validate the kind of roofs and depth of substrates that will negate the costly effects that the sudden rainfall has on the infrastructure of the City.”
Sponsored
ADDACOLOR AND ADDASET RESIN BOUND  WORLD MAP FOR PORTOBELLO SCHOOL COURTYARD

ADDACOLOR AND ADDASET RESIN BOUND WORLD MAP FOR PORTOBELLO SCHOOL COURTYARD

Addagrip Terraco Ltd

Addagrip Terraco approved contractor Resarf Flooring Ltd has completed a 3500m2 resin bound installation for the new High School in Portobello on the outskirts of Edinburgh. Using Addaset resin bound and Addacolor resin bound coloured surfacing the main feature was the creation of a distinctive world map design.The project funded by the City of Edinburgh Council includes a new building for 1,400 pupils at the site in Portobello Park, sympathetically designed by JM Architects with the landscape in mind.SURFACING REQUIREMENTThe new paving around the school needed to be low maintenance and durable with good slip resistance. The project also required a colourful durable surfacing product to create a resin bound map of the world to be installed adjacent to the Geography department for use during lessons. Designed in contrasting Addacolor Blue and Addaset Lucerne Silver, the map design sets off the area beautifully and should hopefully encourage the pupils to get outdoors and ‘see a bit of the world’. Addaset Lucerne Silver was also installed to the forecourt and rear courtyards of the school to provide a free draining natural silver granite effect surface to complement the colour of the new building.The new school opened to pupils in October 2016.
Sponsored
Basingstoke Hospital, Basingstoke

Basingstoke Hospital, Basingstoke

Rapid Ramp Limited

PROJECT BACKGROUND: A mobile trailer was adapted into a Covid PCR Testing Laboratory.The staff test 6-7 thousand saliva pots every three weeks.REQUIREMENT: Temporary modular steps to replace the existing ones to the trailer. The current steps were too steep and narrow, with no handrails and platform.END RESULT: We installed fully compliant temporary steps, which included infill handrails and a platform for turning space.We matched the hire period for the mobile laboratory. Once no longer needed, the steps will be removed by our installation team. Removal is a service included in our rental package. The steps are fully compliant with documents M & K of the building regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of each step. Additionally, it helps users distinguish any level changes.Trombone Ends - these are added to the ends to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Continuous Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
Broomfield Primary School - Alumasc Rainwater GX & Flushjoint

Broomfield Primary School - Alumasc Rainwater GX & Flushjoint

Alumasc Water Management Solutions

Excellent service and communication sees Broomfield Primary School extension completed on time with AlumascBroomfield Primary School in Essex has benefitted from multiple water management installations from Alumasc to complete its brand-new extension. These included Skyline aluminium Fascia and Soffits, GX pressed aluminium box gutters and Flushjoint aluminium downpipes.The specification of the integrated ‘Rain to Drain’ Alumasc Skyline and Rainwater ranges came as a result of Alumasc’s highly regarded product offer and strong working relationship with subcontractor on the project, Ipswich based Specialised Fixings Ltd.John Hemphill, Technical Sales Manager at Alumasc, explained: “Specialised Fixings is one of our Alumasc recommended installers that we have collaborated with on many projects.“This good working relationship which hinges on a high level of communication and readily available service and support from our products and technical teams, is what ensured we finished this project on time, to the highest specification.“Meeting deadlines can be a challenge for some ambitious projects, but certainly this year it has been for the whole industry!John continued: “We are very proud that our Alumasc Technical Services and Technical Sales Managers are able to provide such in depth help and support to our recommended installers and subcontractors, which benefits them out in the marketplace."
Sponsored
HANPAVE™

HANPAVE™

Hahn Plastics Ltd

CHALLENGEIlam Park was a popular tourist destination in the Peak District with a parking problem. The main car park is paved with asphalt but their sloped overflow car park suffered from rutted, unsafe and uneven surfaces due to poor drainage and puddling. More asphalt would create water runoff and drainage problems elsewhere so a permanent and durable permeable paving solution was required.SOLUTIONHanpaveTM was chosen as it’s a freedraining system that’s tested to bear almost any vehicle. There are no more problems with rutting or uneven surfaces. It’s also highly durable, weather-resistant and made from 100% recycled plastic. When installed on a properly engineered permeable base (no pipes or ducting required!), it can be in-filled with gravel or grass for an attractive, stable base that becomes virtually invisible to the average user.CONCLUSIONHanpaveTM was installed in 2019. We called in on a very wet day in November 2022 and the HanpaveTM grids were in excellent condition. Surfaces were even, rutting was gone and, even in torrential rain, puddling could only be found in areas paved with asphalt – not HanpaveTM. Despite some extremely hot summers, Hanpave’s unique expansion absorbing design and professional installation have given Ilam Park an effective, longlasting and attractive solution to their overflow parking problems.
Sponsored
Precision Micro, Birmingham

Precision Micro, Birmingham

Remmers UK Ltd

Precision micro, a UK based manufacturer of precision metal components for the automotive, aerospace and pharmaceutical industries were investing in a refurbishment of their photochemical etching facilities. The state of the art facility required a highly chemically resistant easy to clean floor finish. Various existing substrates needed to be pulled together to create one seamless finish with an integrated cove. Due to the chemicals utilised in the area, there is a risk of airborne corrosives attacking the metal ceilings, so an acid resistant protective coating was also required overhead.After extensive trials and chemical exposure testing, Remmers resin systems were selected for the works. For the ceiling, Epoxy BS3000 SG provided chemical protection to the galvanised steel surface and exhibited excellent adhesive properties after the steel was prepared using an ice blasting process. The floors were a mixture of existing resin finishes, new concrete and Polypropylene drain covers. A selection of priming solutions for the different areas were utilised including, Epoxy ST100, Epoxy MT100 and Epoxy BS3000 SG. Then topped with Epoxy Flex PH laid at 2mm and sealed with PUR Top M+. Integral coved skirting was installed to all perimeters, 100mm high.Want to know more? Click here and read the details on our website.
Sponsored
Yattendon C Of E Primary School, Yattendon

Yattendon C Of E Primary School, Yattendon

Rapid Ramp Limited

REQUIREMENT: Compliant ramped access to the recently built outdoor classroom. END RESULT:The ground in the front of the entrance is split between tarmac and a barked area. The tarmac is slightly higher and solid, whereas the barked area is a soft surface. Due to this, weed membrane was rolled over the barked area, and the ramp feet on that side were fixed to concrete slabs.All legs were adjusted accordingly to achieve a level walkway with a compliant gradient of 1:15.The ramp fully complies with Document K and M of the Building Regulations.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Telescopic Legs - these can be adjusted to accommodate different threshold heights.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard colour: Black - Ramps are powder coated black to create a durable finish that is tougher than conventional paint.
Sponsored
London Screen Academy, Islington

London Screen Academy, Islington

Kawneer UK Ltd

Architectural glazing systems by Kawneer, including aluminium heritage-style GT70S windows appropriate for the conservation area, have helped to transform the façade of an old radio and television factory into the new four-storey London Screen Academy building at Highbury Grove in Islington, north London.Kawneer’s GT70S slimline renovation open-in windows were the “focal new element” of the renovation of the façade of the four-storey building at Highbury Grove in Islington, north London, where Kawneer’s AA®100 zone-drained curtain walling and series AA®190 TB entrance doors also feature.The GT70S windows with narrow sightlines were installed over 12 weeks by a team of eight from specialist sub-contractor and Kawneer dealer JPJ Installations throughout the 8,050m2 building, with the AA®100 curtain walling, which also has narrow 50mm sightlines, used on the rear elevation and the series AA®190 TB severe-duty welded doors used on the main entrance.This cutting-edge new free school by the Department for Education provides world-class film industry focused vocational training, including behind-the-camera roles, costume design, production management, distribution and marketing, alongside a broader curriculum, for 17 to 19-year-olds.
Sponsored
Waterproofing Solution BS 8102:2009

Waterproofing Solution BS 8102:2009

Delta Membrane Systems Ltd

The scope of the project was to facilitate a waterproofing solution for a substantial brick built detached property with a large 3 elevation basement situated at the bottom of a steep sloping driveway. The basement when constructed had 1 form of external waterproofing incorporated during the build stage, however the system required a second form of internal waterproofing due to the location of the structure and high-water table, capable of protecting the luxurious basement from unwanted water ingress.The property’s driveway significantly slopes from street level to the front elevation of the property requiring a specialist waterproofing system to protect the structure.Working in conjunction with the homeowner, Timberwise’s CSSW qualified waterproofing surveyors specified a Delta Type C (Drained) Protection waterproofing system to provide the necessary Grade 3 (habitable environment) to enable to homeowner to fully utilise their basement space. For Grade 3 habitable environments, two types of waterproofing may be required.A Waterproofing Designer’s philosophy defines what they wish to accomplish in the design of their waterproofing system and which principles they will use to do so. Identifying a robust and suitable design philosophy is an important aspect when designing a continuous system, as this will not only directly impact in how users install the system but also in future maintenance which will directly impact on the property owner.
Sponsored
Tottenham Hotspur Stadium - Gatic SlotDrain, Harmer SML & Wade Floor Gullies

Tottenham Hotspur Stadium - Gatic SlotDrain, Harmer SML & Wade Floor Gullies

Alumasc Water Management Solutions

With the reputation of the illustrious Tottenham football club preceding it, the new Tottenham Hotspur Stadium is an emblematic building that has already secured its place as a sports stadium to be remembered.It has also become one of the more renowned and iconic spaces to have benefitted from Alumasc WMS expertise, receiving the full ‘rain to drain’ treatment.Comprising five core brands and more besides, Alumasc WMS was brought into the project to provide cohesive, integrated water management throughout the project. This eventually included the installation of Gatic Slotdrain systems, Gatic Access Covers and AssistLift Covers, Harmer SML below ground Cast Iron drainage and Wade floor gulliesto ensure effective water management all round.Completed in 2019, the 62,303-capacity stadium is one of the largest in the Premier League and the largest club stadium in London. The state-of-the-art sports and leisure centre can stage major events including football games, NFL American football games and rugby, as well as concerts and other non-sporting events.Populous Architectural Design were the architects on the project, however, it was Buro Happold Engineering that specified Gatic Drainage and Access Covers, Harmer below ground cast iron drainage and Wade floor gullies from Alumasc WMS for the task.
Sponsored
Berwick Leisure Centre

Berwick Leisure Centre

Senior Architectural Systems Ltd

This new £22m state of the art leisure centre in Berwick, Northumberland, has been designed by GT3 Architects and features a striking glazed façade created using Senior’s slim profile SF52 curtain wall system.Senior worked closely with specialist contractor Crown Doors and Shutters Limited and main contractor Tolent Construction Ltd to deliver the landmark leisure scheme which is set to breathe new life into the area by replacing the town’s previous leisure centre. To ensure the town’s existing Swan Centre could remain operational throughout, the new leisure centre was constructed in two phases with the project team working closely to carefully coordinate each element of the build to limit the disruption to the local community.As well as creating an inviting and welcoming main entrance, the thermally-enhanced SF52 aluminium curtain wall system will also help improve the energy-efficiency of the scheme whilst maximising the use of natural daylight.Senior’s SF52 aluminium system features attractive slim sightlines and enhanced thermal performance to help boost energy-efficiency. Available as a mullion drained system which removes the need for visible drainage slots, Senior’s SF52 curtain wall can be specified as capped, silicone sealed or as a combination of the two for even greater design flexibility. Thanks to Senior’s in-house powder coating facility, the SF52 system is available in an almost unlimited range of colours and finishes.
Sponsored
Altro Stronghold 30 elevates kitchen safety

Altro Stronghold 30 elevates kitchen safety

Altro

IssueEstablished in 1916, Doylestown Country Club is a private country club located in Pennsylvania, USA. In addition to its reputation as one of the top golfing destinations in the state, the Doylestown Country Club’s culinary team strives to create memorable dining experiences for all members and guests. To achieve this goal, the country club has created a new space to elevate kitchen safety and ensure efficient back-of-house operations.ApproachDoylestown Country Club wanted a floor that would provide comfort for their staff, who spend prolonged periods on their feet. Other considerations including reducing noise transferrence in a busy commercial kitchen and having a floor that could be installed around the kitchen drains which required a watertight, seamless transition with the flooring.SolutionAfter consultation between the Altro sales and technical teams, together with the flooring installer and specifier, 350sqm of Altro Stronghold 30 was specified, keeping staff safe from slips and helping to reduce fatigue thanks to its 3mm thickness.Altro Stronghold 30 achieves Altro’s highest rating for slip resistance (PTV ≥55, R12) and is designed to minimise risk in wet and greasy conditions for the lifetime of the flooring. As well as helping to keep staff safe from slips, it also helps reduce their fatigue, thanks to its 3mm thickness which provides noise reduction and comfort underfoot.
Sponsored
National Maritime Museum, London

National Maritime Museum, London

FOAMGLAS®

FOAMGLAS® T4+ (Slab)Design Architects: C.F. Moller & Purcell Miller TrittonMain Contractor: Bovis Lend LeaseApplication: Compact Roof - Gallery Roof & Restaurant Terrace FOAMGLAS® S3 (Slab )Finish: PaversFOAMGLAS® insulation was specified for the new gallery terrace and restaurant of the National Maritime Museum. With limited height available upon the roof there was no space for a concrete screed to falls. Therefore, architects Purcell Miller Tritton needed a factory machined tapered insulation with a slope to shed water. In addition, the limestone terrace paving must withstand the loads imposed by vehicles and so the insulation beneath had to withstand these dynamic loads without any compression.FOAMGLAS® T4+ slab insulation was specified for the project due to these conditions. FOAMGLAS® does not move or deflect under loads, and is available factory machined with a tapered slope. Its thermal performance is reliable and permanent and it is guaranteed for the lifetime of the building. The new roof of the gallery has paved areas, and green planting with hidden drain age and water supplies.The restaurant terrace gives wonderful view of the World Heritage Site, Greenwich Park and the Royal Observatory. The gallery has some fascinating objects; including jewels which belonged to Sir Francis Drake, journals written by Captain Cook’s during his long voyages, and personal items that survived the sinking of HMS Titanic.
Sponsored
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Rapid Ramp Limited

PROJECT BACKGROUND: Patients, staff, and visitors for the Oxford Road site of Manchester Royal Infirmary use the linking Hathersage Road Car Park daily.REQUIREMENT:A compact internal ramp for the level 2 and level 7 entrances.END RESULT:Two small internal ramps with bespoke yellow handrails and a 1:15 gradient were installed within a few hours. Our ramps come in components that were small enough to be carried into the carpark lift and onto the levels.The ramp feet were bolted into the ground to keep the systems securely in place.FEATURES INCLUDED:Standard Handrail - this handrail system ensures users always have support to hold onto.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Powder coated Finish – rails are coated with thermosetting powder to provide a non-conductive, non-slip and scratch resistant surface.Telescopic Legs - these can be adjusted to accommodate different threshold heights.EXTRA FEATURE INCLUDED:Yellow Powdercoated Handrails – yellow is one of the easiest colours to see because of its ability to reflect light.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and level changes.
Sponsored
Waverley House, Soho

Waverley House, Soho

Rapid Ramp Limited

REQUIREMENT: A modular step unit and upper landing to the basement goods lift.The new system would replace the narrow concrete steps, which were concluded to be unsafe and didn’t have handrails to prevent falls.ADDITIONAL INFORMATION:A site survey was carried out, and an in-house 3D ramp design was drawn to suit the space.The drawing shows that the air conditioning unit above the step unit would need to be moved 200mm away. END RESULT: We installed a yellow modular system straight over the existing steps within a few hours.This approach prevented the concrete steps from being removed and saved the client the extra time and money involved in hiring another trade to complete the enabling works. A bespoke platform joins the upper landing, and the feet were fixed into the concrete floor to keep the system securely in place.FEATURES INCLUDED:Trombone Ends - these are added to the ends of a step system to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Standard Colour: Yellow – one of the easiest colours to see because of its ability to reflect light. The handrails are powder coated to create a durable finish that is tougher than conventional paint.Standard Handrail - this handrail system ensures users always have support to hold onto.
Sponsored
BTR Towers, Erie Basin, Salford Quays, Manchester

BTR Towers, Erie Basin, Salford Quays, Manchester

Kawneer UK Ltd

Architectural glazing systems by Kawneer were specified for their “robustness and quality” for two linked 16-storey apartment blocks on the last plot to be developed in one of Britain’s fastest-growing property hot spots - the £37 million BTR (Build To Rent) towers at Erie Basin in Salford Quays, Manchester, a stone’s throw from MediaCityUK.Kawneer’s AA®100 curtain walling features as strip curtain wall to copper-coloured rainscreen areas of the towers at Erie Basin. In addition, AA®110 curtain walling features on link bridges and as floor-to-ceiling screens facing the water. While the AA®100 system uses 50mm sightlines, the AA®110 system uses 65mm but both in this case were zone-drained. They are complemented by AA®541 open-out casement window inserts and AA®720 ultra thermally-efficient entrance doors.The Kawneer systems were installed over eight months by a team of up to 35 from approved specialist sub-contractor FK Group for main contractor GRAHAM and client Glenbrook, the privately-owned property development and investment company, who acquired the site from the Peel Group.The prominent dockside development is GRAHAM’s second project with Glenbrook, with work also underway on another £27 million BTR project in Ellesmere Street, Castlefield, Manchester, which also features Kawneer systems.
Sponsored
Associated British Foods Regional HQ, Peterborough

Associated British Foods Regional HQ, Peterborough

Kawneer UK Ltd

Architectural glazing systems by Kawneer were specified as a “key aspect” of the new regional head office of British Sugar’s parent company, the FTSE 25 Associated British Foods (ABF), for their pedigree and quality.CPMG Architects selected products from all of Kawneer’s portfolio for the building on a 4.5-acre site at Cygnet Business Park, Hampton, Peterborough, which would enable the relocation of almost 400 people from ABF businesses locally (AB Sugar, British Sugar, AB Mauri, ABF Ingredients and ABF) with the addition of purpose-built conference and training facilities and a showcase central reception area. Kawneer’s aluminium AA®100 SSG (Structurally Silicone Glazed) curtain walling features on the ground floor reception, meeting/conference spaces and south-facing restaurant/café while AA®100 mullion-drained curtain walling has been used on the first and second floor open-plan offices of the three-storey building.In addition, the 5,755m2 (GIA) building features ultra-thermally efficient AA®720 doors, large (3m high by 9m wide) AA®3572 sliding doors and over-sized (2.4m by 0.7m) AA®720 parallel opening windows, all installed by approved specialist sub-contractor Norman & Underwood.
Sponsored
Weigh Cabin Platform & Steps, Birmingham

Weigh Cabin Platform & Steps, Birmingham

Rapid Ramp Limited

PROJECT BACKGROUND: The construction of weighbridges and a weigh cabin.The cabin will be elevated 1.5m above ground level on support columns.Lorries will drive up to the cabin for initial checks before the weighbridges are used to calculate the load by weighing the lorry when empty and when loaded.REQUIREMENT:A walkway around the cabin in a L shape with steps to allow the site operatives access. ADDITIONAL INFORMATION:2D and 3D CAD drawings were created by our designer in-house. These were given to the client with their quotation.END RESULT: A Rapid Ramp platform was raised around 1.5 metres high and included steps. The appropriate height was reached with adjustable telescopic legs. Plus, cross bracing was achieved using longer length tubes to ensure rigidity under all platform legs.The system was completed within a quick three-day turnaround time.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of a step or level change.Trombone Ends - these are added to the ends of a step unit to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.1100mm High Rail – these handrails attach to any level sections.Continuous Handrail - this handrail system ensures users always have support to hold onto.Standard Colour: Black - Black is the standard handrail colour. Handrails are powder-coated to create a durable finish that is tougher than conventional paint.
Sponsored
St George's Hospital, Roehampton

St George's Hospital, Roehampton

Rapid Ramp Limited

REQUIREMENT: Two temporary laboratories were planned for installation in the hospital parking lot.It was determined that a ramp with a wide platform was necessary to accommodate the diverse range of daily users of the system, including those operating patient-moving equipment, carts, and pedestrians accessing the cabins.END RESULT:A fully compliant ramp featuring an extra-wide metal walkway was designed and successfully installed. This product boasts a secure loading capacity of over one ton!FEATURES INCLUDED:Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.1100mm High Rail - 1100mm handrails are attached to any level sections.Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.Rest Platform - a rest platform at 5 metres is required to allow the user to pause.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED:Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.
Sponsored
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln

Rapid Ramp Limited

REQUIREMENT: In order to enhance wheelchair accessibility to the cathedral, it was necessary to install both internal and external ramps to overcome the steps.END RESULT:Great care was exercised when installing the ramps to preserve the cathedral's floors and walls. These ramps do not require any ground or wall attachments; once the components are securely bolted together, their weight ensures stability. Additionally, slip-resistant rubber tiles have been placed beneath each support foot.Should wedding parties wish to take photos at the entrances without the ramps in the frame, these systems can be easily disassembled before the event and reinstalled afterwards. This flexibility is a unique advantage neither wooden nor concrete ramps can offer.FEATURES INCLUDED: Mesh Platform - self-draining mesh allows water to pass through rather than collect on the surface.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Telescopic Legs - these can be adjusted to accommodate threshold heights.Standard Colour Black - ramps are powder-coated black to create a hard finish that is tougher than conventional paint.EXTRA FEATURES INCLUDED:Infill Handrail - this product prevents children from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and helps users distinguish any level changes.Standard Step Unit - an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
Remedial Basement Waterproofing

Remedial Basement Waterproofing

Delta Membrane Systems Ltd

When it comes to residential, commercial or any structure below ground, waterproofing is a critical component within the construction process for protecting and preserving a building. A poorly designed or installed waterproofing solution can fail leading to significant implications on the structure itself.Delta Registered Installers, Abtech (UK) Ltd were called upon to give assistance on a particularly technically complicated project where approaches to waterproofing design and installation had been incorporated, however the system had failed. For a great remedial waterproofing outcome, seek assistance from an experienced waterproofing company to inspect your site and carry out the remedial work.The property when built had a Type C, cavity drain membrane systems incorporated (not a Delta System), however there was no basement drainage incorporated into the design to manage water ingress.In principle a Type C, drainage system is a water management system. The Type C system is used to control water ingress once it has penetrated the structure.  Moisture or running water travel behind the Type C membrane within a controlled drainage system. A Type C System isn’t classified as a barrier but provides protection by means of water management. For a Type System to be successful a suitable drainage system is required to collect and discharge water ingress to a suitable and safe evacuation point (either by natural forces or a mechanical pump system).When correctly installed, groundwater drainage channels effectively relieve hydrostatic water pressure in the below ground structure. They are installed below flooring membranes at the floor/wall junction.
Sponsored
Degafloor Quartz Trowelled Aggregate - Long Clawson Dairy Resin Flooring

Degafloor Quartz Trowelled Aggregate - Long Clawson Dairy Resin Flooring

Degafloor Ltd

The well known traditional British cheese producer, Long Clawson Dairy, required dairy flooring renovation at their Melton Mowbray site. The refurbishment areas included a number of production areas, including the Cheese Room floor. The client needed a hardwearing, slip-resistant, hygienic flooring to cover areas of approximately 200m².Having previously worked with The National Flooring Company on other projects, the client contacted the Degafloor Approved Installer to ask for advice on the best solution for the upcoming works. As the factory is in constant production, attention to detail was required regarding dust and fumes.Drainage was another consideration for the dairy flooring. The drainage was required to be fully operational after the installation, so for best results the contractors recommended using the Degafloor Quartz Trowelled with Aggregate resin flooring. QTA is a trowel-applied system with a quartz scatter finish that will not run into the drains upon application.Long Clawson Dairy needed a flooring solution that could be installed quickly and deliver long-term performance. Degafloor resin systems are based on ultra fast curing methyl methacrylate technology that enables rapid installation and cures as fast as two hours after application.The dairy flooring project was completed in just 6 days over 2 separate shifts. The fast curing properties of Degafloor MMA resin flooring enabled production to commence just 2 hours after the new floors and coving were installed. The Operations Director of Long Clawson Dairy was extremely happy with the end result.
Sponsored
Manchester Airport, Manchester

Manchester Airport, Manchester

Rapid Ramp Limited

PROJECT BACKGROUND: Work had begun on the airport’s 10-year, £1 billion transformation programme. The airport hoped ’the programme would “transform passenger experiences and help attract yet more of the world’s leading airlines” (The Manchester Airports Group: 2017).REQUIREMENT: Our assignment involved the installation of semi-permanent wheelchair ramps in the temporary lounge. These ramps were designed to offer temporary wheelchair accessibility for both visitors and staff.The lounge plays a pivotal role in the larger transformation initiative, facilitating the redevelopment of the current Terminal 2.END RESULT:Our skilled installers effectively constructed ramps on the airport runway's eastern and southern sides, meeting the scheduled timeline and budget requirements.FEATURES INCLUDED: Infill Handrail - this product prevents users from climbing or falling through gaps.Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp and to help users distinguish any level changes.Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.Mesh Platform - the self-draining mesh allows water to pass through rather than collect on the surface.Rest Platform – a rest platform at 5 metres is required to allow the user to pause.1100mm High Rail – these handrails attach to any level sections. Continuous Handrail - this handrail system ensures the users always have support to hold onto.EXTRA FEATURE INCLUDED: Fully Compliant Step Unit – an ideal addition to any ramp installation, providing the access needed for able-bodied users. They can also be stand-alone units, independent of the Rapid Ramp System.
Sponsored
Waterproofing the Houses of Parliament

Waterproofing the Houses of Parliament

Newton Waterproofing Systems

Waterproofing this historic London landmark – external waterproofing with Newton 403 HydroBond, internal waterproofing with Newton System 500, installed by Newton Specialist Basement Contractor MacLennanUK.Newton Waterproofing were delighted to return for this project at the prestigious Houses of Parliament in London, a landmark that has dominated London’s skyline for over 150 years. Newton Specialist Basement Contractor MacLennan Waterproofing was approached to specify a guaranteed waterproofing solution for the new-build basement.After reviewing the technical drawings, MacLennan decided to bring the job to Newton, whose product range was perfectly suited to the project requirements. Newton and MacLennan are both privileged to be the companies chosen to share in securing the future of the Palace of Westminster.This complex project required the design and installation of an external waterproofing system, an internal cavity drain system, and a polyurea roofing system to ensure a high standard of waterproofing.Externally, Newton’s innovative ‘Type A’ 403 HydroBond membrane was applied extensively to ensure the necessary waterproofing around the basement, whilst internally, Newton 508 and Newton 520 membranes were both applied from floor to ceiling as part of Newton’s complete System 500 cavity drainage solution. With the finished structure in place, the waterproofing was finally completed by the application of both a polyurea coating and further drainage membrane to the roof deck of the basement.With a waterproof basement fully compliant with the requirements of BS 8102:2009, coupled with guaranteed protection against water ingress, this newly completed, large basement area, situated directly next to the River Thames, provides a durable and well-established waterproofing solution, utilising multiple Newton Systems to great effect.
Sponsored
Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Nottingham Trent University’s Clifton Campus Library - Alumasc Harmer Aluminium Roof Outlets, GX Gutters & Heritage Aluminium Pipework

Alumasc Water Management Solutions

Alumasc Rooflights provided an ideal solution to allowing natural daylight into the building from above. The unique kerb design incorporates both security and waterproofing to create a reliable, safe and secure rooflight, allowing horizontal termination of the waterproof membrane. This makes water penetration virtually impossible. The domed glazing is moulded from Marlon FSX Longlife, premium quality solid polycarbonate, which has an impact resistance up to 200 times that of glass.Technically sophisticated, Harmer AV high-performance aluminium roof outlets are chosen for this project as they guarantee a trouble-free performance and are especially suited to flat roofing applications featuring continuous membranes.Harmer AV roof outlets combine innovative product design with full industry compliance to meet the needs of rainwater drainage in any construction project, with the ability to drain up to 40% more roof area than conventional gravity outlets. Further to this, their lightweight, durable, non-corrodible design means that they will do so for up to 40 years.GX Pressed Aluminium Gutters are robust box section gutters designed for traditional wet jointing on site. They’re especially suited to applications where maximum capacity gutters are required. For the very large drainage area of the campus roof, they were perfect.Designed to fully accommodate thermal movement at every joint, they are lightweight, durable and noncorrodible, and, upholding the environmental prerequisites of this project, they are 100% recyclable.Finally, Heritage Circular Pipes are available in 4 pipe diameters and 3 pipe lengths, together with a complete range of fittings. Can be factory finished to replicate cast iron or with BBA certificated powder coatings in a range of colours.
Sponsored
Listed Vault Waterproofing in Central London

Listed Vault Waterproofing in Central London

Newton Waterproofing Systems

Beneath the streets of Central London lies a network of Grade 2 Listed underground vaults. As Newton Specialist Contractors, Stonehouse were called in to waterproof four of these impressive structures and turn them into a completely dry commercial space. The four vaults were situated just North of the River Thames in Central London, a short walk from such famous landmarks as Smithfield Market and St Paul's Cathedral.The Grade II Listed structures are each over 4 metres in height, and form part of an impressive below-ground infrastructure network. Newton Specialist Contractor Stonehouse were asked to waterproof four of these impressive vaults for the multinational service provider KPMG, in order to turn them into useful commercial spaces.When waterproofing historic vaults such as these, the Newton CDM System provides the ideal solution as it is maintainable, requires minimal fixings and therefore avoids damaging the structure, and crucially is deemed as reversible should the structure need to be returned to its original condition in future.As an experienced contractor, Stonehouse proceeded with an expert installation of a full CDM System to the tricky vaults, including:508 Mesh membrane to the walls, for a direct plaster finish508 membrane and Fibran XPS 500-C insulation boards to the floor.Basedrain channels to direct any captured water towards two Titan-Pro sump chambers, each containing two NP400 pumps.Victron Inverter and a NorthStar battery for reliable backup power.Stonehouse completed an extremely complex and detailed cavity drain installation with precision, resulting in an exceptionally neat waterproofing system, and proving the benefits of using a specialist waterproofing contractor.
Sponsored
SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

SuDS Permeable Paving, Truckcell, Sevington Inland Border Facility, Ashford, Kent, UK

ABG

When Brexit terms were finally decided in 2020, the end to the freedom and movement of EU goods was agreed to begin from the 1st January 2021. HMRC therefore required an Inland Border Facility to be urgently mobilised to perform the new series of checks required on HGVs crossing the UK Border at the Port of Dover and the Channel Tunnel. This site acts as a location for checking movements of goods inbound (Defra and HMRC) and outbound (HMRC only).Each location is to include parking areas for HGVs and other vehicles, with security measures and facilities to enable the checking of vehicles and goods entering and exiting the sites. There are also temporary office buildings, staff and driver welfare amenities.The design of the facility onto 48ha of former agricultural land was developed with a view to maintaining the landscape and biodiversity of the surrounding area and to screen views of the site from the local villages.Excavated materials were sustainably reused as part of this process in order to create bunds, whilst surface water drainage of the site is directed to local wildlife ponds and wetlands via 30,000 square metres of aggregate filled Truckcell cellular paving.The site is trafficked by up to 950 HGVs at any one time and provides a free-draining, sustainable and durable SuDS surface to withstand the traffic levels without damage or abrasion.Throughout the project, ABG’s in house technical team provided design guidance and site installation support for the customer. Truckcell is a heavy duty cellular paving system manufactured from 100% recycled and recyclable plastic, capable of sustaining frequent HGV loads up to GVW 60 and 10 tonne wheels loads. It can be filled with angular gravel (as was the case on this project) or topsoil and grass seeded, according to the application.
Sponsored
Cherrywood, Ireland’s largest urban development

Cherrywood, Ireland’s largest urban development

Sto Ltd

More than 20,000m² of Sto’s external wall insulation system has been specified for two residential schemes at Cherrywood, Ireland’s largest urban development driven forward by real estate group Hines and its joint venture partners, APG Asset Management over the past seven years.Located on a 360-hectare site to the south of Dublin, Cherrywood is expected to serve a population of 25,000 people, offering more than 7,700 new homes, six schools, three parks and leisure facilities.Henry J Lyons Architects selected the StoTherm Mineral insulation system for apartment blocks forming part of the first and second phase of the residential construction. Now complete, the first scheme comprises 431 homes divided into two equally-sized blocks. The second consists of 520 units spread across three blocks and is due to be completed in Summer 2023. Sto installation work was carried out by applicators Platt Reilly.Consisting of mineral fibre insulation boards, the StoTherm Mineral system provides a high level of thermal performance and fire protection. It has been installed onto lightweight steel frames using Sto-Rotofix Plus. Thanks to a unique spiral design, these fixings help to create a seamless façade across all the blocks as well as a cavity behind the insulation board allowing any excess moisture to drain. Using the Sto-Rotofix-Plus, any unevenness in the substrate can be easily rectified by adjusting the insulation boards after they have been installed. This means there is no need for unsightly expansion joints and a smooth surface can be created ready for applying the render.All the apartment blocks will be finished with the StoSilco silicone resin render to provide high levels of water repellence and resistance to algae and fungus growth. 

Showing 73-108 of 125

Feedback