NBS Source
I'm a manufacturer
TapcoSlate Classic Fixing Guide

Installation instructions

TapcoSlate Classic Fixing Guide

by Tapco Roofing Products

For felt and batten roofs, start by fixing battens minimum size of 2" (50mm) by 1" (25mm) treated battens over underlay to the required gauge. The first course and eaves (starter) course should oversail the fascia by at least 1½" (38mm), so the first course batten should be placed approximately 7½" (190mm) centrally from the start of the roof (see diagram). A second batten should then be placed directly under the first course batten to accommodate the eaves or starter course (made from a cut ¾-slate).

Products related to this literature

View all products (16)
TapcoSlate - Classic Tile - Roofing tile

TapcoSlate - Classic Tile - Roofing tile

TapcoSlate - Classic Ridge End Cap - Pitched roof ridge end cap

TapcoSlate - Classic Ridge End Cap - Pitched roof ridge end cap

TapcoSlate - Classic Ridge To Hip Junction - Pitched roof ridge-to-hip junction

TapcoSlate - Classic Ridge To Hip Junction - Pitched roof ridge-to-hip junction

TapcoSlate - Classic Ridge And Hip Cap - Pitched roof ridge and hip cap

TapcoSlate - Classic Ridge And Hip Cap - Pitched roof ridge and hip cap

More literature from Tapco Roofing Products

View all literature (50)
TapcoSlate Classic BBA Certificate

TapcoSlate Classic BBA Certificate

TapcoSlate Classic ETA Certificate

TapcoSlate Classic ETA Certificate

Protect Wunderlay Membrane Q Mark

Protect Wunderlay Membrane Q Mark

Protect VP300 Membrane Certificate

Protect VP300 Membrane Certificate