OVERVIEW
Recent installation to a low-rise block of flats in High Wycombe. With flammable composite decking on the balconies, the building owner was keen to find a non-combustible alternative and our aluminium decking system was just the ticket!
Junior Access Gutter
AliDeck make site visit to inspect installation of non-combustible aluminium terrace deck at Bermondsey penthouse apartment
AliDeck visit fantastic aluminium terrace decking installation at timber replacement project in London
AliDeck aluminium decking used on elevated steel-framed balconies on houses in Taunton, Somerset
AliDeck make site visit to see work-in-progress on installation of our modular balcony kit of decking, soffit cladding and balustrade to steel balconies
Waterproofing a 116-Bed Care Home, London
Basement Extension to a Grade 2 Listed Building, London
Structural Waterproofing Mixed Commercial Development
375 Kensington High Street