Verified by manufacturer 22 days ago
Wood decors
European Technical Approval (ETA)
Certificate type
UK Conformity Assessed (UKCA)
Certificate type
QA Certificate
Certificate type
EPD
Certificate type
Living Building Challenge
Certificate type
A facade solution designed to be durable, low maintenance and easily installed.
Suitable for use in a ventilated facade solution.
A facade solution designed to be durable, low maintenance and easily installed. Pura® NFC comes with a tailored collection of installation clips, colour-matched profiles and fasteners. The sidings come prefinished, and the edges don’t need sealing.
All Pura® NFC products are certified according to PEFC™ standard.
Features and benefits:
Color | Beige Black Brown Grey |
Finish | Matt |
Material | High pressure laminate (HPL) Guidance for specification option: Made of natural fibres with thermosetting resins and a decorative surface layer on one side. A transparent topcoat is added to the surface layer(s) and cured by Electron Beam Curing (EBC). |
Shape | Rectangle |
Length | 305 mm |
Width | 186 mm |
Height | 8 mm |
Warranty description | Ten year Guidance for specification option: Ten year standard limited warranty. Manufacturer guidanceTen year standard limited warranty. |
Uniclass | |
CAWS | H20/150 Sheet cladding (attached to metal support systems) H20/155 Sheet cladding (attached to timber battens) H92/120 Rainscreen cladding H20/10 Sheet cladding |
Product range |
Classification data | |
Grade | HPL/ BS EN 438-6/ EDF. |
Fire performance | To EN 13501-1, class B-s2, d0. |
Thickness | 8 mm. |
Panel size | |
Length | 3050 mm. |
Width | 186 mm. |
Edges | Square. |
Finish | Matt. |
Colour | Classic Oak. Guidance for specification option: PU02, Wood decors range. Western Red Cedar. Guidance for specification option: PU31, Wood decors range. Romantic Walnut. Guidance for specification option: PU08, Wood decors range. Tropical Ipe. Guidance for specification option: PU30, Wood decors range. Siberian Larch. Guidance for specification option: PU28, Wood decors range. Mystic Cedar. Guidance for specification option: PU24, Wood decors range. Aged Ash. Guidance for specification option: PU17, Wood decors range. Slate Ebony. Guidance for specification option: PU22, Wood decors range. |
Pattern | Wood decors. |
Standard | To BS EN 438-6. |
Country of material origin | Netherlands |
Country of product manufacture | Netherlands |
Material | High pressure laminate (HPL) Guidance for specification option: Made of natural fibres with thermosetting resins and a decorative surface layer on one side. A transparent topcoat is added to the surface layer(s) and cured by Electron Beam Curing (EBC). |
| Carbon dioxide equivalent | |
Carbon dioxide equivalent, as defined in BS EN 15804 Certified | |
Stage Normalised unit (kg CO₂ eq/kg) Declared unit (kg CO₂ eq/kg) Stage:A1–A3 ('Production stage') Normalised unit : 15.9 (kg CO₂ eq/kg) Declared unit : 15.9 Lower emissions | |
Expected Life | 50 year |
| Platform | Compatible | Version |
|---|---|---|
| - | 1 |
European Technical Approval (ETA)
European Technical Assessment (ETA) - Pura® NFC
UK Conformity Assessed (UKCA)
UKCA - Certificate of Constancy of Performance
QA Certificate
Certificate of bio-based content Pura® NFC
EPD
Environmental Product Declaration Pura® NFC
Living Building Challenge
International Living Future Institute - Pura® NFC
Affordable Employee Housing
Dalton Park: a fantastic makeover
Detached House Veluwe
Normandy Apartments
Self-build Beach House on Hayling Island
Senior Service Apartments
Shelton Eastlake Apartment Complex
Vermont Residence
Tufts Library
Wicstun Veterinary Group Hospital, York
Nieuwbouw Woonmensen, Deventer
City of Houston Public Works - NE Quadrant
The Reef Leisure Centre
Hollandsch Diep