NBS Source
I'm a manufacturer
AliDeck

AliDeck

The home of non-combustible aluminium decking and balcony component systems.

+44 (0)1622 235 672 Website

Sort by:

Showing 1-19 of 19

Sponsored
AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset

AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset

AliDeck

This elevated balcony project in Taunton is a great example. The goal of the project was to make the addition of large balcony areas to the rear of two adjacent houses, with large steel frameworks to be designed to provide the balcony level to the first floor.
Sponsored
Fire Safety Balcony Remediation in Poole, Dorset

Fire Safety Balcony Remediation in Poole, Dorset

AliDeck

The AliDeck System has rapidly become the de facto standard choice for balcony fire safety remediation projects. With our large range of non-combustible aluminium decking boards, joists, and pedestals our products offer practical and cost-effective solutions for any conceivable balcony refurbishment works.
Sponsored
AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment

AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment

AliDeck

The AliDeck team enjoyed another site visit up in the Big Smoke today as we travelled into London to take a look at an ongoing project that is using AliDeck aluminium decking.
Sponsored
AliDeck make site visit to see work-in-progress on installation of our modular balcony kit of decking, soffit cladding and balustrade to steel balconies

AliDeck make site visit to see work-in-progress on installation of our modular balcony kit of decking, soffit cladding and balustrade to steel balconies

AliDeck

Sheffield based Case Study using the AliDeck Balcony Kit, featuring the Vertical Infill Balustrades
Sponsored
AliDeck Trevor House Remediation Project, London

AliDeck Trevor House Remediation Project, London

AliDeck

The Trevor House remediation project in Knightsbridge, London, saw AliDeck partner with TetraClad to successfully remediate several key areas of the building. Trevor House is located in Central London just a few minutes’ walk from Hyde Park, and immediately opposite the world’s leading luxury department store, Harrods.
Sponsored
AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London

AliDeck

Installed by AliDeck Approved Installer, Alu-Installations, this terrace decking project used our 30mm Senior Flat Board to deliver a slip and fire-resistant deck to replace the existing timber.
Sponsored
Aluminium decking fire-safe replacement for flammable composite balcony decking

Aluminium decking fire-safe replacement for flammable composite balcony decking

AliDeck

Recent installation to a low-rise block of flats in High Wycombe. With flammable composite decking on the balconies, the building owner was keen to find a non-combustible alternative and our aluminium decking system was just the ticket!
Sponsored
Remediation Project at Horizons Assisted Living, Poole

Remediation Project at Horizons Assisted Living, Poole

AliDeck

The contractor for the project, Spetisbury Construction, replaced the existing composite decking boards with our non-combustible aluminium decking. The decking boards specified for this project were our ridged Senior Board, chosen for its strength and stability, but also for its excellent slip resistance. This was an important feature to help protect the elderly residents from falls in wet weather.
Sponsored
Balcony Remediation Project in Farringdon, London

Balcony Remediation Project in Farringdon, London

AliDeck

This refurbishment project in Farringdon had timber decking and joists on the balcony floors, the development was unable to pass fire safety assessments and required remediation. 
Sponsored
Lite Decking Board & A-Fence Aluminium Fencing & Gate, Birmingham

Lite Decking Board & A-Fence Aluminium Fencing & Gate, Birmingham

AliDeck

89 Branston Street, located within Birmingham’s City Centre, recently underwent a significant refurbishment. At the forefront of this transformation were AliDeck’s aluminium products, providing cost-effective, compliant, and futureproof solutions.The use of AliDeck Lite Board and A-Fence Aluminium Fencing & Gates across the decking area ensured that the project aligned with the latest in safety and design standards, offering residents a blend of style and sustainability.
Sponsored
Decking Replacement Project in Bermondsey, London

Decking Replacement Project in Bermondsey, London

AliDeck

Aluminium has been increasingly recognised as a viable material for construction products over recent years. With concerns over fire safety in external wall systems shifting the industry towards non-combustible solutions, the benefits specifically of extruded aluminium profiles, such as decking or cladding boards, have answered many of these new challenges.
Sponsored
AliDeck Lite Board in Eastbourne, East Sussex

AliDeck Lite Board in Eastbourne, East Sussex

AliDeck

AliDeck is extremely pleased to have such great feedback from first-time customer N.S Engineering, who recently completed work on the Macquarie Quay remediation project in Eastbourne, East Sussex, following a recommendation from a recent EWS1 survey that specified non-combustible materials should be used when renewing the balcony decking.
Sponsored
Stunning roof terrace completed at IET London Savoy Place, incredible views across the city from this beautiful space

Stunning roof terrace completed at IET London Savoy Place, incredible views across the city from this beautiful space

AliDeck

AliDeck is thrilled to have supported such a key remediation project at IET London: Savoy Place and on a recent site visit following completion we enjoyed the incredible views that overlook some of London’s most iconic scenery. The venue has been home to the Institution of Engineering and Technology (IET) since 1909 and hosts a wide range of events every year. It’s a real peach of a building, steeped in history.
Sponsored
Balcony Remediation at the Crawford Building in Whitechapel, London

Balcony Remediation at the Crawford Building in Whitechapel, London

AliDeck

A recent article on our website highlighted AliDeck’s involvement in the remediation work to be conducted at the Crawford Building in Whitechapel, London. Work has since been completed, and we are delighted to share the successful results with you here. Members of the AliDeck team recently joined Darren from Tranquil on-site to see the results first-hand.
Sponsored
Lite Decking Board Install at Fulham Reach, London

Lite Decking Board Install at Fulham Reach, London

AliDeck

AliDeck were fortunate to collaborate with Barretts of Aspley at the prestigious Fulham Reach development in London. Central to this project were key AliDeck products across the balconies: the AliDeck Lite Board, Low Joist, and Balcony Drainage System. These components underscore our commitment to supporting fire safety and effective drainage across multi-storey, multi-occupancy buildings with balconies, terraces, or walkways.This new-build development, located on the banks of the river Thames in a key conservation area, required safe, compliant, and aesthetically pleasing solutions to meet the standards of Berkeley Group, who specialise in brownfield regeneration and building quality homes.
Sponsored
Aluminium Cladding and Decking Solution for Balcony Refurbishment Project at The Kingsbury Building in Islington, London by Alu-Installations

Aluminium Cladding and Decking Solution for Balcony Refurbishment Project at The Kingsbury Building in Islington, London by Alu-Installations

AliDeck

We visited one of our approved installers to check out the refurbishment process underway at The Kingsbury Building project on Horsell Road in Islington, London. Alu-Installations installed our complete non-combustible balcony solution, using AliClad Flow aluminium soffit cladding and AliDeck Junior Ridged aluminium decking boards.
Sponsored
Decking & Balustrade Install at Kensington Aldridge Academy, London

Decking & Balustrade Install at Kensington Aldridge Academy, London

AliDeck

D1 Decking Solutions recently completed the remediation of Kensington Aldridge Academy’s terrace deck and balustrades, using the AliDeck Senior Ridged Board and AliRail Plate Fix systems. The transformation has created a fire-safe and futureproof environment.Recent years have seen a stringent review of current building regulations led by drastic changes outlined in BS 8579:2020, a welcome step forward in improving the fire safety of thousands of buildings across the UK.After careful consideration, AliDeck aluminium decking and AliRail balustrades were specified to ensure project success was achieved. Our products offer complete Aluminium balcony, terrace, and walkway solutions.
Sponsored
Manor Road Quarter, London

Manor Road Quarter, London

AliDeck

AliDeck successfully supplied a diverse range of cutting-edge aluminium balcony solutions to the Manor Road Quarter project in Canning Town, London. The AliDeck Ultra Decking Board, AliRail Plate Fix 0.74kN Option (AliRail System 2), and the aesthetic AliClad Flow Cladding Board will now create a complete balcony solution, as this collaboration with Alloy Fabweld showcases our commitment to innovation and technical excellence.
Sponsored
Roof Terrace Decking Replacement Indigo Blue, Leeds

Roof Terrace Decking Replacement Indigo Blue, Leeds

AliDeck

Our Approved Installer, JB Project Services, was tasked with the process of replacing the existing timber decking found on the external terrace area. This lovely space provides residents with a communal area that allows for panoramic views across the City of Leeds and is a key amenity for quality of life.

Showing 1-19 of 19